HomeMy WebLinkAboutItem No. 2.tifCITY OF
LADE
TO:
FROM:
DATE:
LSMORE
DREAM EXTREME.
REPORT TO PLANNING COMMISSION
HONORABLE CHAIRMAN
AND MEMBERS OF THE PLANNING COMMISSION
RICHARD J. MACHOTT,
ACTING PLANNING MANAGER
FEBRUARY 5, 2013
PROJECT: RESIDENTIAL DESIGN REVIEW NO. 2012-05.7- A REQUEST
BY PARDEE HOMES FOR APPROVAL OF BUILDING
DESIGNS FOR 78 SINGLE - FAMILY DETACHED RESIDENTIAL
CONDOMINIUM UNITS AND RELATED IMPROVEMENTS, FOR
A HOUSING PROJECT LOCATED WITHIN PLANNING AREA
36 OF CANYON HILLS SPECIFIC PLAN (LIVING SMART
PARKSIDE)
APPLICANT /: PARDEE HOMES, 10880 WILSHIRE BOULEVARD, SUITE
OWNER 1900, LOS ANGELES CA 90024
Project Request
The applicant is requesting approval of Residential Design Review No. 2012 -05 to allow
for design and construction of 78 single - family detached residential condominium units
and related improvements for a housing project located within Planning Area 36 of the
Canyon Hills Specific Plan (Living Smart Parkside).
Project Location
The Canyon Hills Specific Plan area is located within the eastern boundaries of the City
of Lake Elsinore and east of the 1 -15 Freeway. Planning Area 36 encompasses 18.3
gross acres and is located on the north side of Canyon Hills Road, west of Hillside
Drive. Residential Design Review No. 2012 -05 apply to approximately '/z of the
Planning Area. Attachment 1 presents the location of the identified Planning Area within
the Specific Plan.
PC February 5, 2013 Item No. 2
Page 1 of 33
PLANNING COMMISSION STAFF REPORT
RDR NO. 2012 -05 — LIVING SMART PARKSIDE
FEBRUARY 5, 2013
Environmental Setting
Project
Vacant
Multi - Family Residential (MF2)
Canyon
Hills
Specific
Site
Canyon Hills Specific Plan '
Plan
North
Vacant
Open Space (OS) Canyon Hills
Canyon
Hills
Specific
Specific Plan
Plan
South
Vacant
Multi - Family Residential (MF2)
Canyon
Hills
Specific
PA 36)
Canyon Hills Specific Plan
Plan
East
Single- Family
Single Family Residential (SF3)
Canyon
Hills
Specific
Residential
(PA 21), Canyon Hills Specific
Plan
(PA 21 )
Plan
West
Vacant
Open Space (OS; Community
Canyon
Hills
Specific
Park (PA 18), Canyon Hills
Plan
Specific Plan
Background
In February and March of 2012, the Planning Commission and City Council approved
Residential Review No. 2012 -01, Conditional Use Permit No. 2012 -02 and a revision to
Tentative Parcel Map No. 34442. Subsequently, in September 2012, the City Council
Approved Final Parcel Map No. 34442. Residential Review No. 2012 -01 covered
Parcel 1 of Parcel Map No. 34442, and Residential Design Review No. 2012 -05 covers
Parcel 2 of the same map as a continuation of the currently constructed Parkside
detached condominium project. Due to the overwhelming sales success of the Parkside
Project, Pardee Homes wishes to extend the production of the exact same housing on
Parcel 2 as in Parcel 1 utilizing the existing model complex located within Parcel 1.
Residential Design Review No. 2012 -05
The following describes the various design components and features of the proposed
Living Smart Parkside Condominium Community including circulation and parking
layout, floor plans, landscaping, walls and fences; and architecture.
Circulation and Parkinq Layout
Access will be provided along Hillside Drive via a 36 -foot entry. The streets within the
site are private streets and will be maintained by the Home Owner's Association (HOA).
The width of the private streets allows for vehicular circulation and street parking on
both sides. The roadway is comprised of a 40 -foot right -of -way, with two 18 -foot travel
ways, and a four -foot sidewalk.
The project provides two enclosed parking spaces per dwelling unit. In addition, 104
PC February 5, 2013 Item No. 2
Page 2 of 33
PLANNING COMMISSION STAFF REPORT
RDR NO. 2012 -05 — LIVING SMART PARKSIDE
FEBRUARY 5, 2013
open guest parking spaces will be provided at strategic locations throughout the
community. A total of 260 parking spaces will be provided. The Specific Plan requires
182 parking spaces.
Floor Plans for Living Smart Condominium Residences
The proposed Living Smart Condominium Project'would offer the exact same plans as
being constructed in the adjacent Parcel. They are described below:
1. Plan 1: Two -story 1,628 square foot units with three bedrooms; 2.5 baths; great
room, dining room, kitchen, laundry; two -car garage, and a covered porch entry.
2. Plan 2: Two -story 1,760 square foot units with three bedrooms; 2.5 baths; great
room, dining room, kitchen, den, laundry; two -car garage, and a covered porch
entry. Optional bedroom four at the den is offered.
3. Plan 3: Two -story 1,919 square foot units with four bedrooms; 3.0 baths; great
room, dining room, kitchen, laundry; two -car garage, and a covered porch entry.
Architecture and Treatments for Living Smart Condominium Residences
The proposed Living Smart project would offer three architectural styles and treatments
for each of the proposed plans, including Spanish, Traditional, and French. The
following describes each of these architectural styles:
• The Spanish Architectural Style includes concrete "S" tile roof, decorative pipe
vents at front gable ends, plank shutters, stucco window trim, and arched entries.
• The Traditional Architectural Style includes concrete flat tile roofs, horizontal
siding accents at front gable ends, decorative shutters, vertical windows with
stucco trim, and brick veneer.
• The French Architectural Style includes concrete flat tile roofs, clipped gables,
stone veneer, wood outlookers, and decorative shutters.
It should also be noted that enhanced, four -sided architectural treatments in the form of
window surrounds will be provided for all the proposed residences as a standard
feature.
Living Smart Features
The proposed residences will feature a comprehensive approach to earth - friendly and
energy- saving design. Pardee Homes, a certified California Green Builder, will
incorporate Living Smart Features and improvements into each of the constructed
residences. The Living Smart concept is defined as being "EnergySmart", "EarthSmart",
PC February 5, 2013 Item No. 2
Page 3 of 33
PLANNING COMMISSION STAFF REPORT
RDR NO. 2012 -05 — LIVING SMART PARKSIDE
FEBRUARY 5, 2013
"WaterSmart", and "HealthSmart", and is intended to promote health as well as
conserve energy, water and other vital resources.
Model Home Complex
The existing Model Home Complex located within Parcel 1 will be utilized for the
production homes located within this Parcel (Parcel 2). The existing models include two
plans, Plans 2 and 3. A sales trailer is also located adjacent to the Plan 2 Model.
Conceptual Wall and Fence Plan
To ensure design consistency, the Conceptual Wall and Fence Plan for the project
shows that those similar walls and fences that are provided within and surrounding the
existing adjacent detached - condominiums will continue to be provided within the
proposed project. Perimeter walls will be split face block with pilasters and tubular steel
fencing adjacent the Community Park and large landscaped lot adjacent Canyon Hills
Road. The pilasters will have appointed and bull -nose caps. Six -foot wood and /or
tubular steel fences will be provided between the condominiums. Front returns will be
six -foot concrete block walls.
ANALYSIS
City Planning and Engineering Staff have reviewed the requested Design Review
application and have no concerns. Staff believes that those design amenities and
features associated with the project's siting; circulation and parking layout; landscaping;
monumentation, walls and fences; and architecture have resulted in a well- designed
condominium community. Staff believes that the project is compatible with the overall
Canyon Hills Specific Plan area and those existing and future developments that
neighbor the project site.
Environmental Determination
Environmental analysis and clearance for the proposed Design Review application is
provided by the 2003 Addendum to the 1989 Final Canyon Hills Specific Plan
Environmental Impact Report (EIR). The 2003 Addendum to the EIR (Addendum) was
prepared in accordance with Section 15164 of the CEQA Guidelines and was approved
by the City Council in late 2003. The proposed Project is consistent with the Canyon
Hills Specific Plan Amendment No. 2 and therefore, will not conflict with the analysis
and findings of the 2003 Addendum. The 2003 Addendum concluded that all impacts
would be less than significant with implementation of those mitigation measures
contained in the original 1989 Final Canyon Hills Specific Plan EIR and carried forward
to the 2003 Addendum. It should also be noted that the project is exempt from the
Multiple Species Habitat Conservation Plan (MSHCP). Further environmental action is
not required pursuant to CEQA Guidelines Section 15162.
PC February 5, 2013 Item No. 2
Page 4 of 33
PLANNING COMMISSION STAFF REPORT
RDR NO. 2012 -05 — LIVING SMART PARKSIDE
FEBRUARY 5, 2013
Recommendation
It is recommended that the Planning Commission adopt Resolution No. 2013 -_ making
findings that the project is exempt from the MSHCP, and Resolution No. 2013 -
approving Residential Design Review No. 2012 -05, for the Living Smart Parkside
Condominium Community based on the Findings, Exhibits and Conditions of Approval
attached to this Staff Report.
PREPARED BY: Kirt A. Coury
Project Planner
APPROVED BY: Richard J. MacHott �
Acting Planning Mana er
ATTACHMENTS
1. Vicinity Map
2. Planning Commission Resolutions
3. Conditions of Approval
4. Color and Materials booklet including Site Plan, Building Elevations, Floor
Plans, Conceptual Wall and Fence Plan, etc.
PC February 5, 2013 Item No. 2
Page 5 of 33
U O
) co
O U
O
CL, J
l
a
z
O
i < _
Q W Q N Y
p O j N
x '- i •- J rc
W � Q
p O Q ¢l O 2
OOCO" --
fi00 -
0�00
O O
OOCO ��
C
O COO
LOCO
O O
0000
O C
Canyon
Hills
VICINITY MAP
PC February 5, 2013 Item No. 2
Page 6 of 33
0
m
Wo
z
x
�
i
z
o
N
z
K
p
z
Z
Z
>
0
o
Qo
p
Z
Z
U
f
R
I
m
s
i
i
a
z
O
i < _
Q W Q N Y
p O j N
x '- i •- J rc
W � Q
p O Q ¢l O 2
OOCO" --
fi00 -
0�00
O O
OOCO ��
C
O COO
LOCO
O O
0000
O C
Canyon
Hills
VICINITY MAP
PC February 5, 2013 Item No. 2
Page 6 of 33
RESOLUTION NO. 2013-
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
LAKE ELSINORE, CALIFORNIA, ADOPTING FINDINGS THAT THE
PROJECT IS EXEMPT FROM THE MULTIPLE SPECIES HABITAT
CONSERVATION PLAN (MSHCP)
WHEREAS, Pardee Homes filed an application with the City of Lake Elsinore
requesting approval of Residential Design Review No. 2012 -05 for the construction and
establishment of 78 individually -owned detached condominium units within the Living
Smart Condominium Community of the Canyon Hills Specific Plan area (the "Project ");
and
WHEREAS, Section IV(D) of the City of Lake Elsinore's MSHCP Implementing
Resolution expressly exempts from the MSHCP:
Any project for which and to the extent that vested rights to proceed with
the project notwithstanding the enactment of this Resolution exist under
the common laws of the State of California, a vesting tentative map
pursuant to the Subdivision Map Act, a development agreement pursuant
to Government Code section 65864 et seq., or other instrument, approved
or executed by the City prior to adoption of this Resolution. Projects
subject to this exemption must comply with all provisions of any applicable
state and federal law.
WHEREAS, public notice of the Project has been given, and the Planning
Commission has considered evidence presented by the Community Development
Department and other interested parties at a public hearing held with respect to this
item on February 5, 2013.
NOW, THEREFORE, THE PLANNING COMMISSION OF THE CITY OF LAKE
ELSINORE DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS:
SECTION 1. That in accordance with the Lake Elsinore Municipal Code and the
MSHCP, the Planning Commission finds that:
The Project is exempt from the City's MSHCP Resolution by virtue of vested
rights. On July 9, 1990, the City and Pardee - Grossman /Cottonwood Canyon
entered into that certain development agreement (the "Development
Agreement'), which expressly exempted the Developer from responsibility for
any new development impact fees. The Development Agreement was amended
by Amendment No. 1 dated January 12, 2010, approved by Ordinance No. 1270
which extends the project's exemption from MSHCP requirements.
Even though the Project is exempt from the MSHCP, the Developer must comply
with other state and federal laws. Consistent with federal law, the applicant had
prepared a project- specific Habitat Conservation Plan and has a history of
extensive coordination with the wildlife agencies. Where approved for
PC February 5, 2013 Item No. 2
Page 7 of 33
PLANNING COMMISSION RESOLUTION NO. 2013 -
PAGE 2 OF 3
development, the project site has already been graded, cleared, or developed in
accordance with the Project HCP. Given the foregoing, no further action
regarding the MSCHP is required.
SECTION 2. This Resolution shall, take effect from and after the date of its
passage and adoption.
PASSED, APPROVED AND ADOPTED this 5th day of February 2013, by the
following vote:
ATTEST:
Richard J. MacHott
Acting Planning Manager
STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE )ss.
CITY OF LAKE ELSINORE )
Rick Morsch, Chairman
City of Lake Elsinore
PC February 5, 2013 Item No. 2
Page 8 of 33
PLANNING COMMISSION RESOLUTION NO. 2013-
PAGE 3 OF 3
I, Richard J. MacHott, Acting Planning Manager of the City of Lake Elsinore,
California, hereby certify that Resolution No. 2013 -_ as adopted by the Planning
Commission of the City of Lake Elsinore at a regular meeting held on the 5th day of
February 2013, and that the same was adopted by the following vote: '
AYES
NOES:
ABSENT:
ABSTAIN:
Richard J. MacHott
Acting Planning Manager
PC February 5, 2013 Item No. 2
Page 9 of 33
RESOLUTION NO. 2013-
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE
ELSINORE, CALIFORNIA, APPROVING RESIDENTIAL DESIGN REVIEW NO.
2012 -05
WHEREAS, Pardee Homes has filed an application with the City of Lake Elsinore
requesting Residential Design Review approval for the Living Smart Condominium
Community (Parkside II) and ultimate development within Parcel Map No. 34442 (the
"Project "); and
WHEREAS, the Planning Commission of the City of Lake Elsinore has been
delegated with the responsibility of approving Design Review requests for residential
projects within the Canyon Hills Specific Plan; and
WHEREAS, pursuant to the California Environmental Quality Act (Cal. Pub. Res.
Code §§ 21000 et seq.: "CEQA ") and the CEQA Guidelines (14 C.C.R. §§ 15000 et
seq.), public agencies are expressly encouraged to reduce delay and paperwork
associated with the implementation of CEQA by using previously prepared
environmental documents when those previously prepared documents adequately
address the potential impacts of the proposed project (CEQA Guidelines Section
15006); and
WHEREAS, CEQA Guidelines Section 15162 establishes the standard to be
used when determining whether subsequent environmental documentation is necessary
and says that when an environmental document has already been adopted for a project,
no subsequent environmental documentation is needed for subsequent entitlements
which comprise the whole of the action unless substantial changes or new information
are presented by the project; and
WHEREAS, the 1989 Final Environmental Impact Report for the Canyon Hills
Specific Plan (SCH #87111606: the "FEIR ") and the 2003 Addendum to FEIR,
collectively, evaluated environmental impacts that would result from maximum build -out
of the specific plan; and
WHEREAS, the Activity comprises part of the whole of the action and does not
present substantial changes or new information regarding the potential environmental
impacts of the project; and
WHEREAS, public notice of the Project has been given, and the Planning
Commission has considered evidence presented by the Community Development
Department and other interested parties at a public hearing held with respect to this
item on February 5, 2013.
NOW, THEREFORE, THE PLANNING COMMISSION OF THE CITY OF LAKE
ELSINORE DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS:
PC February 5, 2013 Item No. 2
Page 10 of 33
PLANNING COMMISSION RESOLUTION NO. 2013-_
PAGE 2 OF 4
SECTION 1. The Planning Commission has considered the proposed design
and building elevations for the Living Smart Condominium Community and has found
them acceptable. The Planning Commission finds and determines that the Living Smart
Condominium Community design is consistent with Amendment No. 2 of the Canyon
Hills Specific Plan. .
SECTION 2. That in accordance with Lake Elsinore Municipal Code Chapter
17.184, the Planning Commission makes the following findings for the approval of
Residential Design Review No. 2012 -05:
1. The project complies with the Goals, Objectives and Policies of the General Plan
and the Canyon Hills Specific Plan Amendment No. 2, as approved.
The General Plan designates the project site as "Canyon Hills Specific Plan." The
Canyon Hills Specific Plan Amendment No. 2 designates the project site as "MF2."
The Living Smart Condominium Community will collectively lead to the construction
of a condominium development that is consistent with Canyon Hills Specific Plan
Amendment No. 2.
2. This project complies with the design directives contained in Chapter 17.184.060
and all other applicable provisions of the Lake Elsinore Municipal Code.
The Project is appropriate to the site and surrounding developments in that it will
result in the construction of detached condominium units in accordance with
appropriate development and design standards contained in Canyon Hills Specific
Plan Amendment No. 2. The Project creates interest and varying vistas as a person
moves along any street within the Living Smart Condominium Community. The
Project also complements the quality of existing neighboring development and will
continue to provide visually - pleasing design and architecture within the project area.
3. Conditions and safeguards pursuant to Chapter 17.184.070, including guarantees
and evidence of compliance with conditions, have been incorporated into the
approval of the project to ensure development of the property in accordance with the
General Plan, Municipal Code, and Canyon Hills Specific Plan Amendment No. 2.
The Planning Commission has considered the Project and finds that with the
attached conditions of approval, the Project complies with the purposes and
objectives of the General Plan, Municipal Code and Canyon Hills Specific Plan
Amendment No. 2.
SECTION 3. Based upon the evidence presented, the above findings, and the
attached conditions of approval, the Planning Commission hereby approves Design
Review 2012 -05 for the Living Smart Condominium Community (Parkside II).
PC February 5, 2013 Item No. 2
Page 11 of 33
PLANNING COMMISSION RESOLUTION NO. 2013 -_
PAGE 3 OF 4
SECTION 4. This Resolution shall take effect from and after the date of its
passage and adoption.
PASSED, APPROVED AND ADOPTED this 5th day of February 2013, by the
following vote; ,
ATTEST:
Richard J. MacHott
Acting Planning Manager
STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE )ss.
CITY OF LAKE ELSINORE )
Rick Morsch, Chairman
City of Lake Elsinore
PC February 5, 2013 Item No. 2
Page 12 of 33
PLANNING COMMISSION RESOLUTION NO. 2013 -_
PAGE 4OF4
I, Richard MacHott, Acting Planning Manager of the City
California, hereby certify that Resolution No. 2013 -_ as adopte d
Commission of the City of Lake Elsinore at a regular meeting held
February 2013, and that the same was adopted by the following vote:
AYES
NOES:
ABSENT:
ABSTAIN:
Richard J. MacHott
Acting Planning Manager
of Lake Elsinore,
by the Planning
on the 5th day of
PC February 5, 2013 Item No. 2
Page 13 of 33
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2012 -05 FOR
LIVING SMART PARKSIDE
GENERAL
1. The proposed project (Residential Design Review No. 2012 -05) consists of building
design and construction of 78 single - family detached residential condominium units and
related improvements, for a housing project located within Planning Area 36 of Canyon
Hills Specific Plan (Living Smart Parkside).
2. The applicant shall defend (with counsel acceptable to the City), indemnify, and hold
harmless the City, its Officials, Officers, Employees, and Agents from any claim, action,
or proceeding against the City, its Officials, Officers, Employees or Agents to attach, set
aside, void, or annul an approval of the City, its advisory agencies, appeal boards, or
legislative body concerning the project attached hereto.
PLANNING DIVISION
3. Within 30 days of project approval, the applicant shall sign and complete an
"Acknowledgment of Conditions" and shall return the executed original to the
Community Development Department for inclusion in the case records.
4. Design Review approval for Residential Design Review No. 2012 -05 will lapse and be
void unless a building permit is issued within two (2) years of the approval date. An
extension of time, up to one (1) year may be granted by the Community Development
Director prior to the expiration of the initial Design Review approval upon application by
the developer and payment of required fees one (1) month prior to expiration.
5. Conditions of Approval shall be reproduced on page one of building plans submitted to
the Building Division Plan Check. All Conditions of Approval shall be met prior to the
issuance of a Certificate of Occupancy and release of utilities.
6. All site improvements approved with this request shall be constructed as indicated on
the approved site plan and elevations. Revisions to approved site plans or building
elevations shall be subject to the review of the Community Development Director. All
plans submitted for Building Division Plan Check shall conform to the submitted plans
as modified by Conditions of Approval, or the Planning Commission /City Council
through subsequent action.
7. All exterior on -site lighting shall be shielded and directed on -site so as not to create
glare onto neighboring property and streets or allow illumination above the horizontal
plane of the fixture. All light fixtures shall match the architectural style of the building.
8. Applicant shall use roofing materials with Class "A" fire rating.
Planning Commission
February 5, 2013
PC February 5, 2013 Item No. 2
Page 14 of 33
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2012 -05 FOR
LIVING SMART PARKSIDE
9. The Planning Division shall approve the location of any construction trailers utilized
during construction. All construction trailers shall require a cash bond processed
through the Planning Division.
10. Materials and colors depicted on the plans and materials board shall be used unless
modified by the Community Development Director or designee.
11. Parking stalls shall be developed pursuant to the requirements of the Canyon Hills
Specific Plan.
12.All exposed slopes in excess of three feet (3') in height shall have a permanent irrigation
system and erosion control vegetation installed, approved by the Planning Division.
13.All mechanical and electrical equipment for the building shall be ground mounted. All
outdoor ground or wall mounted utility equipment shall be consolidated in a central
location and architecturally screened along with substantial landscaping, subject to the
approval of the Community Development Director or designee, prior to issuance of
building permit.
14. All front yards and side yards on corner lots shall be properly landscaped with automatic
(manual or electric) irrigation system to provide 100 percent landscape coverage using
a combination of drip and conventional irrigation methods. The final
landscaping /irrigation plan is to be reviewed and approved by the City's Landscape
Architect Consultant and the Community Development Director or designee. A
Landscape Plan check fee will be charged prior to final landscape approval based on
the Consultant's fee plus 40 percent.
• The applicant shall plant street trees, selected from the City's Street Tree List, at
a maximum of 30 feet apart and at least 24 -inch box in size.
• Planting within 15 feet of ingress /egress points shall be no higher than 36 inches.
• The landscape plan shall provide for ground cover, shrubs, and trees and meet
all requirements of the City's adopted Landscape Guidelines. Special attention to
the use of Xeriscape or drought resistant plantings with combination drip
irrigation system to be used to prevent excessive watering.
• All landscape improvements shall be bonded with a 100 percent Faithful
Performance Bond for materials and labor for two years from Certificate of
Occupancy.
• All landscaping and irrigation shall be installed within an affected portion of any
phase at the time a certificate of occupancy is requested for any building.
Planning Commission
February 5, 2013
PC February 5, 2013 Item No. 2
Page 15 of 33
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2012 -05 FOR
LIVING SMART PARKSIDE
• One of the proposed lots of the Model Home Complex shall be Xeriscaped and
signage provided identifying Xeriscape landscaping.
• The Final landscape plan shall be consistent with any approved site and /or plot
plan. ,
15.All exposed slopes in excess of three feet in height within the subject tract and within
private lots shall have a permanent irrigation system and erosion control vegetation
installed, as approved by the Planning Division, prior to issuance of certificate of
occupancy.
16.The applicant shall prepare a Wall and Fencing Plan for the area comprising of the
project area, in compliance with the fencing standards within the Zoning Code Section
17.44.130.D and the Canyon Hills Specific Plan, prior to issuance of any building permit,
and subject to the approval of the Community Development Director or designee.
17. Fences located in any front yard shall not exceed three feet in height with the exception
that wrought -iron fences may be five feet in height. Chain link fences shall be
prohibited.
18. Garages shall be constructed to provide a minimum of twenty feet by twenty feet (20' x
20) of interior clear space to accommodate two vehicles.
19.Applicant shall comply with the requirements of the Elsinore Valley Municipal Water
District (EVMWD). Proof shall be presented to the Chief Building Official prior to
issuance of building permits and final approval.
20. Prior to issuance of building permits, applicant shall provide assurance that all required
fees to the Lake Elsinore Unified School District have been paid.
21.Prior to issuance of building permits, applicant shall provide assurance that all
requirements of the Riverside County Fire Department have been met.
22. Provisions of the City's Noise Ordinance shall be satisfied during all site preparation and
construction activity. Site preparation activity and construction shall not commence
before 7:00 AM and shall cease at 5:00 PM, Monday through Friday or 8:OOam and
5:OOpm on Saturday. Construction activity shall not take place on Sunday, or any Legal
Holidays.
23. The applicant shall place a weatherproof 3' x 3' sign at the entrance to the project site
identifying the approved days and hours of construction activity and a statement that
complaints regarding the operation can be lodged with the City of Lake Elsinore Code
Enforcement Division (951) 674 -3124.
Planning Commission
February 5, 2013
PC February 5, 2013 Item No. 2
Page 16 of 33
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2012 -05 FOR
LIVING SMART PARKSIDE
24. Construction traffic shall be prohibited from the segment of Lost Road south of the
project site as a construction truck route.
25.The Home Owner's Association shall be established prior to the occupancy release of
the first dwelling unit. The Homeowner's Association shall maintain all project
improvements and facilities, including the private streets, landscaping, park facilities,
and drainage improvements.
26.The applicant shall participate in the City's Lighting and Landscape Maintenance
District.
ENGINEERING
27.Applicant shall comply with all conditions of approval of the underlying Parcel Map
34442 and Conditional Use Permit 2012 -02.
28.AII private drives shall meet with fire requirements with respect to road width, street
slope, turn around, all weather material, and curve radius in place at the time of City
Council approval. Provide written documentation of Fire Division approval.
29. Landscaping adjacent to Canyon Hills Road and Hillside Drive shall be placed so as not
to interfere with the sight distance of exiting vehicles.
30. On site storm run -off shall be detained unless otherwise provided for by the underlying
project map.
31. Slopes shall be planted to reduce erosion. Drainage along the slopes shall be
constructed to convey storm flows and nuisance irrigation flows to an established
drainage course.
32.Slopes exceeding thirty feet (30') shall have City Standard concrete drainage ditches
every thirty feet (30') vertical.
33. Primary circulation drive aisle (loop drives) width shall be a minimum thirty six feet (36')
clear. Parking shall not be allowed in any of the drive aisles except at designated
spaces and approved by Riverside County Fire Department.
34. Interior street grades shall not exceed nine percent (9 %) and on -site intersections
approach grades shall not exceed six percent (6 %).
35. Project shall maintain provisions to convey off -site water to the existing public storm
drain system.
36. Pay all fees required by the Development Agreement.
Planning Commission
February 5, 2013
PC February 5, 2013 Item No. 2
Page 17 of 33
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2012 -05 FOR
LIVING SMART PARKSIDE
37.All Public Works requirements shall be complied with as a condition of development as
specified in the Lake Elsinore Municipal Code (LEMC) prior to issuance of building
permit.
38. Pay all Capital Improvement and Plan Check fees (LEMC 16.34, Resolution 85 -26).
39. Submit a "Will Serve" letter to the City Engineering Division from the applicable water
agency stating that water and sewer arrangements have been made for this project.
Submit this letter prior to issuance of building permit.
40.Construct all public works improvements per approved street plans (LEMC 12.04).
Plans must be approved and signed by the City Engineer prior to Parcel map approval
(LEMC 16.34).
41. Pay all fees and meet requirements of encroachment permit issued by the Engineering
Division for construction of public works improvements (LEMC 12.08 and Resolution 83-
78).
42.All compaction reports, grade certifications, monument certifications (with tie notes
delineated on 8 12" x 11" Mylar) shall be submitted to the Engineering Division before
final inspection of public works improvements will be scheduled and approved.
43.The applicant shall install two (2) permanent bench marks to City of Lake Elsinore
Standards and at a location to be determined by City Engineer.
44.Applicant shall obtain all necessary off -site easements for off -site grading from the
adjacent property owners prior to final map approval.
45.Arrangements for relocation of utility company facilities (power poles, vaults, etc.) out of
the roadway or alley shall be the responsibility of the property owner or his agent.
46. Provide street lighting and show lighting improvements as part of street improvement
plans as required by the City Engineer unless otherwise provided.
47. Developer shall annex to the City's Street Lighting and Landscaping Maintenance
District.
48. Developer shall install blue reflective pavement markers in the street at all fire hydrant
locations.
49.Applicant shall submit a traffic control plan showing all traffic control devices for the tract
to be approved prior to final map approval. All traffic control devices shall be installed
Planning Commission
February 5, 2013
PC February 5, 2013 Item No. 2
Page 18 of 33
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2012 -05 FOR
LIVING SMART PARKSIDE
prior to final inspection of public improvements. This includes No Parking and Street
Sweeping Signs for streets within the tract.
50.AII utilities except electrical over 12 kv shall be placed underground, as approved by the
serving utility.
51.Apply and obtain a grading permit with appropriate security prior to building permit
issuance. A grading plan signed and stamped by a Calif. Registered Civil Engineer is
required. Developer shall execute and submit grading and erosion control agreement,
post grading security and pay permit fees as a condition of grading permit issuance
52. Provide soils, geology and seismic report including street design recommendations.
Provide final soils report showing compliance with recommendations or provide a letter
stamped by a licensed geologist or geotechnical engineer stating the project is outside
the zone.
53.A geologic study shall be performed on the site to identify any earthquake faults and /or
liquefaction zones present on -site unless provided by underlying subdivision map.
54. All grading shall be done under the supervision of a geotechnical engineer and he shall
certify all slopes steeper than 2 to 1 for stability and proper erosion control. All
manufactured slopes greater than 30 ft. in height shall be contoured.
55. Prior to commencement of grading operations, developer is to provide to the City with a
map of all proposed haul routes to be used for movement of export material. All such
routes shall be subject to the review and approval of the City Engineer. Haul route shall
be submitted prior to issuance of a grading permit. Hauling in excess of 5,000 cy shall
be approved by City Council. (LEMC 15.72.065)
56. Applicant to provide to the City a video record of the condition of all proposed public City
haul roads. In the event of damage to such roads, applicant shall pay full cost of
restoring public roads to the baseline condition. A bond may be required to ensure
payment of damages to the public right -of -way, subject to the approval of the City
Engineer.
57. Drainage easements shall be kept free of buildings and obstructions.
58. Drainage across property lines shall not exceed that which existed prior to grading.
Excess or concentrated drainage shall be contained on site or directed to an approved
drainage facility. Erosion of the ground in the area of discharge shall be prevented by
installation of non - erosive down drains or other devices.
Planning Commission
February 5, 2013
PC February 5, 2013 Item No. 2
Page 19 of 33
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2012 -05 FOR
LIVING SMART PARKSIDE
59. Submit Hydrology and Hydraulic Reports for review and approval by City Engineer prior
to approval of final map. Developer shall mitigate any flooding and /or erosion caused by
development of site and diversion of drainage.
60. Storm drain inlet facilities shall be appropriately marked using the City, of Lake Elsinore
authorized detail to prevent illegally dumping in the drain system.
61. Roof and yard drains shall not be allowed to connect directly through cuts in the street
curb. Roof drains shall drain through minimum 20 -feet of landscaped area prior to
entering into a closed drainage system in compliance with City of Lake Elsinore
Standard 330.
62. In accordance with the City's Franchise Agreement for waste disposal and recycling, the
applicant shall be required to contract with CR &R, Inc., for removal and disposal of all
waste material, debris, vegetation and other rubbish generated during cleaning,
demolition, clear and grubbing or all other phases of construction.
63. Underground water rights shall be dedicated to the City pursuant to the provisions of
Section 16.52.030 (LEMC), and consistent with the City's agreement with the Elsinore
Valley Municipal Water District.
64. All slopes and landscaping within public right -of -way shall be maintained by the property
owner or property owner's association or another maintenance entity approved by the
City Council.
65. All open space and slopes except for public parks and schools and flood control district
facilities, outside the public right -of -way shall be owned and maintained by property
owner or property owner's association.
66. Developer shall mitigate to prevent any flooding and /or erosion downstream caused by
development of the site and or diversion of drainage.
67.Any grading that affects "waters of the United States ", wetlands or jurisdictional
streambeds, shall require approval and necessary permits from respective Federal
and /or State agencies.
68.The developer shall provide a copy of an encroachment permit or any approval
documents from the Riverside County Flood Control District for encroaching, grading, or
discharging into County flood control facilities.
69.AII required soils, geology, hydrology and hydraulic, and seismic reports shall be
prepared by a Registered Civil Engineer.
STORM WATER MANAGEMENT / POLLUTANT PREVENTION
Planning Commission
February 5, 2013
PC February 5, 2013 Item No. 2
Page 20 of 33
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2012 -05 FOR
LIVING SMART PARKSIDE
70.The developer shall provide erosion control measures and best management practices
(BMP's) as part of their grading and improvement plans. The developer shall ensure
protection of storm water quality and meet the goals of the California Green Building
Standards Code and Supplement "A" in the Riverside County NPDES Drainage Area
Management Plan.
71. The developer shall provide BMP's that will reduce storm water pollutants from parking
areas and driveway aisles.
72. Education guidelines and Best Management Practices (BMP) shall be provide to
residents of the development in the use of herbicides, pesticides, fertilizers as well as
other environmental awareness education materials on good housekeeping practices
that contribute to protection of storm water quality and met the goals of the BMP in
Supplement "A" in the Riverside County NPDES Drainage Area Management Plan.
(Required for lot of one acre or more).
73. The developer shall prohibit the discharge of waste into the storm drain system or local
surface waters in accordance with City of Lake Elsinore ordinances for storm water
management and discharge control and with state and federal law. This includes non -
storm water discharges containing oil, grease, detergents, trash, or other waste
remains. Brochures of "Storm water Pollution, What You Should Know" describing
preventing measures are available at City Hall.
74. Both a Storm Water Pollution Prevention Plan (SWPPP) and a Water Quality
Management Plan (WQMP) for post construction are required for this project.
75.A preliminary WQMP shall be submitted to the City Engineering Division for review and
approval during the DESIGN phase of the project and incorporate low impact
development (LID) principals such as permeable pavement, storm water retention and
reuse.
76.A final WQMP shall be submitted to the City Engineering Division for review and
approval prior to issuance of ANY PERMIT for construction (grading or building).
77. Identified pollutants of concern must be treated prior to any non - stormwater discharge
leaving the site.
78. The WQMP shall demonstrate that discharge flow rates, velocities, duration and volume
for the post construction condition from a 2 year and 10 year 24 hour rainfall event will
not cause significant adverse impacts on downstream erosion and receiving waters, or
measures are implemented to mitigate significant adverse impacts to downstream
public facilities and water bodies. The WQMP shall provide measures to minimize the
impact from the pollutants of concern and hydrologic conditions of concern identified for
Planning Commission
February 5, 2013
PC February 5, 2013 Item No. 2
Page 21 of 33
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2012 -05 FOR
LIVING SMART PARKSIDE
the project. Where the pollutants of concern include pollutants that are listed as
causing or contributing to impairments of receiving waters, BMPs must be selected so
that the project does not cause or contribute to an exceedance of water quality
objectives. The WQMP shall provide information regarding design considerations, and
the long -term operation and maintenance requirements for BMPs requiring long -term
maintenance as well as the mechanism for funding the long -term operation and
maintenance of the BMP's.
79.The grading and /or improvement plan shall include a table listing each stormwater
facility, and the plan sheet where it appears.
80.The occupant or owner must maintain records of stormwater facility maintenance, and
submit to City Staff inspections of Stormwater BMPs. Where City Staff allow or require
self- certifications, the occupant or owner must certify Stormwater BMPs are properly
maintained and submit reports, prepared and certified by a P.E., to City staff upon their
request. Certification by the City Staff may be required.
81.DURING CONSTRUCTION, NPDES education guidelines and Best Management
Practices (BMPs) shall be posted to inform users of this development of environmental
awareness and good housekeeping practices that contribute to protection of storm
water quality and meet the goals of the BMPs in Supplement "A" of the Riverside
County NPDES Drainage Area Management Plan (Required for lots of one acre or more
or lots that are part of a larger common plan (ex. shopping center infill lot).
IMPROVEMENTS
82. Install a root barrier for the dripline of trees installed within 6 feet of the sidewalk.
83. Re -align angle of private driveway A at Hillside Drive to align with Canyon Rim Road.
84. Show secondary access on all plans.
85. Traffic Study required for impacts to Hillside Drive and Canyon Hills Road. Comply
with mitigation measures identified therein.
86. An Encroachment Permit shall be obtained prior to any work on City and /or State right -
of -way. The developer shall submit the permit application, required fees and
documents prior to issuance.
87. Sight distance into and out of the project location shall comply with CALTRANS
Standards.
88. The developer shall coordinate with Riverside Transit Authority for location and
installation of bus transit facilities.
Planning Commission
February 5, 2013
PC February 5, 2013 Item No. 2
Page 22 of 33
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2012 -05 FOR
LIVING SMART PARKSIDE
89. If existing improvements are to be modified, the existing improvement plans on file shall
be modified accordingly and approved by the City Engineer prior to issuance of building
permit.
90. 10 year storm runoff shall be contained within the curb and the 100 year storm runoff
shall be contained within the street right -of -way. When either of these criteria are
exceeded, drainage facilities shall be provided.
91. All drainage facilities in this project shall be constructed to Riverside County Flood
Control District Standards.
92. The grading and /or improvement plan shall include a table listing each stormwater
facility, and the plan sheet where it appears.
93. All compaction reports, grade certifications, monument certifications (with tie notes
delineated on 8 Y2' x 11" Mylar) shall be submitted to the Engineering Division before
final inspection of public works improvements will be scheduled and approved.
94. A drainage study shall be provided. The study shall identify the following: identify storm
water runoff from and upstream of the site; show existing and proposed off -site and
onsite drainage facilities; and include a capacity analysis verifying the adequacy of the
facilities. The drainage system shall be designed to ensure that runoff from a 10 -yr
storm of 6 hours or 24 hours duration under developed condition is equal or less than
the runoff under existing conditions of the same storm frequency. Both 6 hour and
24hour storm duration shall be analyzed to determine the detention basin capacities
necessary to accomplish the desired results.
95. All natural drainage traversing the site shall be conveyed through the site, or shall be
collected and conveyed by a method approved by the City Engineer. All off -site
drainage, if different from historic flow, shall be conveyed to a public facility, accepted
by adjacent property owners by a letter of drainage acceptance, or conveyed to a
drainage easement.
96. The site shall be planned and developed to keep surface water from entering buildings
(California Green Building Standards Code 4.106.3).
97. All Public Works requirements shall be complied with as a condition of development as
specified in the Lake Elsinore Municipal Code (LEMC) and Lake Elsinore Standard
Plans.
98. The developer shall pay all fees and meet requirements of an encroachment permit
issued by the Engineering Division for construction of onsite and /or off -site public works
improvements (LEMC12.08, Res.83 -78).
Planning Commission
February 5, 2013
PC February 5, 2013 Item No. 2
Page 23 of 33
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2012 -05 FOR
LIVING SMART PARKSIDE
99. All streets shall be constructed per Lake Elsinore City Standards. Any deviation from
City standards shall be approved by the City Engineer.
100. The developer shall implement mitigation measures identified in the Traffic Analysis.
101. The developer shall submit street improvement plans prepared by a Registered Civil
Engineer and the plans shall include curb and gutter, sidewalk, ac pavement, street
lighting, median, trail, and drainage improvements.
102. The developer shall provide signing and striping plans for the required improvements of
this project.
103. The terminus of Private Driveways A, B & C shall include sufficient turnarounds for
emergency vehicles.
PRIOR TO GRADING PERMIT
104. A grading plan signed and stamped by a California Registered Ciil Engineer shall be
submitted for City review and approval for all addition and /or movement of soil (grading)
on the site. The plan shall include separate sheets for erosion control, haul route and
traffic control. The grading submittal shall include all supporting documentation and be
prepared using City standard title block, standard drawings and design manual
(available at www.lake- elsinore.org).
105. No grading shall be performed without first having obtained a permit. A grading permit
does not include the construction of retaining walls or other structures.
106. Export and import sites located within the Lake Elsinore City limits must have an active
grading permit.
107. All grading plan contours shall extend to minimum of 50 feet beyond property lines to
indicate existing drainage pattern.
108. If the grading plan identifies alterations in the existing drainage patterns as they exit the
site, a Hydrology and Hydraulic Report for review and approval by City Engineer shall
be required prior to issuance of grading permits. All grading that modifies the existing
flow patterns and /or topography shall be approved by the City Engineer.
109. The developer shall apply for, obtain and submit to the City Engineering Division a letter
from Southern California Edison (SCE) indicating that the construction activity will not
interfere with existing SCE facilities (aka SCE NIL).
Planning Commission
February 5, 2013
PC February 5, 2013 Item No. 2
Page 24 of 33
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2012 -05 FOR
LIVING SMART PARKSIDE
110. The developer shall obtain all necessary off -site easements and /or permits for off -site
grading and /or drainage acceptance from the adjacent property owners.
111. A preconstruction meeting with the City Public Works Inspector (Engineering Division) is
required prior to commencement of ANY grading activity.
112. Developer shall provide the city with a copy of the Notice of Intent (NOI) and Waste
Discharge Identification (WDID) letter issued by the Regional Water Quality Control
Board for the National Pollutant Discharge Elimination System (NPDES) program.
113. A copy of the current SWPPP shall be kept at the project site and be available for
review upon request.
114. Approval of the project Water Quality Management Plan (WQMP) for post construction
shall be received prior to issuance of a grading permit.
115. Submit an approved environmental clearance document to the Engineering Division.
This approval shall identify and clear all proposed grading activity anticipated for this
project.
PRIOR TO ISSUANCE OF BUILDING PERMIT
116. All required public right -of -way dedications and easements shall be prepared by the
developer or his agent and shall be submitted to the Engineering Division for review and
approval prior to issuance of building permit.
117. The Parcel Map shall be recorded.
118. All street improvement plans, traffic signal plans, signing and striping plans shall be
completed and approved by the City Engineer per a Traffic Impact Analysis.
PRIOR TO OCCUPANCY
119. Following construction and prior to Certificate of Occupancy /Final sign off, submit a final
Stormwater Facility Operation and Maintenance Plan and formally transfer responsibility
for maintenance to the HOA, owner, or permanent occupant.
120. All signing and striping and traffic control devices for the required improvements of this
development shall be installed.
121. All public improvements shall be completed in accordance with the approved plans or
as condition of this development to the satisfaction of the City Engineer.
Planning Commission
February 5, 2013
PC February 5, 2013 Item No. 2
Page 25 of 33
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2012 -05 FOR
LIVING SMART PARKSIDE
122. All water and sewer improvements shall be completed in accordance with Water District
requirements.
123. Proof of acceptance of maintenance responsibility of slopes, open spaces, landscape
areas, and drainage facilities shall.be provided.
124. As -built plans shall be completed and signed by the City Engineer.
125. All improvement plans and recorded maps shall be digitized. The developer shall submit
tapes and /or discs which are compatible with City's ARC Info /GIS.
126. Final soil report showing compliance with recommendations, compaction reports, grade
certifications, monument certifications (with tie notes delineated on 8 '/2 x 11" mylar)
shall be submitted in .tif format on CD to the Engineering Division before final inspection
will be scheduled.
127. All required public right -of -way dedications, easements, dedications and vacations and
easement agreement(s) for ingress and egress through adjacent property(ies)shall be
recorded with a recorded copy provided to the City prior to final project approval.
128. Documentation of responsibility for slope maintenance along right -of -ways and open
spaces to be maintained by the HOA or other entitity shall be provided in a recordable
format and recorded prior to occupancy /final.
129. All signing and striping and traffic control devices onsite and on Hillside Drive shall be
installed.
130. The developer shall pay fee in -lieu of construction of future median improvements on
Hillside Drive. The fee shall be equal to current cost estimate for improvements
(including contingency) plus an additional 15% of the total construction cost estimate to
cover design and administrative costs. The cost estimate shall be approved by City
staff.
131. Water and sewer improvements shall be completed in accordance with Water District
Requirements.
132. In the event of damage to City roads from hauling or other construction related activity,
applicant shall pay full cost of restoring public roads to the baseline condition.
133. Prior to grading or building permit close -out and /or the issuance of a certificate of use or
a certificate of occupancy, developer shall:
a. Demonstrate that all structural BMPs have been constructed, installed and are
functioning in conformance with approved plans and specifications and the WQMP;
Planning Commission
February 5, 2013
PC February 5, 2013 Item No. 2
Page 26 of 33
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2012 -05 FOR
LIVING SMART PARKSIDE
b. Demonstrate that they are prepared to implement all non - structural BMPs included
in the conditions of approval or building /grading permit conditions;
c. Demonstrate that an adequate number of copies of the approved project specific
WQMP are available for the future owners /occupants; and
d. The developer shall provide all education guidelines for Water Quality Management
Practices to the tenants, operators and owners of the businesses of the
development, regarding the environmental awareness on good housekeeping
practices that contribute to protection of storm water quality and meet the goals of
the approved WQMP in the Riverside County NPDES Drainage Area Management
Plan. Contact the City NPDES Coordinator for handout/guideline information.
134. The property owner (aka Legally Responsible Party) shall execute and cause to be
recorded a "Covenant and Agreement' in the form provided by the City to inform future
property owners of the requirement to implement the approved final project- specific
WQMP.
135. Developer shall pay all outstanding applicable processing and development fees
including but not all inclusive: TUMF, MSHCP, TIF, Stephens Kangaroo Rat Habitat and
area drainage prior to occupancy /final approval.
136. As -built plans for all approved plan sets shall be submitted for review and approval by
the City. The developer /developer /owner is responsible for revising the original mylar
plans. Once the original mylars have been approved, the developer shall provide the
City with a CD /DVD of the "as built' plans in .tif format.
137. All final studies and reports shall be submitted in .tif format on a CD /DVD. Studies and
reports include, Soils, Seismic, Hydrology, Hydraulics, Grading, SWPPP, WQMP, etc.
138. Provide on compact disc GIS Shape files of all final maps and street and storm drain
plans. "ALL DATA MUST BE IN projected Coordinate System: NAD 83 State Plane
California Zone VI U.S. Fleet.
139. All private drives shall meet with fire requirements with respect to road width, street
slope and curve radius in place at the time of City Council approval.
140. Landscaping adjacent to Hillside Drive shall be placed so as not to interfere with the
sight distance of exiting vehicles.
141. On site storm run -off shall be detained unless otherwise provided for by the underlying
project map.
142. Slopes shall be planted to reduce erosion. Drainage along the slopes shall be
constructed to convey storm flows and nuisance irrigation flows to an established
drainage course.
Planning Commission
February 5, 2013
PC February 5, 2013 Item No. 2
Page 27 of 33
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2012 -05 FOR
LIVING SMART PARKSIDE
143. Slopes exceeding thirty feet (30') shall have drainage ditches every thirty feet (30')
vertical.
144. Primary circulation drive aisle (loop drives) width shall be a minimum twenty eight feet
(28') clear. Parking shall not be allowed in any of the drive aisles except at designated
spaces and approved by Riverside County Fire Department.
145. Interior street grades shall not exceed nine percent (9 %) and on -site intersections
approach grades shall not exceed six percent (6 %).
146. Project shall maintain provisions to convey off -site water to the existing public storm
drain system.
147. Pay all fees required by the Development Agreement.
148. Provide drainage plan including hydrology and hydraulic information.
149. All Public Works requirements shall be complied with as a condition of development as
specified in the Lake Elsinore Municipal Code (LEMC) prior to issuance of building
permit.
150. Pay all Capital Improvement and Plan Check fees (LEMC 16.34, Resolution 85 -26).
151. Submit a "Will Serve" letter to the City Engineering Division from the applicable water
agency stating that water and sewer arrangements have been made for this project.
Submit this letter prior to issuance of building permit.
152. Construct all public works improvements per approved street plans (LEMC 12.04).
Plans must be approved and signed by the City Engineer prior to final map approval
(LEMC 16.34).
153. Street improvement plans and specifications shall be prepared by a Calif. Registered
Civil Engineer. Improvements shall be designed and constructed to Riverside County
Road Department Standards, latest edition, and City Codes (LEMC 12.04 and 16.34).
154. Pay all fees and meet requirements of encroachment permit issued by the Engineering
Division for construction of public works improvements (LEMC 12.08 and Resolution 83-
78).
155. All compaction reports, grade certifications, monument certifications (with tie notes
delineated on 8 '' /2' x 11" Mylar) shall be submitted to the Engineering Division before
final inspection of public works improvements will be scheduled and approved.
Planning Commission
February 5, 2013
PC February 5, 2013 Item No. 2
Page 28 of 33
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2012 -05 FOR
LIVING SMART PARKSIDE
156. The applicant shall install two (2) permanent bench marks to Riverside County
Standards and at a location to be determined by City Engineer.
157. Applicant shall obtain all necessary off -site easements for off -site grading from the
adjacent property owners prior to final map approval.
158. Confirm existing easement for storm drain traversing the site from driveway "A" through
the site unless otherwise provided.
159. Arrangements for relocation of utility company facilities (power poles, vaults, etc.) out of
the roadway or alley shall be the responsibility of the property owner or his agent.
160. Provide street lighting and show lighting improvements as part of street improvement
plans as required by the City Engineer unless otherwise provided.
161. Developer shall annex to the City's Street Lighting and Landscaping Maintenance
District.
162. Developer shall install blue reflective pavement markers in the street at all fire hydrant
locations.
163. Applicant shall submit a traffic control plan showing all traffic control devices for the tract
to be approved prior to final map approval. All traffic control devices shall be installed
prior to final inspection of public improvements. This includes No Parking and Street
Sweeping Signs for streets within the tract.
164. All utilities except electrical over 12 kv shall be placed underground, as approved by the
serving utility.
165. Apply and obtain a grading permit with appropriate security prior to building permit
issuance. A grading plan signed and stamped by a Calif. Registered Civil Engineer shall
be required if the grading exceeds 50 cubic yards or the existing flow pattern is
substantially modified as determined by the City Engineer. If the grading is less than 50
cubic yards and a grading plan is not required, a grading permit shall still be obtained so
that a cursory drainage and flow pattern inspection can be conducted before grading
begins.
166. Provide soils, geology and seismic report including street design recommendations.
Provide final soils report showing compliance with recommendations or provide a letter
stamped by a licensed geologist or geotechnical engineer stating the project is outside
the zone.
Planning Commission
February 5, 2013
PC February 5, 2013 Item No. 2
Page 29 of 33
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2012 -05 FOR
LIVING SMART PARKSIDE
167. An Alquis - Priolo study shall be performed on the site to identify any hidden earthquake
faults and /or liquefaction zones present on -site unless provided by underlying
subdivision map.
168. All grading shall be done under the supervision of a geotechnical engineer and he shall
certify all slopes steeper than 2 to 1 for stability and proper erosion control. All
manufactured slopes greater than 30 ft. in height shall be contoured.
169. Prior to commencement of grading operations, applicant to provide to the City with a
map of all proposed haul routes to be used for movement of export material. Such
routes shall be subject to the review and approval of the City Engineer.
170. Drainage easements shall be kept free of buildings and obstructions.
171. All natural drainage traversing site shall be conveyed through the site, or shall be
collected and conveyed by a method approved by the City Engineer.
172. Meet all requirements of LEMC 15.64 regarding flood hazard regulations.
173. Meet all requirements of LEMC 15.68 regarding floodplain management.
174. The applicant to provide FEMA elevation certificates as applicable prior to certificate of
occupancies.
175. Submit Hydrology and Hydraulic Reports for review and approval by City Engineer prior
to approval of final map. Developer shall mitigate any flooding and /or erosion caused
by development of site and diversion of drainage.
176. Storm drain inlet facilities shall be appropriately stenciled to prevent illegally dumping in
the drain system, the wording and stencil shall be approved by the City Engineer.
177. Roof and yard drains shall not be allowed to connect directly through cuts in the street
curb. Roof drains shall drain through minimum 20 -feet of landscaped area prior to
entering into a closed drainage system.
178. Applicant will be required to install BMP's using the best available technology to mitigate
any urban pollutants from entering the watershed.
179. The applicant shall process a storm water pollution prevention plan showing mitigation
of construction storm water run off.
180. Applicant shall provide the city with proof of his having filed a Notice of Intent with the
Regional Water Quality Control Board for the National Pollutant Discharge Elimination
System (NPDES) program with a storm water pollution prevention plan prior to issuance
Planning Commission
February 5, 2013
PC February 5, 2013 Item No. 2
Page 30 of 33
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2012 -05 FOR
LIVING SMART PARKSIDE
of grading permits. The applicant shall provide a WQMP for post construction which
describes BMP's that will be implemented for the development including maintenance
responsibilities.
181. Education guidelines and Best Management Practices (BMP) shall be provided to
residents of the development in the use of herbicides, pesticides, fertilizers as well as
other environmental awareness education materials on good housekeeping practices
that contribute to protection of stormwater quality and met the goals of the BMP in
Supplement "A" in the Riverside County NPDES Drainage Area Management Plan.
182. Applicant shall provide first flush BMP's using the best available technology that will
reduce storm water pollutants from parking areas and driveway aisles.
183. In accordance with the City's Franchise Agreement for waste disposal and recycling, the
applicant shall be required to contract with CR &R, Inc., for removal and disposal of all
waste material, debris, vegetation and other rubbish generated during cleaning,
demolition, clear and grubbing or all other phases of construction.
COMMUNITY SERVICES DEPARTMENT
184. Applicant shall pay applicable park fees unless documentation is provided otherwise.
185. No park credits shall be given for private park areas, open space, or recreation facilities
constructed within the development.
186. The developer shall utilize CR &R for all construction debris removal, hauling, and
recycling as per City ordinance.
187. The City landscape architect shall review and approve all landscaping plans.
188. The Home Owner's Association (HOA) shall maintain all landscaped areas including
landscaping fronting Canyon Hills Road and Hillside Drive, open space, water quality
basin and all interior plantings.
189. The Home Owner's Association (HOA) shall maintain all block walls and keep them free
of graffiti.
190. All interior roads, street signs, street markings, sidewalks, enhanced concrete to be
maintained by the Home Owner's Association (HOA).
191. Water quality basin outlet to meet all requirements of the Riverside County Flood
Control, Army Corps of Engineers and the City of Lake Elsinore.
DEPARTMENT OF ADMINISTRATIVE SERVICES
Planning Commission
February 5, 2013
PC February 5, 2013 Item No. 2
Page 31 of 33
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2012 -05 FOR
LIVING SMART PARKSIDE
192. Prior to the issuance of the first building permit, the applicant shall annex into
Community Facilities District 2003 -01 to offset the annual negative fiscal impacts of the
project on public safety operations and maintenance issues in the City.
193. Prior to the issuance of the first building permit, the applicant shall annex into Lighting
and Landscape Maintenance District No.1 to offset the annual negative fiscal impacts of
the project on public right -of -way landscaped areas to be maintained by the City and for
street lights in the public right -of -way for which the City will pay for electricity and a
maintenance fee to Southern California Edison.
RIVERSIDE COUNTY FIRE DEPARTMENT
194. The applicant shall comply with all requirements of the Riverside County Fire
Department. Fire protection measures shall be provided in accordance with Riverside
County ordinances and /or recognized fire protection standards.
195. Blue retro reflective pavement markers shall be mounted on private streets, public
streets and driveways to indicate location of fire hydrants. Prior to installation,
placement of markers must be approved by the Riverside County Fire Department.
196. Schedule A fire protection approved standard fire hydrants, (6 "x 4 "x 2 %') locate one at
each street intersection and space no more than 500 feet apart in any direction, with no
portion of any lot frontage more than 250 feet from hydrant. Minimum fire flow shall be
1000 GPM for 2 hour duration at 20 PSI. Shall include perimeter streets at each
intersection and spaced 660 feet apart.
197. The applicant or developer shall furnish one copy of the water system plans to the Fire
Department for review. Plans shall be signed by a registered civil engineer, containing a
Fire Department approval signature block, and shall conform to hydrant type, location,
spacing and minimum fire flow. Once plans are signed by local water company, the
originals shall be presented to the Fire Department for signature.
198. Environmental Constraint Sheet (ECS) map must be stamped by Riverside County
Surveyor with the following Note: The required water system, including fire hydrants,
shall be installed and accepted by the appropriate water agency prior to any
combustible building material placed on an individual lot.
199. Prior to the release of your installation, site prep and /or building permits from Building
and Safety. Written certification from the appropriate water district that the required fire
hydrant(s) are either existing or that financial arrangements have been made to provide
them.
Planning Commission
February 5, 2013
PC February 5, 2013 Item No. 2
Page 32 of 33
CONDITIONS OF APPROVAL FOR
RESIDENTIAL DESIGN REVIEW NO. 2012 -05 FOR
LIVING SMART PARKSIDE
200. Also a map or APN page showing the location of the fire hydrant and access to the
property.
201. Install Fire Sprinkler System per NFPA 13D 2010 Edition Plans must be submitted to
the Riverside County Fire Dept. for review, and approval prior to installation.
Planning Commission
February 5, 2013
PC February 5, 2013 Item No. 2
Page 33 of 33