HomeMy WebLinkAboutItem No.SA7TO:
FROM:
DATE:
- .SUBJECT:
CITY OF LAKE ELSINORE
REPORT TO THE REDEVELOPMENT AGENCY
REDEVELOPMENT AGENCY CHAIR AND BOARD
RON MOLENDYK,, EXECUTIVE,DIRECTOR
JULY 13; 1993.
LAW INTEREST LOANS - 126 N..MAIN STREET (PARK)
A Low Interest Loan application has been received from the owners'
of.the facility at 126 N.-Main Street:
The applicant has provided all information required to evaluate the
loan for recommendation.
DISCUSSION
The application is for improvements to the front facade and rear
parking area.
A lien on the property in the form of a Trust Deed is required to
secure the loan.
FISCAL IMPACT
None directly associated with the agenda report.
The Loan is requested in the amount' of $16,712.00' which falls
within the program guidelines.
RECOMMENDATION y
Approve the Low Interest Loan in the amount of $16,712. -00 for 126
N. Main Street.
PREPARED BY:
APPROVED FOR
AGENDA LISTING:
AGENDA ITEM NO.
PP.GI-, 4- r _ - _•
B.I.D. LOW INTEREST LOAN PROGRAM
OVERVIEW
r,
Low interest loans of up to $S�,000'are available for front exterior
building improvements and rear of building parking improvements for all
buildings in the Business Improvement District.
Loan approval will' be made within 3 to 5 weeks after application is
filed, providing loan packages are complete. The decision of the loan
committee as to approval or lack there of will be final. ,
The. loans are based on fixed simple interest at 2% under prime at time
of funding. Repayment periods will vary according to,.loan amount.
Payments will be due the fifteenth (15th) day of each month, provided
the first.payment,.will not be due earlier than 45 days following ,.final
release of funds. Any payment delinquent more than ten (10) days will
be subject to a penalty equal to 10% of the payment amount, or 25.00
whcihever is greater. Money will be released upon submission of
process billings, be paid directly to borrower or, if a contractor is
involved by way of jointly issued check.
APPLICATION
To file an application furnish the following:
1. Description of'the building improvements to be made, including cost
estimates and /or contrattor's.bid. Include. a sketch or.,drawing of
proposed improvements, color listing,-proposed materials (or sample if
available), a color photo of existing building and contractors proposal
of the work to be done if available.
2. In the case of partnerships or corporations, the last two years of
business financial.statements and /or income tax returns. If the last
year end financial statement is dated more than six months prior to the
application, a current interim financial statement should be furnished.
3. In the case of sole proprietorships,._ owner's current personal
financial statement and last,two year individual_ income tax returns.
4. Fully completed and signed application, including credit references
(attach list if necessary).
F
Z
7�
AGENDA ITEM NO.. 7
� Y
PROCESSING PROCEDURE . . ,
1._ All loans will be reviewed by a loan committee consisting of two
members of the Redevelopment agency board, two representatives of the
Downtown Business Association and the City's Administrative Services
Director.
2. The Committee will examine the financial statements, make the
necessary credit evaluation and review the project as to conformity
with the downtown area theme.
3. The decision of the Committee as to granting or denial of the loan
is final and not subject to appeal.
4. The decision-of the Committee will be immediately communicated to
the applicant.
5. If the loan is approved the applicant will be.required to execute:
(samples attached)
A. An agreement as to the improvements to be completed.
B. A promissory note.
C. A trust deed with the Redevelopment Agency as trustee. If the
borrower is a renter an attempt should be made to get the owner
to execute a trust deed: However, the inability of applicant to
obtain a trust deed will not in and of itself be cause for
denial, subject to the Committee's determination of applicant's
financial capability as related to the requested loan.
r�
r
AGENDA ITEM NO.
�'
r '
i
LAKE ELSINORE REDEVELOPMENT AGENCY
LOW INTEREST LOAN APPLICATION
The undersigned does hereby apply for a Low Interest Loan from the
Redevelopment Agency of the City of Lake Elsinore, and does hereby agree to
make the following improvements as a condition of approval for the Low Interest
Loan:
I. N S W SToRe FizoNT
2. FA&04c mime ✓es
3. ROOF PAAAP &T
4. _ 51611 *XTC-pjv , PAwT106
The property to which said improvements are to be made is located at:
N. MAIN STA06T Lake Elsinore, California and is
described as Assessors Parcel No. 3-73 - 0-10 - 0/9,
The title is held in the name(s) of:
U00N S. PAAK.
So VOUN& P'Alek-
There is outstanding indebtedness of $ _(o0,M orb secured by mortgage(s)
against said property held by:
First . CJlLSHIRE SrAyr6 BvWK
Second 7y /A
This agreement is made in conjunction with the execution of a secured /unsecured
loan in the amount of 5ejl���,Z,,- The above listed improvements will be
made in accordance with a� exT- isting codes and ordinances of the City of Lake
Elsinore and necessary permits for construction will be acquired. All work
will be completed within one hundred and twenty (120) days of execution of this
agreement.
s- ;14 -73
Date
(REV 5/90)
WATMwanowliGMAI 1��
Applicant
x -.
;x
E
ACS'• "'A ITEMI NO.
_L n`
Park/ Miklich Associates
Architecture
27447 Enterprise Circle West
Temecula. California 92590
Tel. 714'676 ' 7000
Fax. 714.676 8527
June 4, 1993
Proposal No. PM93 -08
Jenny's Clothing
126 N.Main Street
Lake Elsinore, CA 92330
RE: Construction Cost Estimate of Front Facade. and. Rear Parking Area
Improvement.
Dear Mr. Park:
The following is a Construction Cost Estimate of the proposed improvement of the
above mentioned property. This Cost Estimate provides and includes the necessary
labor, material, tools and goods to perform and complete, the job in a professional
manner.
1. Aluminum Storefront
Remove existing wooden store facade and windows. Replace with new
black anodized alumunum storefront with 3/8" clear plate glass and a
new 3'xT door. $4,320.00
2. Fabric Awnings
Remove existing wooden canopy. Install new fabric awnings over the
two windows of the second floor and over the new storefront of the first
floor. $4,080.00
3. Exterior Plaster
Apply 1 coat of exterior plaster with bonding agent. Color- coat to
match existing side elevation finish.
$1,162.00
4. Interior Drywall
Removal of the damaged drywall along the storefront. Install new
5/8 "gypsum board. All drywall to be hung, taped, and textured ready to
paint. All wall patching needed during the course of construction will
be completed. $300.00
AGENDA ITEMINNO. - T
x
April 7, 1993
Jenny's Clothing
Page 2
S. Roof
Remove existing layers of roofing. Apply 3 layers of 15# of asphalt felt,
hot mopped. Install 24 GA metal cap over the parapet.
$2,880.00
6. Sign
Install a new sign (Jenny's Clothing) of approximately 12 "A72" in overall
dimension over the facade of the building. Sign to be made of
fluorescent neon tube lights with color and design selected by the owner
and approved by the City of Lake Elsinore.
$540.00
7. Fence
Install new 6' high chain link fence and gate to enclose the rear parking
area. $930.00
8. Trash Enclosure
9'x7'x6'high concrete block trash enclosure with single steel gate
$2,000.00
9. Clean -up
"All areas to be left cleaned and free of the debris.
$500.00
TOTAL ESTIMATE $16,712.00
Very truly yours,
PARK / MIKLICH ASSOCIATES
Joon S. Park, AIA
Principal Architect
AGtPOA 1Tr:M NO.
PAGE GOp `-
NEW 24 GA METAL
PARAPET CAPPING
_COLOR COAT EXISTING
FACADE
NEW FABRIC AWNINGS
NEW NEON SIGN
IME,",1,,,,%m„
In ..../ /A... IBA
FRONT ELEVATION
126 N. MAIN STREET LAKE Ili, �II�II IIIi''ii Iiliiil II'� {►liilli�''�j�; ; ' (l�ilili ±iili ��',.
,.
Park/ Miklioh
Assoolates
7L77...�
AGENDA ITEM NO. 7 7