HomeMy WebLinkAboutPC Reso No 2013-44RESOLUTION NO. 2013 -44
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE
ELSINORE, CALIFORNIA, APPROVING RESIDENTIAL DESIGN REVIEW NO.
2012 -05
WHEREAS, Pardee Homes has filed an application with the City of Lake Elsinore
requesting Residential Design Review approval for the Living Smart Condominium
Community (Parkside II) and ultimate development within Parcel Map No. 34442 (the
"Project'); and
WHEREAS, the Planning Commission of the City of Lake Elsinore has been
delegated with the responsibility of approving Design Review requests for residential
projects within the Canyon Hills Specific Plan; and
WHEREAS, public notice of the Project has been given, and the Planning
Commission has considered evidence presented by the Community Development
Department and other interested parties at a public hearing held with respect to this
item on February 5, 2013.
NOW, THEREFORE, THE PLANNING COMMISSION OF THE CITY OF LAKE
ELSINORE DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS:
SECTION 1. The Planning Commission has considered the proposed design
and building elevations for the Living Smart Condominium Community and has found
them acceptable. The Planning Commission finds and determines that the Living Smart
Condominium Community design is consistent with Amendment No. 2 of the Canyon
Hills Specific Plan.
SECTION 2. That in accordance with Lake Elsinore Municipal Code Chapter
17.184, the Planning Commission makes the following findings for the approval of
Residential Design Review No. 2012 -05:
1. The project complies with the Goals, Objectives and Policies of the General Plan
and the Canyon Hills Specific Plan Amendment No. 2, as approved.
The General Plan designates the project site as "Canyon Hills Specific Plan." The
Canyon Hills Specific Plan Amendment No. 2 designates the project site as "MF2."
The Living Smart Condominium Community will collectively lead to the construction
of a condominium development that is consistent with Canyon Hills Specific Plan
Amendment No. 2.
2. This project complies with the design directives contained in Chapter 17.184.060
and all other applicable provisions of the Lake Elsinore Municipal Code.
The Project is appropriate to the site and surrounding developments in that it will
result in the construction of detached condominium units in accordance with
appropriate development and design standards contained in Canyon Hills Specific
PLANNING COMMISSION RESOLUTION NO. 2013 -44
PAGE 2 OF 3
Plan Amendment No. 2. The Project creates interest and varying vistas as a person
moves along any street within the Living Smart Condominium Community. The
Project also complements the quality of existing neighboring development and will
continue to provide visually - pleasing design and architecture within the project area.
3. Conditions and safeguards pursuant to Chapter 17.184.070, including guarantees
and evidence of compliance with conditions, have been incorporated into the
approval of the project to ensure development of the property in accordance with the
General Plan, Municipal Code, and Canyon Hills Specific Plan Amendment No. 2.
The Planning Commission has considered the Project and finds that with the
attached conditions of approval, the Project complies with the purposes and
objectives of the General Plan, Municipal Code and Canyon Hills Specific Plan
Amendment No. 2.
SECTION 3. Based upon the evidence presented, the above findings, and the
attached conditions of approval, the Planning Commission hereby approves Design
Review 2012 -05 for the Living Smart Condominium Community (Parkside II).
SECTION 4. This Resolution shall take effect from and after the date of its
passage and adoption.
PASSED, APPROVED AND ADOPTED this 5th day of February 2013, by the
following vote:
Rick Morsch, Chairman
City of Lake Elsinore
ATTEST:
Richard . MacHott
Acting Planning Manager
PLANNING COMMISSION RESOLUTION NO. 2013 -44
PAGE 3 OF 3
STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE )ss.
CITY OF LAKE ELSINORE )
I, Richard J. MacHott, Acting Planning Manager of the City of Lake Elsinore,
California, hereby certify that Resolution No. 2013 -44 as adopted by the Planning
Commission of the City of Lake Elsinore at a regular meeting held on the 5th day of
February 2013, and that the same was adopted by the following vote:
AYES VICE CHAIRMAN O'NEAL, COMMISSIONER BLAKE, COMMISSIONER
GRAY, COMMISSIONER JORDAN
NOES: NONE
ABSENT: NONE
ABSTAIN: NONE
RECUSE: CHAIRMAN MORSCH
Richard J. MacHott
Acting Planning Manager
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2012 -05 FOR
LIVING SMART PARKSIDE
GENERAL
1. The proposed project (Residential Design Review No. 2012 -05) consists of building
design and construction of 78 single - family detached residential condominium units and
related improvements, for a housing project located within Planning Area 36 of Canyon
Hills Specific Plan (Living Smart Parkside).
2. The applicant shall defend (with counsel acceptable to the City), indemnify, and hold
harmless the City, its Officials, Officers, Employees, and Agents from any claim, action,
or proceeding against the City, its Officials, Officers, Employees or Agents to attach, set
aside, void, or annul an approval of the City, its advisory agencies, appeal boards, or
legislative body concerning the project attached hereto.
PLANNING DIVISION
3. Within 30 days of project approval, the applicant shall sign and complete an
"Acknowledgment of Conditions" and shall return the executed original to the
Community Development Department for inclusion in the case records.
4. Design Review approval for Residential Design Review No. 2012 -05 will lapse and be
void unless a building permit is issued within two (2) years of the approval date. An
extension of time, up to one (1) year may be granted by the Community Development
Director prior to the expiration of the initial Design Review approval upon application by
the developer and payment of required fees one (1) month prior to expiration.
5. Conditions of Approval shall be reproduced on page one of building plans submitted to
the Building Division Plan Check. All Conditions of Approval shall be met prior to the
issuance of a Certificate of Occupancy and release of utilities.
6. All site improvements approved with this request shall be constructed as indicated on
the approved site plan and elevations. Revisions to approved site plans or building
elevations shall be subject to the review of the Community Development Director. All
plans submitted for Building Division Plan Check shall conform to the submitted plans
as modified by Conditions of Approval, or the Planning Commission /City Council
through subsequent action.
7. All exterior on -site lighting shall be shielded and directed on -site so as not to create
glare onto neighboring property and streets or allow illumination above the horizontal
plane of the fixture. All light fixtures shall match the architectural style of the building.
8. Applicant shall use roofing materials with Class "A" fire rating.
Planning Commission Approved
February 5, 2013
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2012 -05 FOR
LIVING SMART PARKSIDE
9. The Planning Division shall approve the location of any construction trailers utilized
during construction. All construction trailers shall require a cash bond processed
through the Planning Division.
10. Materials and colors depicted on the plans and materials board shall be used unless
modified by the Community Development Director or designee.
11. Parking stalls shall be developed pursuant to the requirements of the Canyon Hills
Specific Plan.
12. All exposed slopes in excess of three feet (3') in height shall have a permanent irrigation
system and erosion control vegetation installed, approved by the Planning Division.
13.All mechanical and electrical equipment for the building shall be ground mounted. All
outdoor ground or wall mounted utility equipment shall be consolidated in a central
location and architecturally screened along with substantial landscaping, subject to the
approval of the Community Development Director or designee, prior to issuance of
building permit.
14. All front yards and side yards on corner lots shall be properly landscaped with automatic
(manual or electric) irrigation system to provide 100 percent landscape coverage using
a combination of drip and conventional irrigation methods. The final
landscaping /irrigation plan is to be reviewed and approved by the City's Landscape
Architect Consultant and the Community Development Director or designee. A
Landscape Plan check fee will be charged prior to final landscape approval based on
the Consultant's fee plus 40 percent.
• The applicant shall plant street trees, selected from the City's Street Tree List, at
a maximum of 30 feet apart and at least 24 -inch box in size.
• Planting within 15 feet of ingress /egress points shall be no higher than 36 inches.
• The landscape plan shall provide for ground cover, shrubs, and trees and meet
all requirements of the City's adopted Landscape Guidelines. Special attention to
the use of Xeriscape or drought resistant plantings with combination drip
irrigation system to be used to prevent excessive watering.
• All landscape improvements shall be bonded with a 100 percent Faithful
Performance Bond for materials and labor for two years from Certificate of
Occupancy.
• All landscaping and irrigation shall be installed within an affected portion of any
phase at the time a certificate of occupancy is requested for any building.
Planning Commission Approved
February 5, 2013
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2012 -05 FOR
LIVING SMART PARKSIDE
• One of the proposed lots of the Model Home Complex shall be Xeriscaped and
signage provided identifying Xeriscape landscaping.
• The Final landscape plan shall be consistent with any approved site and /or plot
plan.
15.All exposed slopes in excess of three feet in height within the subject tract and within
private lots shall have a permanent irrigation system and erosion control vegetation
installed, as approved by the Planning Division, prior to issuance of certificate of
occupancy.
16.The applicant shall prepare a Wall and Fencing Plan for the area comprising of the
project area, in compliance with the fencing standards within the Zoning Code Section
17.44.130.D and the Canyon Hills Specific Plan, prior to issuance of any building permit,
and subject to the approval of the Community Development Director or designee.
17. Fences located in any front yard shall not exceed three feet in height with the exception
that wrought -iron fences may be five feet in height. Chain link fences shall be
prohibited.
18. Garages shall be constructed to provide a minimum of twenty feet by twenty feet (20' x
20) of interior clear space to accommodate two vehicles.
19.Applicant shall comply with the requirements of the Elsinore Valley Municipal Water
District (EVMWD). Proof shall be presented to the Chief Building Official prior to
issuance of building permits and final approval.
20. Prior to issuance of building permits, applicant shall provide assurance that all required
fees to the Lake Elsinore Unified School District have been paid.
21. Prior to issuance of building permits, applicant shall provide assurance that all
requirements of the Riverside County Fire Department have been met.
22. Provisions of the City's Noise Ordinance shall be satisfied during all site preparation and
construction activity. Site preparation activity and construction shall not commence
before 7:00 AM and shall cease at 5:00 PM, Monday through Friday or 8:00am and
5:00pm on Saturday. Construction activity shall not take place on Sunday, or any Legal
Holidays.
23.The applicant shall place a weatherproof 3' x 3' sign at the entrance to the project site
identifying the approved days and hours of construction activity and a statement that
complaints regarding the operation can be lodged with the City of Lake Elsinore Code
Enforcement Division (951) 674 -3124.
Planning Commission Approved
February 5, 2013
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2012 -05 FOR
LIVING SMART PARKSIDE
24. Construction traffic shall be prohibited from the segment of Lost Road south of the
project site as a construction truck route.
25.The Home Owner's Association shall be established prior to the occupancy release of
the first dwelling unit. The Homeowner's Association shall maintain all project
improvements and facilities, including the private streets, landscaping, park facilities,
and drainage improvements.
26.The applicant shall participate in the City's Lighting and Landscape Maintenance
District.
ENGINEERING
27.Applicant shall comply with all conditions of approval of the underlying Parcel Map
34442 and Conditional Use Permit 2012 -02.
28. Landscaping adjacent to Canyon Hills Road and Hillside Drive shall be placed so as not
to interfere with the sight distance of exiting vehicles.
29. On site storm run -off shall be detained unless otherwise provided for by the underlying
project map.
30. Slopes shall be planted to reduce erosion. Drainage along the slopes shall be
constructed to convey storm flows and nuisance irrigation flows to an established
drainage course.
31. Slopes exceeding thirty feet (30') shall have City Standard concrete drainage ditches
every thirty feet (30') vertical.
32. Primary circulation drive aisle (loop drives) width shall be a minimum thirty six feet (36')
clear. Parking shall not be allowed in any of the drive aisles except at designated
spaces and approved by Riverside County Fire Department.
33. Interior street grades shall not exceed nine percent (9 %) and on -site intersections
approach grades shall not exceed six percent (6 %).
34. Project shall maintain provisions to convey off -site water to the existing public storm
drain system.
35.AII Public Works requirements shall be complied with as a condition of development as
specified in the Lake Elsinore Municipal Code (LEMC) prior to issuance of building
permit.
36. Pay all Capital Improvement and Plan Check fees (LEMC 16.34, Resolution 85 -26).
Planning Commission Approved
February 5, 2013
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2012 -05 FOR
LIVING SMART PARKSIDE
37.Construct all public works improvements per approved street plans (LEMC 12.04).
Plans must be approved and signed by the City Engineer prior to Parcel map approval
(LEMC 16.34).
38. Pay all fees and meet requirements of encroachment permit issued by the Engineering
Division for construction of public works improvements (LEMC 12.08 and Resolution 83-
78).
39.All compaction reports, grade certifications, monument certifications (with tie notes
delineated on 8 /2" x 11" Mylar) shall be submitted to the Engineering Division before
final inspection of public works improvements will be scheduled and approved.
40.The applicant shall install two (2) permanent bench marks to City of Lake Elsinore
Standards and at a location to be determined by City Engineer.
41.Applicant shall obtain all necessary off -site easements for off -site grading from the
adjacent property owners prior to final map approval.
42. Arrangements for relocation of utility company facilities (power poles, vaults, etc.) out of
the roadway or alley shall be the responsibility of the property owner or his agent.
43. Provide street lighting and show lighting improvements as part of street improvement
plans as required by the City Engineer unless otherwise provided.
44. Applicant shall submit a traffic control plan showing all traffic control devices for the tract
to be approved prior to final map approval. All traffic control devices shall be installed
prior to final inspection of public improvements. This includes No Parking and Street
Sweeping Signs for streets within the development.
45.All utilities except electrical over 35 kv shall be placed underground, as approved by the
serving utility.
46.Apply and obtain a grading permit with appropriate security prior to building permit
issuance. A grading plan signed and stamped by a Calif. Registered Civil Engineer is
required. Developer shall execute and submit grading and erosion control agreement,
post grading security and pay permit fees as a condition of grading permit issuance
47. Provide soils, geology and seismic report including street design recommendations.
Provide final soils report showing compliance with recommendations or provide a letter
stamped by a licensed geologist or geotechnical engineer stating the project is outside
the zone.
Planning Commission Approved
February 5, 2013
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2012 -05 FOR
LIVING SMART PARKSIDE
48.A geologic study shall be performed on the site to identify any earthquake faults and /or
liquefaction zones present on -site unless provided by underlying subdivision map.
49.All grading shall be done under the supervision of a geotechnical engineer and he shall
certify all slopes steeper than 2 to 1 for stability and proper erosion control. All
manufactured slopes greater than 30 ft. in height shall be contoured.
50. Prior to commencement of grading operations, developer is to provide to the City with a
map of all proposed haul routes to be used for movement of export material. All such
routes shall be subject to the review and approval of the City Engineer. Haul route shall
be submitted prior to issuance of a grading permit. Hauling in excess of 5,000 cy shall
be approved by City Council. (LEMC 15.72.065)
51. Applicant to provide to the City a video record of the condition of all proposed public City
haul roads. In the event of damage to such roads, applicant shall pay full cost of
restoring public roads to the baseline condition. A bond may be required to ensure
payment of damages to the public right -of -way, subject to the approval of the City
Engineer.
52. Drainage easements shall be kept free of buildings and obstructions.
53. Drainage across property lines shall not exceed that which existed prior to grading.
Excess or concentrated drainage shall be contained on site or directed to an approved
drainage facility. Erosion of the ground in the area of discharge shall be prevented.
54. Submit Hydrology and Hydraulic Reports for review and approval by City Engineer prior
to approval of final map. Developer shall mitigate any flooding and /or erosion caused by
development of site and diversion of drainage.
55. Storm drain inlet facilities shall be appropriately marked using the City of Lake Elsinore
authorized detail to prevent illegal dumping in the drain system.
56. Roof and yard drains shall not be allowed to connect directly through cuts in the street
curb. Roof drains shall drain through minimum 20 -feet of landscaped area prior to
entering into a closed drainage system in compliance with City of Lake Elsinore
Standard 330 or drain to a landscape area.
57. In accordance with the City's Franchise Agreement for waste disposal and recycling, the
applicant shall be required to contract with CR &R, Inc., for removal and disposal of all
waste material, debris, vegetation and other rubbish generated during cleaning,
demolition, clear and grubbing or all other phases of construction.
Planning Commission Approved
February 5, 2013
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2012 -05 FOR
LIVING SMART PARKSIDE
58. Underground water rights shall be dedicated to the City pursuant to the provisions of
Section 16.52.030 (LEMC), and consistent with the City's agreement with the Elsinore
Valley Municipal Water District.
59. All slopes and landscaping within public right -of -way shall be maintained by the property
owner or property owner's association or another maintenance entity approved by the
City Council.
60.All open space and slopes except for public parks and schools and flood control district
facilities, outside the public right -of -way shall be owned and maintained by property
owner or property owner's association.
61. Developer shall mitigate to prevent any flooding and /or erosion downstream caused by
development of the site and or diversion of drainage.
62.Any grading that affects "waters of the United States', wetlands or jurisdictional
streambeds, shall require approval and necessary permits from respective Federal
and /or State agencies.
63.The developer shall provide a copy of an encroachment permit or any approval
documents from the Riverside County Flood Control District for encroaching, grading, or
discharging into County flood control facilities.
64.All required soils, geology, hydrology and hydraulic, and seismic reports shall be
prepared by a Registered Civil Engineer or geologist.
STORM WATER MANAGEMENT / POLLUTANT PREVENTION
65.The developer shall provide erosion control measures and best management practices
(BMP's) as part of their grading and improvement plans. The developer shall ensure
protection of storm water quality and meet the goals of the California Green Building
Standards Code and in the Riverside County NPDES Drainage Area Management Plan.
66.The developer shall provide BMP's that will reduce storm water pollutants from parking
areas and driveway aisles.
67. Education guidelines and Best Management Practices (BMP) shall be provide to
residents of the development in the use of herbicides, pesticides, fertilizers as well as
other environmental awareness education materials on good housekeeping practices
that contribute to protection of storm water quality and met the goals of the BMP in
Supplement "A" in the Riverside County NPDES Drainage Area Management Plan.
(Required for lot of one acre or more).
Planning Commission Approved
February 5, 2013
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2012 -05 FOR
LIVING SMART PARKSIDE
68.The developer shall prohibit the discharge of waste into the storm drain system or local
surface waters in accordance with City of Lake Elsinore ordinances for storm water
management and discharge control and with state and federal law. This includes non -
storm water discharges containing oil, grease, detergents, trash, or other waste
remains. Brochures of "Storm water Pollution, What You Should Know" describing
preventing measures are available at City Hall.
69.Both a Storm Water Pollution Prevention Plan (SWPPP) and a Water Quality
Management Plan (WQMP) for post construction are required for this project.
70.A final WQMP shall be submitted to the City Engineering Division for review and
approval prior to issuance of ANY PERMIT for construction (grading or building).
71. Identified pollutants of concern must be treated prior to any non - stormwater discharge
leaving the site.
72. The WQMP shall demonstrate that discharge flow rates, velocities, duration and volume
for the post construction condition from a 2 year and 10 year 24 hour rainfall event will
not cause significant adverse impacts on downstream erosion and receiving waters, or
measures are implemented to mitigate significant adverse impacts to downstream
public facilities and water bodies. The WQMP shall provide measures to minimize the
impact from the pollutants of concern and hydrologic conditions of concern identified for
the project. Where the pollutants of concern include pollutants that are listed as
causing or contributing to impairments of receiving waters, BMPs must be selected so
that the project does not cause or contribute to an exceedance of water quality
objectives. The WQMP shall provide information regarding design considerations, and
the long -term operation and maintenance requirements for BMPs requiring long -term
maintenance as well as the mechanism for funding the long -term operation and
maintenance of the BMPs.
73-The grading and /or improvement plan shall include a table listing each stormwater
facility, and the plan sheet where it appears.
74. The occupant or owner must maintain records of stormwater facility maintenance, and
submit to City Staff inspections of Stormwater BMPs. Where City Staff allow or require
self - certifications, the occupant or owner must certify Stormwater BMPs are properly
maintained and submit reports, prepared and certified by a P.E., to City staff upon their
request. Certification by the City Staff may be required.
75.DURING CONSTRUCTION, NPDES education guidelines and Best Management
Practices (BMPs) shall be posted to inform users of this development of environmental
awareness and good housekeeping practices that contribute to protection of storm
water quality and meet the goals of the BMPs in Supplement "A" of the Riverside
Planning Commission Approved
February 5, 2013
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2012 -05 FOR
LIVING SMART PARKSIDE
County NPDES Drainage Area Management Plan (Required for lots of one acre or more
or lots that are part of a larger common plan (ex. shopping center infill lot).
IMPROVEMENTS
76. Install a root barrier for the dripline of trees installed within 6 feet of the sidewalk.
77. Re -align angle of private driveway A at Hillside Drive to align with Canyon Rim Road.
78. Show secondary access on all plans.
79. Traffic Study required for impacts to Hillside Drive and Canyon Hills Road. Comply
with mitigation measures identified therein.
80. An Encroachment Permit shall be obtained prior to any work on City and /or State right -
of -way. The developer shall submit the permit application, required fees and
documents prior to issuance.
81. Sight distance into and out of the project location shall comply with CALTRANS
Standards.
82. The developer shall coordinate with Riverside Transit Authority for location and
installation of bus transit facilities.
83. If existing improvements are to be modified, the existing improvement plans on file shall
be modified accordingly and approved by the City Engineer prior to issuance of building
permit.
84. 10 year storm runoff shall be contained within the curb and the 100 year storm runoff
shall be contained within the street right -of -way. When either of these criteria are
exceeded, drainage facilities shall be provided.
85. All drainage facilities in this project shall be constructed to Riverside County Flood
Control District Standards.
86. A drainage study shall be provided. The study shall identify the following: identify storm
water runoff from and upstream of the site; show existing and proposed off -site and
onsite drainage facilities; and include a capacity analysis verifying the adequacy of the
facilities. The drainage system shall be designed to ensure that runoff from a 10 -yr
storm of 6 hours or 24 hours duration under developed condition is equal or less than
the runoff under existing conditions of the same storm frequency. Both 6 hour and
24hour storm duration shall be analyzed to determine the detention basin capacities
necessary to accomplish the desired results.
Planning Commission Approved
February 5, 2013
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2012 -05 FOR
LIVING SMART PARKSIDE
87. All natural drainage traversing the site shall be conveyed through the site, or shall be
collected and conveyed by a method approved by the City Engineer. All off -site
drainage, if different from historic flow, shall be conveyed to a public facility, accepted
by adjacent property owners by a letter of drainage acceptance, or conveyed to a
drainage easement.
88. The site shall be planned and developed to keep surface water from entering buildings
(California Green Building Standards Code 4.106.3).
89. All streets shall be constructed per Lake Elsinore City Standards. Any deviation from
City standards shall be approved by the City Engineer.
90. The developer shall implement mitigation measures identified in the Traffic Analysis.
91. The developer shall submit street improvement plans prepared by a Registered Civil
Engineer and the plans shall include curb and gutter, sidewalk, ac pavement, street
lighting, median, trail, and drainage improvements.
92. The developer shall provide signing and striping plans for the required improvements of
this project.
93. The terminus of Private Driveway "N" shall include sufficient turnarounds for emergency
vehicles.
PRIOR TO GRADING PERMIT
94. A grading plan signed and stamped by a California Registered Ciil Engineer shall be
submitted for City review and approval for all addition and /or movement of soil (grading)
on the site. The plan shall include separate sheets for erosion control, haul route and
traffic control. The grading submittal shall include all supporting documentation and be
prepared using City standard title block, standard drawings and design manual
(available at www.lake- elsinore.ora).
95. No grading shall be performed without first having obtained a permit. A grading permit
does not include the construction of retaining walls or other structures.
96. Export and import sites located within the Lake Elsinore City limits must have an active
grading permit.
97. All grading plan contours shall extend to minimum of 50 feet beyond property lines to
indicate existing drainage pattern.
98. If the grading plan identifies alterations in the existing drainage patterns as they exit the
site, a Hydrology and Hydraulic Report for review and approval by City Engineer shall
Planning Commission Approved
February 5, 2013
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2012-05 FOR
LIVING SMART PARKSIDE
be required prior to issuance of grading permits. All grading that modifies the existing
flow patterns and /or topography shall be approved by the City Engineer.
99. The developer shall apply for, obtain and submit to the City Engineering Division a letter
from Southern California Edison (SCE) indicating that the construction activity will not
interfere with existing SCE facilities (aka SCE NIL).
100. The developer shall obtain all necessary off -site easements and /or permits for off -site
grading and /or drainage acceptance from the adjacent property owners.
101. A preconstruction meeting with the City Public Works Inspector (Engineering Division) is
required prior to commencement of ANY grading activity.
102. Developer shall provide the city with a copy of the Notice of Intent (NOI) and Waste
Discharge Identification (WDID) letter issued by the Regional Water Quality Control
Board for the National Pollutant Discharge Elimination System (NPDES) program.
103. A copy of the current SWPPP shall be kept at the project site and be available for
review upon request.
104. Approval of the project Water Quality Management Plan (WQMP) for post construction
shall be received prior to issuance of a grading permit.
105. Submit an approved environmental clearance document to the Engineering Division.
This approval shall identify and clear all proposed grading activity anticipated for this
project.
PRIOR TO ISSUANCE OF BUILDING PERMIT
106. All required public right -of -way dedications and easements shall be prepared by the
developer or his agent and shall be submitted to the Engineering Division for review and
approval prior to issuance of building permit.
107. The Parcel Map shall be recorded.
108. All street improvement plans, traffic signal plans, and signing and striping plans shall be
completed and approved by the City Engineer per a Traffic Impact Analysis.
PRIOR TO OCCUPANCY
109. Following construction and prior to Certificate of Occupancy /Final sign -off, submit a final
Stormwater Facility Operation and Maintenance Plan and formally transfer responsibility
for maintenance to the HOA, owner, or permanent occupant.
Planning Commission Approved
February 5, 2013
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2012 -05 FOR
LIVING SMART PARKSIDE
110. All signing and striping and traffic control devices for the required improvements of this
development shall be installed.
111. All public improvements shall be completed in accordance with the approved plans or
as condition of this development to the satisfaction of the City Engineer.
112. Proof of acceptance of maintenance responsibility of slopes, open spaces, landscape
areas, and drainage facilities shall be provided.
113. All improvement plans and recorded maps shall be digitized. The developer shall submit
tapes and /or discs which are compatible with City's ARC Info /GIS.
114. Final soil report showing compliance with recommendations, compaction reports, grade
certifications, monument certifications (with tie notes delineated on 8 '/z x 11" mylar)
shall be submitted in .tif format on CD to the Engineering Division before final inspection
will be scheduled.
115. All required public right -of -way dedications, easements, dedications and vacations and
easement agreement(s) for ingress and egress through adjacent property(ies)shall be
recorded with a recorded copy provided to the City prior to final project approval.
116. Documentation of responsibility for slope maintenance along right -of -ways and open
spaces to be maintained by the HOA or other entity shall be provided in a recordable
format and recorded prior to occupancy /final.
117. The developer shall pay fee in -lieu of construction of future median improvements on
Hillside Drive. The fee shall be equal to current cost estimate for improvements
(including contingency) plus an additional 15% of the total construction cost estimate to
cover design and administrative costs. The cost estimate shall be approved by City
staff.
118. In the event of damage to City roads from hauling or other construction related activity,
applicant shall pay full cost of restoring public roads to the baseline condition.
119. Prior to grading or building permit close -out and /or the issuance of a certificate of use or
a certificate of occupancy, developer shall:
a. Demonstrate that all structural BMPs have been constructed, installed and are
functioning in conformance with approved plans and specifications and the WQMP;
b. Demonstrate that they are prepared to implement all non - structural BMPs included
in the conditions of approval or building /grading permit conditions;
c. Demonstrate that an adequate number of copies of the approved project specific
WQMP are available for the future owners /occupants; and
Planning Commission Approved
February 5, 2013
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2012 -05 FOR
LIVING SMART PARKSIDE
d. The developer shall provide all education guidelines for Water Quality Management
Practices to the tenants, operators and owners of the businesses of the
development, regarding the environmental awareness on good housekeeping
practices that contribute to protection of storm water quality and meet the goals of
the approved WQMP in the Riverside County NPDES Drainage Area Management
Plan. Contact the City NPDES Coordinator for handout/guideline information.
120. The property owner (aka Legally Responsible Party) shall execute and cause to be
recorded a "Covenant and Agreement' in the form provided by the City to inform future
property owners of the requirement to implement the approved final project- specific
WQMP.
121. Developer shall pay all outstanding applicable processing and development fees
including but not all inclusive: TUMF, MSHCP, TIF, Stephens Kangaroo Rat Habitat and
area drainage prior to occupancy /final approval.
122. As -built plans for all approved plan sets shall be submitted for review and approval by
the City. The developer /owner is responsible for revising the original mylar plans to
reflect the approved as builts. Once the revised original mylars have been approved,
the developer shall provide the City with a CD /DVD of the "as built' plans in .tif format.
123. All final studies and reports shall be submitted in .tif format on a CD /DVD. Studies and
reports include, Soils, Seismic, Hydrology, Hydraulics, Grading, SWPPP, WQMP, etc.
124. Provide on compact disc GIS Shape files of all final maps and street and storm drain
plans. *ALL DATA MUST BE IN projected Coordinate System: NAD 83 State Plane
California Zone VI U.S. Fleet.
125. All private drives shall meet with fire requirements with respect to road width, street
slope and curve radius in place at the time of City Council approval.
126. Landscaping adjacent to Hillside Drive shall be placed so as not to interfere with the
sight distance of exiting vehicles.
127. On site storm run -off shall be detained unless otherwise provided for by the underlying
project map.
128. Slopes shall be planted to reduce erosion. Drainage along the slopes shall be
constructed to convey storm flows and nuisance irrigation flows to an established
drainage course.
129. Confirm existing easement for storm drain traversing the site from driveway "A" through
the site unless otherwise provided.
Planning Commission Approved
February 5, 2013
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2012 -05 FOR
LIVING SMART PARKSIDE
COMMUNITY SERVICES DEPARTMENT
130. Applicant shall pay applicable park fees unless documentation is provided otherwise.
131. No park credits shall be given for private park areas, open space, or recreation facilities
constructed within the development.
132. The developer shall utilize CR &R for all construction debris removal, hauling, and
recycling as per City ordinance.
133. The City landscape architect shall review and approve all landscaping plans.
134. The Home Owner's Association (HOA) shall maintain all landscaped areas including
landscaping fronting Canyon Hills Road and Hillside Drive, open space, water quality
basin and all interior plantings.
135. The Home Owner's Association (HOA) shall maintain all block walls and keep them free
of graffiti.
136. All interior roads, street signs, street markings, sidewalks, enhanced concrete to be
maintained by the Home Owner's Association (HOA).
137. Water quality basin outlet to meet all requirements of the Riverside County Flood
Control, Army Corps of Engineers and the City of Lake Elsinore.
DEPARTMENT OF ADMINISTRATIVE SERVICES
138. Prior to the issuance of the first building permit, the applicant shall annex into
Community Facilities District 2003 -01 to offset the annual negative fiscal impacts of the
project on public safety operations and maintenance issues in the City.
139. Prior to the issuance of the first building permit, the applicant shall annex into Lighting
and Landscape Maintenance District No.1 to offset the annual negative fiscal impacts of
the project on public right -of -way landscaped areas to be maintained by the City and for
street lights in the public right -of -way for which the City will pay for electricity and a
maintenance fee to Southern California Edison.
RIVERSIDE COUNTY FIRE DEPARTMENT
140. The applicant shall comply with all requirements of the Riverside County Fire
Department. Fire protection measures shall be provided in accordance with Riverside
County ordinances and /or recognized fire protection standards.
Planning Commission Approved
February 5, 2013
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2012 -05 FOR
LIVING SMART PARKSIDE
141. Blue retro reflective pavement markers shall be mounted on private streets, public
streets and driveways to indicate location of fire hydrants. Prior to installation,
placement of markers must be approved by the Riverside County Fire Department.
142. Schedule A fire protection approved standard fire hydrants, (6 "x 4 "x 2'/2') locate one at
each street intersection and space no more than 500 feet apart in any direction, with no
portion of any lot frontage more than 250 feet from hydrant. Minimum fire flow shall be
1000 GPM for 2 hour duration at 20 PSI. Shall include perimeter streets at each
intersection and spaced 660 feet apart.
143. The applicant or developer shall furnish one copy of the water system plans to the Fire
Department for review. Plans shall be signed by a registered civil engineer, containing a
Fire Department approval signature block, and shall conform to hydrant type, location,
spacing and minimum fire flow. Once plans are signed by local water company, the
originals shall be presented to the Fire Department for signature.
144. Environmental Constraint Sheet (ECS) map must be stamped by Riverside County
Surveyor with the following Note: The required water system, including fire hydrants,
shall be installed and accepted by the appropriate water agency prior to any
combustible building material placed on an individual lot.
145. Prior to the release of your installation, site prep and /or building permits from Building
and Safety. Written certification from the appropriate water district that the required fire
hydrant(s) are either existing or that financial arrangements have been made to provide
them.
146. Also a map or APN page showing the location of the fire hydrant and access to the
property.
147. Install Fire Sprinkler System per NFPA 13D 2010 Edition Plans must be submitted to
the Riverside County Fire Dept. for review and approval prior to installation.
Planning Commission Approved
February 5, 2013