REPORT TO CITY COUNCIL
TO: HONORABLE MAYOR
AND MEMBERS OF THE CITY COUNCIL
FROM: THOMAS P. EVANS
INTERIM CITY MANAGER
DATE: NOVEMBER 13, 2012
SUBJECT: NOTICE OF COMPLETION
MODIFICATIONS TO STATION 85, McVICKER CANYON
Recommendations
1. Accept the enclosure of the exercise room to Fire Station 85
2. Approve Contract Payment of $26,215 to ,Lakeshore Homes for the work to
enclose the workout room at Fire Station 85.
3. File the Notice of Completion with the County Recorder
4. Return $4,051.00 from this project to Fund 232 Fire Facility
5. Release all retention monies 35 days after the filing of the Notice of
Completion
Background
Fire Station 85 is located in McVicker Canyon and provides emergency services to the
northwest portions of Lake Elsinore, parts of Western Riverside County and provides
support services to areas north of the City. As a part of their Memorandum of
Understanding, firefighters are allowed 1.5 hours per day to maintain physical fitness.
Station 85 was constructed with an exercise room, however it was open to the elements
so in May of 2011, the City Council approved monies from the Fire Facility Fund (fund
232) and Miscellaneous Funds (fund 105) to enclose the exercise room.
Discussion
In July of 2012, City staff received a quote from Lakeshore Homes to enclose the
exercise room at Fire Station 85 in McVicker Canyon. The work included installation of
AGENDA ITEM NO. 7
Page I of 7
Page 2
Notice of Completion
November 13, 2012
windows, doors, drywall, insulation and modifications to the electrical and HVAC
systems. The cost of construction to install the changes to the room was $26,215. All
improvements were installed per City codes and Fire personnel requests.
Fiscal Impact
The Station 85 will be funded by the following accounts:
Revenue
105 Miscellaneous $15,000.00
232 Fire Facility Funds $30,000.00
Total $45,000.00
Equipment $14,734.00
Construction Costs
Lakeshore Homes $26,215.00
Total Cost $40,949.00
Budget Balance $ 4,051.00
Approved by: Ken Seumalo W'S
Director of Public Works
Approved by: James Riley
Director of Adm istrative Services
Approved by: Thomas Evans j��
Interim City Manag �
Attachments: Notice of completion
Project proposal
Page 2 of 7
RECORDING REQUESTED BY
AND WHEN RECORDED MAIL TO
Name City of Lake Elsinore
Street 130 S. Main Street
Address
cry a state Lake Elsinore CA 92530
M
S
U
PAGE
SIZE
DA
PCOR
NOCOR
SMF
MISC,
A
R
L
COPY
LONG
REFUND
NCHG
EXAM
IHISI NE
NOTICE OF COMPLETION
Notice is hereby given that:
1. The undersigned is owner or corporate officer of the owner of the interest or estate stated below in the property hereinafter described:
2. The full name of the owner is I City of Lake Elsinore
3. The full address of the owner s1 S Main Street
4. The nature of the interest or estate of the owner is in fee.
City of I aka Flsinora Fire Station 85 McVioker Canyon
((enter nranire, 11110ke'1"Foo' and Anson. fm aleaAre.'ou^tlaser r In, Comae( of Dwd.m: ca le"no,
5. The full names and full addresses of all persons, if any, who hold title with the undersigned as joint tenants or as tenants in common are
NAMES ADDRESSES
6. A work of improvement on the property hereinafter described was completed on ADrll 10 2012 . The work done was:
Installation of windows, doors, insulation, drywall, modification to HVAC and electrical systems.
T The name of the contractor, if any, for such work of improvement was lakachnra Hnmp¢, P n Rnx 1485, 1 aka1 aka Flcinnra
CA 92531. July 10 2012
(I( no connnoon for work of impnovemem as a wire. noon 'none') (Dole of Conlracl)
8. The property on which said work of improvement was completed is in the city of Lake Elsinore
County of RIVerSlde , State of California, and is described as follows: Enclose a fire station exercise room and Install
9. The street address of said property is MCVlcker Canyon Road
Of no solar Address eras bean 06'ann, O,A,Aed. lnsen'n.not
UF•IISiA
Slgnawre of owner of mroorare officer of owner
City Clerk Cit7 "6T"tbV€`0 s`lW5Ne
VERIFICATION
1, the undersigned, say: I am the Director of Public Works / City Engineer the declarant of the foregoing
('Resident d; 'Manager of; 'A warner Of "Owner of, etc.)
notice of completion; I have read said notice of completion and know the contents thereof; the same is true of my own knowledge. I
declare under penalty of perjury that the foregoing is true and correct.
Executed on November 13 20 12 at Lake Elsinor , California.
(Dore of s,nmu,A) (Cray wham signed)
(Personal signawre of me Individuaf wile is stream", Ina, the mnmms of he orrice of
comp,elion
no vuo)
Page 3 of 7
PROPOSAL
tractor Name: Jay Hattabaugh Broker Name:
tractor Off. Phone: 951 4713621
tractor Cell Phone: 951 4539649 Map Guide
Days to Complete: 5 Approx. Sq. Footage:
c Box Combination:
1. APPLIANCES Namriam Labor Only
1. Dishwasher
2. Disposal
3. Range
4.Vent HOOd
5. Oven
6. Other
Sub -Total APPLIANCES $
2.CARPENTRY
1. Cabinets, Hardware
4. FLOORING
1. Carpet Replace
2. Vinyl Replace
3. Sub0oor
4. Toilet Remove /Reset
5. Other
5. PAINT
1. Interior
DOUBLE DOORS NEEDS THRESHOLDS 5'
$
150.00
2. Counter Tops
3. Interior Doors,
Hardware, Trim
PAINT EXTERIOR COMPLETE
$
650.00
4. Windows, Screens
6 RETRO FIT WINDOWS BROWN VINYL
$
2,400.00
5. Exterior Doors, Hardware
NEW DOUBLE DOORS.
$
1,000.00
NEW ENTRY DOOR WITH METAL FRAME, USE EXISTING HDWR
$
500.00
6. Exterior Tom, Siding
Sheetrock, Mirrors
FRAME GABLE 30' LONG 15' TALL, FRAME SIDE WALLS 15'X 10'
$
500.00
7. Fence Repair /Replace
10'
8. Garage Doors
$
9. Other
Sub -Total PAINT
$
5,425.00
EXTERIOR SIDING & TRIM
$
2,100.00
Sub-Total CARPENTRY
$
6,150.00
3. ENVIRONMENTAL
Sub -Total ENVIRONMENTAL
$
4. FLOORING
1. Carpet Replace
2. Vinyl Replace
3. Sub0oor
4. Toilet Remove /Reset
5. Other
5. PAINT
1. Interior
34 0:, wth 112'.6 Lbs., rolmnd pad. 6.50 PER YD
A -fton ToughGoerd Memones yards
STAINED CONCRETE
each @ $ /ea.
SubJOtat FLOORING
INTERIOR PAINT
$
$
1,250.00
2. Interior cabinets
3. Exterior Trim Only
PAINT EXTERIOR COMPLETE
$
650.00
4. Exterior Total
ALL DRYWALL 1350 SQ FT CORBERBEAD 6 WINDOWS
$
3,025.00
5. Wallpaper,
Sheetrock, Mirrors
SKIM COAT APPROX 500+ SQ FT OF STUCCO
$
500.00
6. Other
$
Sub -Total PAINT
$
5,425.00
Sub -Total (FOR ITEMS 1 to s) $ 11,575.00
20045mpe of Repal,.xLS 412612012 Page 4 of 7
REO p: Property Address PROPOSAL
Sub -Total (FOR ITEMS t to 5)
$
11,575.00
6. STRUCTURAL
ELECTRICAL
1. Breaker, Wiring, EXTERIOR LIGHTS AND SWITCHING, INTERIOR PLUGS
$
1,550.00
2. Fixture Repair /Replace 4 RECESSED LIGHTS
$
500.00
3. Outlets, Switches,
Cover plate
4. Other
Sub -Total ELECTRICAL
$
2,050.00
HEAT & AIR
1. Condenser, Repair /Replace
2. Furnace, Repair /Replace
3. Thermostat, Replace HVAC INSTALL NEW RUNS FROM EXISTING UNIT INTO NEWLY
$
1,775.00
4. Other ENCLOSED ROOMS, INCLUDES ALL DUCT SIZING & DUCT
TESTING
S ub- I otal HEAT I AIR
PLUMBING
1. Water Healer
2. Interior
3. Exterior
4. Faucets
5. Sinks7Toilets
6. Showers
7. Tubs
8. Tile/Enclosure
9. Other
Sub -Total PLUMBING
$
ROOF
1. Repair Roof Leak
2. Replacement- Tear - off /Overlay(House squares X$ per square
(Garage Porch & extra over hangs) _ $ per square
3. Decking
4. Other
Sub -Total ROOF
$
STRUCTURE
1. Engineer Inspection BLOCK IN SIDE WHERE DOUBLE DOOR ENTRY AND DRAINS IN WALL
$
750.00
2. Grading
3. Gutters
4. Foundation Piers
5. Termite Repairs INSULATE ALL WALLS & CEILINGS 1350 SO FT CAULKISEAL ALL
$1,950
6. Other NEW FRAMING
Sub -Total STRUCTURE
$
2,700.00
7. MAINTENANCE
1. Final Sales Clean CONSTRUCTION CLEAN -UP, PRESSURE WASH
200
EQUIPMENT RENTAL 2 WEEKS SCISSOR LIFT FOR EXTERIOR &
1200
INTERIOR
Sub -Total MAINTENANCE
$
1,400.00
GRAND TOTAL (FOR ITEMS 1 -7)
$
19,500.00
Comments /Other Repairs
Contractor's Signature: I A Y 11 IT 11 A L QH Date: Approved Date: Initials:
3004 Scope of Repni1X1.5 413612013 Page 5 of 7
PROPOSAL
ractor Name: Jay Hattabaugh Broker Name:
:ractor O0. Phone: 951 4713621
:ractor Cell Phone: 951 4539649 Map Guide
Days to Complete: 5 Approx. Sq. Footage:
Box Combination:
1. APPLIANCES mare.Iate Labor 0 .1v
1. Dishwasher
2. Disposal
3. Range
4.Vent Hood
5. Oven
6. Other
Sub -Total APPLIANCES $
2.CARPENTRY
1. Cabinets, Hardware
2. Counter Tops
3. Interior Doors,
Hardware, Trim
4. Windows, Screens
5. Exterior Doors, Hardware
6. Exterior Trim, Siding
7. Fence Repair /Replace
8. Garage Doors
9. Other
3. ENVIRONMENTAL
DOUBLE DOORS NEEDS THRESHOLDS 5' $ 150.00
Sub -Total ENVIRONMENTAL
4. FLOORING
1. Carpet Replace as ox, with 112�. s ins., railroad pad. 6.50 PER YD
2. Vinyl Replace A,malmng ToughGuard Maimaios yards
3. SubOoor " "' STAINED CONCRETE AND RUBBER COVE BASE
4, Toilet Remove /Reset each @ $ /ea.
5. Other
Sub -Total FLOORING
5. PAINT
1. Interior
INTERIOR PAINT
2. Interior cabinets
3. Exterior Trim Only
PAINT EXTERIOR COMPLETE
4. Exterior Total
ALL DRYWALL 1350 SQ FT, CORBERBEAD 6 WINDOWS
5. Wallpaper,
Sheetrock, Mirrors
SKIM COAT APPROX 501 SQ FT OF STUCCO
6. Other
Sub -Total (FGR ITEMS 1 to 5)
$ 2,400.00
$ 2,700.00
$ 500.00
$ 1,825.00
$ 980.00
$ 2,100.00
$ 10,655.00
8
$ 1,920.00
$ 1,920.00
$ 1,250.00
$ 650.00
$ 3,025.00
$ 500.00
$
$ 5,425.00
$ 18,000.00
2004 Scope of Repair xlS 10/212012 Page 6 of 7
6 RETRO FIT WINDOWS, BROWN VINYL
RED #: property Address PROPOSAL
Sub -Total (FOR ITEMS 1 to 5)
$
18,000.00
6. STRUCTURAL
ELECTRICAL
1. Breaker, Wiring, EXTERIOR LIGHTS AND SWITCHING INTERIOR PLUGS
$
1,550.00
2. Fixture Repair /Replace 4 RECESSED LIGHTS
$
500.00
3. Outlets, Switches, - INSTALL 2 COBALT STYLE EXIT SIGNS ONE AT SINGLE
$
290.00
Cover plate EXIT ONE AT DOUBLE DOOR EXIT LEADING TO COURTYARD
4. Other
Sub -Total ELECTRICAL
$
2,340.00
HEAT & AIR
1. Condenser,Repair /Replace
2. Furnace, Repair /Replace
3. Thermostat, Replace HVAC INSTALL NEW RUNS FROM EXISTING UNIT INTO NEWLY
$
1,775.00
4. Other ENCLOSED ROOMS, INCLUDES ALL DUCT SIZING & DUCT
TESTING
Sub-lota HEA1 I AIR
PLUMBING
1. Water Heater
2. Interior
3. Exterior
4. Faucets
5. Sinks/Toilets
6. Showers
7. Tubs
8. Tile /Enclosure
9. Other
Sub -Total PLUMBING
$
ROOF
1. Repair Roof Leak
2. Replacement- Tear -off / Overlay (House squares X $ per square
(Garage, Porch & extra over hangs) ___ _ _ squares X $ Per square
3. Decking
4. Other
Sub -Total ROOF
$
STRUCTURE
1. Engineer Inspection BLOCK IN SIDE WHERE DOUBLE DOOR ENTRY AND DRAINS IN WALL
$
750.00
2. Grading
3. Gutters
4. Foundation Piers
5. Termite Repairs INSULATE ALL WALLS & CEILINGS 1350 SO FT, CAULK/SEAL ALL
$1,950
6. Other NEW FRAMING
Sub -Total STRUCTURE
$
2,700.00
7. MAINTENANCE
1. Final Sales Clean CONSTRUCTION CLEAN -UP PRESSURE WASH
200
EQUIPMENT RENTAL, 2 WEEKS SCISSOR LIFT FOR EXTERIOR &
1200
INTERIOR
Sub -Total MAINTENANCE
$
1,400.00
GRAND TOTAL (FOR ITEMS 1 -7)
$
26,215.00
Comments /Other Repairs
Contractors Signature: Jay I TS&.nuq r Dale: Approved Date: Initials:
2004 Soope or Repair.xLS 1OR12012 Page 7 of 7