HomeMy WebLinkAboutItem No.SA1ASPECIAL JOINT CITY COUNCIL /REDEVELOPMENT;AGENCY MEETING
CITY OF LAKE ELSINORE
31315 CEANEY'STREET
LAKE ELSINORE, CALIFORNIA
TRIIRSDAY, JUNE 3, 1993
fti #AAA#!## AAA !#R #AAAA#fA••AttiAAAtttAAlllf lffAAAtfAAAtt #RA!!R # #•
The Joint Study Session was called to order at 3:04 p.m. by Mayor
Washburn:
PLEDGE OF ALLEGIANCE
The Pledge of Allegiance was led by Mayor Washburn
F%3ii •� �
PRESENT: COUNCILMEMBERS: ALONGI, CHERVENY, DOMINGUEZ, WINKLER,
WASHBURN
ABSENT:
NONE
Also present were: City Manager Molendyk, Administrative Services
Director Boone, City Treasurer Pape and City Clerk Kasad.
BUSINESS ITEMS
City Manager Molendyk indicated that the first item on the agenda
was the lake and then an overview of the budget_ He recommended
that an overview of the budget be provided today and.then return
for an additional workshop to answer any questions after the
Council has had an opportunity to study the budget.
1. Lake /Administration.
City Manager Molendyk noted that the lake is full and a great
summer was anticipated, however now there is concern with the
major algae bloom. He indicated that it had not yet impacted
the number of visitors to the Lake, however that might be
anticipated. He further indicated that the algae problem was
starting to be noticed for approximately the last two weeks
and over the weekend became emerald green. He reminded the
Council that the State still.has jurisdiction over the lake,
however they currently feel they have no. responsibility for
treating the water. He noted that Lake Perris uses copper
sulfate and the same consideration would be requested for Lake
Elsinore. He indicated that he understood that the Councilts
hopes would be to-try and do something.
Manager of Special Projects Watenpaugh. indicated that for
approximately the last week and a half .to two weeks he had
been talking with a variety _ of - different people from state
parks to water resources and also to Mr. Bollington from Bac-
Terra. He further indicated that he had ,put together prior
test results and there appears to be two options; only one in
terms..of an option that would even be acceptable or even be
AGENDA ITEM NO..�1��
PAVE 1 - O` `--_
PAGE TWO - JOINT STUDY SESSION NINUTEB - JUNE 3# 1993
considered acceptable by the Council would be that Lake Perris
does get treated with copper sulfate; however they do not
treat the entire lake at one time, they treat a small area and
they don't go to the shores, they have a mixture. Their
biologist that does the mixture gave me some estimates and
some costs. He explained that in order to do this type of
application there is a detailed process to go through with
Fish and Game because copper sulfate tends to neuter or do
away with all vegetation and eventually could kill fish, but
it will make the lake clean and pretty. This would have to be
done almost on a monthly basis, at an estimate of about
$180,000 year and that in essence would eliminate any fishing
in the lake and it would be an ongoing expense, it wouldn't be
a once a year charge. Bac- Terra, was used for a test project
around the perimeter of the lake and a small section of the
state park where they sprayed to get rid of the odor and it
did work, and it was non - harmful to marine life and plant
life. He noted that it could be put it in the water, while
continuing to allow water skiing, fishing, swimming; and it
basically competes for the fungi, goes after the phosphates,
takes away the fungi from the algae, returns and absolves
oxygen to the water. It is therefore, good for the fish, good
for the plant life and also neutralizes the sulfates. He
indicated that it cleans up the lake and would take anywhere
from three to six weeks for it to take full effect. He
indicated that the effectiveness would continue as long as the
food chain lasts and there are phosphates in water to allow it
to continue to multiply. He explained that the next step
would be to stock the lake with fish and establish proper
ecosystems to balance the food chain. He further explained
that the annual maintenance dose might be one -tenth the amount
needed initially. He indicated that the cost for Bac -Terra
would be approximately $400,000 for the mass treatment, which
would be recommended because any other application would be
hit and miss. He commented that the Bac -Terra would be the
best choice of those options available with the one time mass
treatment followed by annual maintenance of about $30,000 to
40,000 a per year depending upon whether the ecosystem is
properly balanced.
Councilman Winkler inquired whether the figure presented was
just for this treatment or if it included stocking the lake
with fish. Mr. Watenpaugh clarified that the estimated cost
for the treatment was $400,000 and to stock the lake with fish
depending on size and volume of fish it could cost an
additional $100 to $400 per surface acre. He explained that
the costs could potentially range from $300,000 to over $1
million if stocking the lake is also contemplated.
Councilman Alongi asked if anyone had talked with Elsinore
Valley to see what kind of algae is present. Mr. Watenpaugh
indicated that he had spoken with Mr. Laughlin, General
Manager and they used Bac -Terra themselves in their treatment
plants and sewer lines to get rid of odor and break down the
solids and his comments were positive.
Mayor Washburn summarized the options for treatment as
presented by Mr. Watenpaugh being copper sulfate or Bac- Terra.
Mr. Watenpaugh confirmed that these are the two methods used
most often, however in smaller lakes a variety of other
A,3ENrV5 ITEM NO. ' 2'',,.
PAGE THREE - JOINT STUDY SESSION MINUTES - JUNE 3# 1993
approaches are being used. He noted "that the biggest problem
with Lake Elsinore is the lack of natural inflow, outflow and
circulation. Mayor Washburn commented that.with either short
term or long term solutions there will be some level of
constant maintenance required., He stressed the need for a
comprehensive maintenance plan.
Mr. Watenpaugh explained that the,.-experts say. that once the
outflow is finished it will be a matter of balancing the fish
population with the food.chain, which will eventually allow
the eco- system to balance.. He further explained that such of
the current algae problem is due to the heavy, rains which
brought surface.rua -offs with high levels of sulfates.
Mayor Pro Tim Dominguez question the stocking of fish and
whether the City was responsible for that cost. City Manager
Molendyk confirmed that the City will be responsible with the
assumption of the Lake and it`s "management. He explained that
in order, to balance the lake a different type of fish is
needed than would regularly be stocked..`
Mayor, Pro Tem Dominguez inquired whether there would be any
fish through the State system." Mr. Molendyk indicated that
there would be some through the. State, however if the City
goes through the State they ,then control everything that goes
into the lake. He further indicated that if the City goes
through a private company,. then :it can set its own fishing
license regulations and charge its own fees; while if the
State handles it,. they control. everything in, relation to
treatment and stocking of the Lake. Mayor Washburn noted that
the City : will ' end -up controlling the.fish based ,upon the
environmental studies based upon a'balanced lake.
Mayor Pro,.Tem Dominguez questioned the impact of the outflow
channel.on, this process. Mayor Washburn indicated that it
would, help f lush .the system: when there are rains. "City
Manager Molendyk clarified that the " only benefit will be when
the level reaches 1255 or 1256 allowing for some to run off,
however there will still be.no circulation below that level.
Mayor Pro Tem Dominguez inquired'whether,this algae was caused
by. the plant life "which is now under water'and deteriorating.
Mr. Molendyk indicated that" to date 'that has not been the
conclusion. He also indicated that there would be another
test in July by Black & Veatch to test the sediment content
and the reactions. He noted that to date:a' reason for this
extreme algae bloom has not been pinpointed. Mayor Pro Tem.
Dominguez noted that in his observation when the water did not
reach the plant life there was not the-problem of�'a green
lake; however when the water got, out. to the shoreline and
covered the plants, the lake started to get the algae.,,
Councilwoman Cherveny inquired whether previous comments about
stocking and licensing fees indicated that the „City- intended
to make the ,lake a private lake. City ,Manager .Molendyk
clarified that staff was looking at the ability to operate as
an !'enterprise” or-revenue generating program and the City
could impose a $2..00 fishing fee that would go to the City
rather than. Fish and. Game. Councilwoman Cherveny inquired
.whether this fee would be added onto the fishing license fees
F r
PAGE FOUR - JOINT STUDY SESSION MINUTES - JUNE 3#, 1993
charged by the State. Mr. Molendyk confirmed this was the
intent. Mayor Washburn stressed that this would only.be done
if the City did the stocking of the fish.
Councilwoman Cherveny-inquired whether this consideration of
treating the algae was an area of the City's responsibility,
in.that the water district would have the responsibility for
maintaining the quality of the water in the lake: Mr.
Molendyk explained that it was being brought to the Council
first, because generally the County or State'agencies would
say they don't have the-money, or won't do anything. He noted
that another agency indicated that the water is more
nutritious for irrigation as it is, however they have no
responsibility for the body of water.for recreation.
Councilwoman Cherveny inquired whether the City has
authorization via the contract to tamper with the quality of
the water. City Manager Molendyk indicated that as a first
step the City has not been told by the State that they will
not allow the City to do anything. The next step is to find
out how far-the Council wants to go and that is primarily a
financial question. Manager of Special Projects Watenpaugh
indicated that he had reviewed the operation agreement and the
Water District has an obligation to ensure that any water they
import into" the lake meets body contact standards. He
clarified that the water in the lake currently is acceptable
for body contact, it is not contaminated and the agreement
does not stipulate they are responsible.to filter the green
out so that it will be recreationally appealing. Councilwoman
Cherveny inquired whether there was anything to preclude the
City from filtering it out._ Mr. Watenpaugh indicated there
was not. . ._ .
Councilwoman Cherveny inquired whether they would say the City
could not put copper sulfate in and kill everything. Mayor
Washburn indicated that the City is not supposed to degrade
the water, however Lake Mathews and other lakes do it all of
the time and it doesn't kill all of the fish. Councilwoman
Cherveny further inquired whether the Water District can keep
the City from using copper sulfate. Mr. Watenpaugh indicated
that it would require Fish and Game approval because they
still control the quality at present. He noted that Bac -Terra
has been approved for this.purpose. I
City Manager Molendyk clarified that the City would coordinate
with the Water District and obtain necessary permits from the
State. He indicated that potentially they could be asked to
participate financially or in the maintenance process. He
stressed the dramatic increase of algae over the last weekend,
which was the reason for bringing it before the Council at a
Special Meeting.
Mayor Washburn questioned the use of copper sulfate, how
quickly, it would work and how long it would last. Mr.
Watenpaugh indicated that through his discussions he was told
it would work quickly, however it would take three to" six
weeks to receive approval to proceed. Mayor Washburn inquired
whether this would be prior to the transfer or after the
transfer. Mr. Watenpaugh.indicated that it would not matter,
because a permit would' still be-required. He stressed that
Bac -Terra had already been approved based on the test project
last year.
AC?7N-)A ITEM NO.
PAGE FIVE - JOINT STUDY SESSION MINUTES - JUNE 30 1993
City Manager Molendyk indicated that Lake Perris is treated
with copper sulfate and it is applied through the department
of water resources at no charge. He questioned why the State
would not approve the same treatment for Lake Elsinore, even
with its down side. He questioned the estimated cost for the
Bac- Terra.
Mayor Washburn noted the impact of the current situation on
tourism and indicated that he has already heard of boaters
reconsidering use of the lake. Mr. Watenpaugh advised that
last weekend, Memorial Day, there were 500 boats on the lake
Saturday, 650 boats on Sunday and 300 on Monday, however the
condition did change drastically between Friday and Monday.
Mayor Washburn commented that action is definitely needed, but
expressed caution with the $400,000 figure. He stressed the
need to evaluate the alternatives and proceed.
Manager of Special Projects Watenpaugh -clarified that while
copper sulfate is used in Lake Perris and - other,.it is
generally used on only portions of the-lakes. Mayor Washburn
inquired whether this would be adequate to get by. Mr.
Watenpaugh indicated that it would not change the color of the
Lake and while the areas treated would be clear for a while it
would be subject to repeated inundation.
John Bollington indicated -that he has spoken with the
Department of Water Resources previously and the reason they
have not supported treatment of this lake is that it is not
filled with potable /useable water like Lake Mathews or Lake
Perris. Mayor Washburn inquired whether this was as drinking
water and irrigation water. Mr. Bollington confirmed.
Councilwoman Cherveny indicated that in talking to the Water
District Boardmembers, there was a comment that they were
taking a sample. Mayor Washburn indicated that this has been
monitored for quite a while. Councilwoman Cherveny indicated
that a sample was taken either yesterday or today to determine
the type of algae. She inquired whether it would eventually
die out naturally or if it was permanent.
Mayor Washburn questioned the scenario the algae will follow.
Mr. Watenpaugh indicated that it.would continue to replenish
itself. Mr: Bollington indicated that algae is like any other
plant life, it' needs nitrogen and phosphorus. As long as
there is a presence of nitrogen and phosphorus in the water
source, the possibility of recurrence of algae is going to
exist. The type of algae . that has been seen here, although he
did not know the exact type, appears to be a single cell
algae; single cell algae needs frequent water treatment. He
expressed confidence with the ability to correct this
particular problem. He indicated that generally this kind of
algae growth is caused by a tremendous amount of nutrients
available in the water. It is from nutrient overload and the
only way to rid that situation is to get rid of the nutrients,
which must be eaten by some microorganisms in the present and
later augmented for the fish and other life to survive.
He stressed that based on the volumes that are present and the
type of algae that is there he would say that the nutrient
overload is extraordinary.
PAGE SIX - JOINT STUDY SESSION MINUTES - JUNE 3, 1993
Mayor Washburn questioned the point of source and whether
there is any chance that it is coming from upstream origins.
He noted the treatment plant upstream and questioned whether
they discharge into this flow. Mr. Watenpaugh advised that
the indication of the biologist is that there is a point
source that spreads surface runoff and part of the blame is
the fact that we still do have a large amount of septic
systems and through heavy rains and saturation that is a
portion and part of it is the surface runoff from the streets
and the automobile fluids.
Mayor Washburn questioned the one time application, Mr.
Bollington indicated that it would take four to six weeks
depending on how much labor is brought in, however that time
could be shortened if time is a factor. Mayor Washburn
inquired how long the treatment would last. Mr. Bollington
explained that what will happen as it takes care of the
nutrients and out competes the algae for phosphorus, it will
then drop its nutrients in the bottom of the lake.
Microorganisms take effect once the bacteria follows the food
into the bottom of the lake, which will be of residual value
and will continue eating as long as there is.food. In those
areas where the water is clean, there is nothing left for them
to eat and the water will become clear. He further explained
that the reason they don't re -treat the same amount each time
is because there is residual value. The exact amount of any
re- treatment is really more of a condition of how many
solvents and oils are washing in to it.
Councilman Alongi inquired whether the water behind the levee
would also be treated or if it will just flow into it. Mr.
Bollington indicated that would depend on how the water feeds
and how quickly it could be expected to evaporate away. He
detailed the application and indicated that it would not
necessarily be carried to every area of the lake. Councilman
Alongi inquired how it would work itself behind the levee,
because it would not evaporate by the time the lake is
treated. He assumed that if the pipe was closed off under the
levee, then it would only be necessary to treat the lake
itself. He further questioned treatment of the inlet channel.
Mr. Watenpaugh indicated that some would most likely spread
back into it as the bacteria follows the fungi.
Mayor Washburn questioned the reason for the high cost
estimate. Mr. Bollington indicated that it was really, not
expensive, however a large quantity'is needed because of the
size of the lake. He noted that it will need a combination
of bacteria from the over.102 types; and in order to keep them
alive and protect their ability to digest this contamination
it takes a certain volume. He explained that do to less would
minimize the results.
Councilman Winkler questioned another .study which was
mentioned by Black 6 Veatch in July. City Manager Molendyk
,explained that this would be the final study and what they are
doing is to take water samples every month, and test them for
all of the minerals, nutrients, oxygen, etc.. They are doing
one more to try to come up with some kind of conclusion as to
what is causing the high algae content of the lake; such as a
chemical imbalance of some kind that is holding certain
PAGE SEVEN - JOINT STUDY SESSION MINUTES - JUNE 3v 1993
chemicals in. They are doing it now but will be contacting the
City in July.
Councilman Winkler questioned the impact of additional
information in July.' City Manager Molendyk commented that the
other question would be, if the community is to go through
this expense, it was mentioned that we would want to have the
correct amount of to help ecologically balance the lake.
Also if this is done and not stocked with a certain variety of
fish right afterward, are we also wasting money.
Mayor Washburn suggested that based on the boating statistics
to date, if there are 450 boats a week, with a one -time
surcharge on year passes, the cost could be recouped in three
months. He indicated that there might be a way to put that
into the maintenance operation costs if the boaters feel
improvement is occurring. He inquired what the scenario would
be if nothing is done. Mr. Bollington indicated that the
inflow of nutrients would be overloaded and a denser algae
growth would occur. As it becomes more dense life will not be
able to exist in the water because of the lack of oxygen.
With that odors" will start occurring from bacteria, from
sludge, and from dying fish.
Mayor Pro Tem Dominguez inquired whether the use of the lake
and motion from the boats would be of any assistance to the
process. Mr. Bollington indicated that they would want
agitation for the microorganisms to spread throughout the lake
as quickly as possible. Mr. Dominguez inquired whether the
motion alone could treat the situation. Mayor Washburn
indicated that the motion alone will not change the current
situation.
Councilwoman Cherveny inquired whether the algae will
eventually die out.. Mr. Bollington indicated that until the
nutrient overload is stopped the algae will continue.
Mayor Pro Tem Dominguez questioned the impact of the weather
on the algae. Mr. Bollington indicated that the heat will
speed up the growth process.
Councilman Winkler inquired how long it would take to start
following authorization. City Manager Molendyk inquired how
fast it could be done with the right labor force. Mr.
Bollington indicated that they treated a much smaller
situation and were able to "crash" the algae 'in five days, but
that is not known until the process begins and the impact is
evaluated.
Mayor Washburn inquired whether Mr. Bollington could guarantee
that it does work and it goes into the bottom layers of the
lake and continue to work. Mr. Bollington indicated that it
would continue to eat as long as nutrients exist and this
would continue into the lake bottom. Mayor Washburn further
inquired if the application is done, whether the maintenance
program would be to add more microbes every,few months. Mr.
Bollington indicated that he would recommend treating every
year before the hot season.
Councilwoman Cherveny inquired whether treating at this time
IPA
PAGE EIGHT - JOINT STUDY SESSION MINUTES - JUNE 3# 1993
would inhibit the ability of Black & Veatch to determine the
source with their test in July. Mayor Washburn indicated that
his understanding is that the testing is ongoing and they have
been proceeding for a number of months, and they are not
looking for the point source of the problem as much as
monitoring the chemicals and oxygen to establish a baseline to
monitor new water and assure.that it is not degrading the rest
of the water.
Councilman Alongi inquired if the ground was exposed for quite
a few years, would that build up ingredients that build up the
algae. In other words the lake has been low for quite a few
years and deposited with animal waste which is now under
water, would that contribute to the problem. Mr. Bollington
indicated that it certainly contributes to the nature of the
floor of the lake to be able to absorb nutrients. He
indicated that waste like that causes a. lot of sulfur buildup.
Councilwoman Cherveny requested clarification as to whether
portions of the lake would need to be closed in connection
with the treatment. Mr. Bollington indicated that it was not
necessary. He detailed the process for rebalancing the eco-
system.
Councilman Winkler inquired whether fish and game approval
would still be necessary to start. City Manager Molendyk
indicated that it would be necessary but had been done quickly
on last year's test project.
Mayor Pro Tem'Dominguez questioned the approval for use of
copper sulfate in Lake Perris. Mr. Molendyk indicated that
they have a blanket policy with the State which has already
been approved and they are not required to obtain annual
permits.. Mr. Dominguez inquired how long that process would
take. Mr. Molendyk indicated he could find that out.
MOVED BY WINKLER, SECONDED BY WASHBURN TO CONTINUE THIS ITEM TO
TUESDAY NIGHT AND DIRECT STAFF TO CONTACT FISH AND GAME AND OBTAIN
PARTIAL APPROVAL PENDING AUTHORIZATION.
City Manager Molendyk noted that the Superintendent from State
Parks was invited to attend this meeting but could not. He
suggested that someone from State Parks be invited to
Tuesday's meeting as well. Mayor Washburn concurred and
suggested that meetings occur between now and Tuesday.
City Manager Molendyk requested clarification from the City
Attorney that based on the financing of this project it would
be a legitimate expense for the money from the State. He
suggested that this also be reviewed prior to Tuesday.
Councilwoman Cherveny expressed concern with. spending the
money before it is received. •
Councilman Alongi inquired if the project is done now, where
the money would come from.
Councilman Winkler indicated that was the reason he wants to
talk about it more on Tuesday night after discussing the
budget more.
•-.y T ti IV Il. LCA-
PAGE NINE - JOINT STUDY SESSION MINUTES - JUNE 3# 1993
City Manager Molendyk clarified that he understood that staff
is looking at making sure that necessary approvals, will, be
given by Fish and Game on both programs. Council concurred
that would be needed to review both alternatives.
THE FOREGOING MOTION CARRIED BY UNANIMOUS VOTE.
2. 1993 -94 Fiscal Year Budaet.
City Manager Molendyk explained the'proposed format of this
workshop, noting that he would' go through the budget and
explain where he thinks the process is. He further explained
that all of the Council had indicated interest in specific
projects and he wanted to put those items on the table as
well. He indicated that this would be primarily the General
Fund Budget but there would be some information on the
Redevelopment Agency budget.
City Manager Molendyk indicated that he had just received a
notice of a hazardous waste spill from the Kentucky Fried
Chicken on Riverside Drive, with raw - sewage and a horrible
odor. People have complained of headaches and Captain Schmutz
is considering evacuation" approximately one square block
solely.because of the odor and the police department is now
assisting with that operation.,
Mayor Washburn inquired whether it was a septic system. Mr.
Molendyk indicated that was not known yet, but the fire
captain has units on scene.
city Manager Molendyk further indicated that they have now
closed Kansas and Illinois Streets and have evacuated people
temporarily until they figure out the problem.
City Manager Molendyk noted that for the past three years the
City has seen a reduction in revenues due to the recession,
water moratorium and State budget balancing. He further noted
that in the last 20 months, the City has lost approximately
$2.8 million. He commented that because of the Economic
Development Program, reduction in management staff positions
and contracting workout, the City has been able to maintain
service levels, but not at the desired professional level. 'He
stressed that the Council is currently establishing policies
for a community of 23,000, but in essence they are decisions
affecting a community of "100,000. He advised that the budget
as presented is` °balanced, noting if everything were rolled
over it would put the City $200,000 out, but because of one
time monies in the amount - of $263,000, it was possible to
balance.
Councilwoman Cherveny inquired whether this $263,000 was
excess: Mr. Molendyk indicated that it was excess pulled over
from the 1992 -93 budget to the 193 -94 budget.
City Manager Molendyk suggested Council discussion of
earmarking charities and community events they would want to
-plan on supporting. He indicated that the Council budget
includes money for community events including money for
community relations and community services programs. The
AGENID.4 ITEM NO
�I'I
PAGE TEN - JOINT STUDY SESSION MINUTES - JUNE 3# 1993
Planning Commission budget includes additional funds for
training new members, an adjustment from $50 per meeting to
$60 per meeting. The City.Attorney's budget remains nearly
the same as 1992 -93. The City Clerk's budget includes $26,000
for the scheduled 1994 election. The City Manager's budget
includes no changes, would suggest consideration of a public
relations person like the water district and other agencies
have. Also to be considered would be the potential for a full
time person for Personnel. The Administrative Services
Department requested an administrative secretary but that is
not included. He explained that currently the typing and
secretarial support for Administrative Services comes from the
City Manager's Office. The Police, Department budget, based on
interest from Council -started off allowing for one more black
and white 365-days a year, with five additional officers and
a cost of $618,000, however this budget presents the same
level of services as 1992 -93 with an. addition $100,000 for
overtime to schedule extra patrol. Also considered was the
suggestion of using private security as an alternative to
accommodate for the tight budget, however they would not have
the same capability to arrest as Sheriff deputies. The
intention is to recommend a sergeant,be brought on next year
for lake enforcement to start gearing up. Patrol costs for
the lake are anticipated to cost $1,000,000 plus operating
costs of the lake. The Fire Department budget is at the same
level of service for Station 10. The station at Machado and
Lincoln is designed and ready to build, but the biggest
problem is the $700,000 to staff the,new station. The fire
engine cost is $150,000 and will take about nine months to
order and receive; future revenue sources will need to be
identified for :this use. The Public Services budget, in the
Engineering Department, we have a skeleton of full -time staff,
supplemented with consultants, to give us the flexibility to
use consultants and contract employees. An additional part -
time persons was considered for that department, but that is
not part of the final recommendation. In the maintenance
division working foreman positions were requested,
one parks and one streets with some additional
responsibilities that we have in those areas. Future services
will require more new personnel because,we are looking at a
year from now we might have McVickar park as a new park, the
Tuscany Hills park is, new, and additional staff were added
this year. We have a small park, soccer field, going in by
Century Homes park and we will also be accepting,.this year,
the median on Grand Avenue, Lincoln and next year we assume
the beaches that will come with the lake. He noted that the
City is accepting new streets and there is need for street
maintenance personnel in the future as well as additional tree
trimming. The Community Development budget consists of two
major building and planning divisions that answer to the
Assistant City Manager; the Planning Division, with the amount
of work there are currently five employees in planning and a
lot of people feel the economy is going to turn around in
1995. We should also be looking at advanced and regional
planning. It is suggested that Building, and Code Enforcement,
needs four people that would accommodate the level of service
that we'd like to have and also give us seven day a week
coverage, however, based upon the budget process we're down to
half of what the officers needed and, ultimately, we would
agree with council that we need additional staff that could
Auth:iA i i is P; .... �. ._
PAO[ J'
PAGE ELEVEN - JOINT STUDY SESSION MINUTES - JUNE 3, 1993
'give us better coverage. The Community Services Department
budget this year included ,_a pilot program of $40,000
transferred from the police budget for the after school
program, we've had an interest to continue that program, and
it would cost $85,000. At this point, it is not allocated to
continue because of the dollars, if the Council wanted to
consider taking that money out of the overtime or some of the
one -time dollars, that we'll be reviewing with the Council
later, that is an option. Eleven part -time positions will be
administered by the community services department next year
for the boat launch facility on the lake and that's been
financed through the lake enterprise account. The Lake
Enterprise Account for 1993 -94 allows for part -time staff,
water quality application, and a master plan study.
City Manager Molendyk noted the need for additional revenue
streams in the future. He further noted that the stadium has
received Council approval of the design of construction of the
stadium to open in April, 1994. This budget does not. cover
operating costs for 1993 -94, in other words,.if.we.go forward
with the stadium there is going to be expenses for security,
built into that first three months of operation. That is not
reflected, at this time, as our consultants have told us they
feel they can bring a management consultant in to assist with
that. Future economists•have, indicated that the economy is
expected to start turning around in 1995, generally the city
sees increased revenue in the proceeding, year, which would be
1996 -1997. This means at least two more years of hard times.
Due to the economy, the status of the State budget in the next
several years and any emergency unforeseen costs, we would
•recommend that our current reserves be maintained. He
indicated that in 1994 -95 we will be looking for new revenue
from the third phase of the outlet center and the Elsinore
city center - Walmart. e and the casino ordinance should be
reviewed as it relates to revenue.
Mr. Molendyk indicated that the Redevelopment Agency, based on
the present obligations, funding, and tax increment
commitments, and the loss of revenue to the State, no capital
dollars would be available for the next five years. He
detailed the projects already approved in addition to the
Stadium. He also explained that it is necessary to allow the
tax increment to build up in order to meet any future bond
obligations after we've financed the stadium and we've
financed the projects that have.been approved the last year.
City Manager Molendyk commented on one time dollars in the
amount of $500,000 and noted efforts to support approved
Council programs with those funds.
Councilwoman Cherveny inquired whether the $500,000 was City
money or Redevelopment Agency money..: City. Manager Molendyk
indicated that this was City money, and clarified the ability
to balance the proposed budget at $9,000,000 general fund. He
noted that the additional positions requested by the
departments would require another $1,910,000. The department
projections for capital outlay for trucks, replacement of cars
and facilities, is $864,900. The $500,000 is from the Pardee
Assessment District and the settlement of the last three years
booking fees.
AGENDA ITEM NO. ' , C"•
PAGE TWELVE - JOINT STUDY SESSION MINUTES - JUNE 3, 1993
Mayor Washburn noted that without the Public Financing
Authority and the Marks Roos arrangement, the City would not
be getting the one -time money from Pardee.
City Manager Molendyk noted the staffing levels which were 69
City employees in 1990 -91 down to 55.5 employees in 1993 -94.
The population in 1990 -91 was 15,900, up to 23,000 in 1993 -94.
He stressed that the City has less employees and the pressure
of the growing community is beginning to be felt. He pointed
out that the Sheriff's Contract in 1986 was for 14,2000
contractual hours and is currently 36,000 hours or 16 deputies
and 4 target team members, a crime prevention officer, and
four community service officers. He further pointed out that
the administrative support to those 25 officers include the
Captain, 1 lieutenant, 4 sergeants, 1 evidence officer, a
secretary, and 7 dispatchers for a total of 46 positions.
Councilwoman Cherveny inquired if this was 46 positions in
addition to the 25 officers. City Manager Molendyk clarified
that it was 46 positions total.
Councilman Alongi inquired how many of the 25 positions are
actually in the street. Captain Daniel indicated that all of
those were on the street, although not all at one time.
Councilman Alongi questioned how many of the 25 are on the
street at any one time. Captain Daniell. indicated that it
varies depending on the shift, but basically there are eight
a day on the street.
Councilwoman Cherveny requested clarification as to whether
there were eight on per shift. Captain Daniel clarified that
there were not, but that did not include the community service
officers. Councilwoman Cherveny questioned the number of
shifts. Mayor Washburn indicated that there are three shifts.
City Manager Molendyk clarified that there are four cars.
Councilman Alongi inquired whether the eight per day would
include the sergeant.- Captain Daniel advised that it did not,
as those positions are supplemental to the contract hours.
City Manager Molendyk detailed the staffing costs, capital
outlay and historical general funds revenue sources.
Councilwoman Cherveny requested a breakdown of sources of
sales tax. Mr. Molendyk indicated that it was not in this
packet.
City Manager Molendyk presented the suggestions for the
$500,000, stressing that it is one -time money and it won't be
there next year. He noted the tendency to bring on a new
project and whether it be a new community center, boat launch,
historical building, or whatever, to fix it up within the
following year, but we have to worry about where you get the
money to maintain it.
Councilwoman Cherveny indicated she would like to be..able to
look the budget over and -be able to digest prior to any
additional detail.
Councilman Winkler commented that we have never designated
money for charity groups before, other than the CDBG funds.
City Manager Molendyk explained that because of the criteria
AGENDA, !TE-M NO. I ; a
PAGE. Oi=�,Z
PAGE THIRTEEN - JOINT STUDY 8E88ION MINUTES r JUNG, -3 #,1993,
for CDBG funds this year it. was suggested that money be set
aside in the general fund.
Councilwoman Cherveny inquired whether there was - somewhere in
the budget where we've allocated money for the parades and all
those little things that end up never being a budgeted item
but are. always contributed to., City ;Manager Molendyk
indicated that this was included . under the Community
Promotions in the Council budget in the,amount of $10,000:
Mayor Washburn noted . that when LEMA was set up it was not
meant to continue forever and advised that.recent discussions
have questioned when it will go away,' which. could be when
the - federal project is signed off. or whenever the outflow
channel is completed. The annual allocation and its
fluctuations were discussed for information. .
Councilwoman Cherveny inquired whether the $10,000. for
Community Promotions was adequate for the items addressed.
Administrative Services Director Boone indicated that it
remains virtually the same every year. -'
Councilman Alongi indicated that,he thought we were going to
come up with a list of those items to be' supported.
Councilwoman - Cherveny ,inquired ,whether this should :list
specifically what to support. Councilman Alongi suggested that
it should be done that way to make it easier and let the
organizations know what they are getting up front.
City Manager Molendyk indicated that the $12,000.is part -time
receptionist /clerical support to the Council.,. Councilwoman
Cherveny indicated that the position could be. deleted, and
inquired whether the Council could -live , without the position.
Councilman Alongi questioned the function of this position.
City'Clerk Kasad. clarified that she is'the receptionist and
handles phones for the Council, and provides backup on filing
and routine clerical items. Councilman Alongi inquired how it
was handled previously. City Manager Molendyk indicated the
position was created when Council discussed having regular
office hours and it was created because the Deputy City
Clerk position had been split between the City Clerk's Office
and'Building. City Clerk Kasad clarified that'the need would
depend on the number, of hours. Council might need clerical
support.. -
Councilman Alongi. inquired if, it would be possible to
establish a certain amount of money for each event regardless
of what happens., City Manager.Molendyk indicated that would
be fine if the Council so desires.
Councilwoman Cherveny inquired whether Winterfest and fourth
of July have separate budgets. City Manager Molendyk
indicated they are funded under. Community Services Department.
Administrative Services Director Boone detailed the
traditional resources for.capital projects.
Councilman Winkler inquired,what the library CIP fund is.
Mr. Boone indicated that it was approximately $115 per unit
A3E ":U,C STEB/, NO. _Lar�
FACE, J- i 0
PAGE POURTEEN - JOINT STUDY SESSION MINUTES -`JUNE 3, 1993
from the new development for future library facilities and the
current balance is about $175,000.
Councilwoman Cherveny questioned the total revenue. City
Manager Molendyk indicated that it was detailed on page 1'and
explained the total expendable funds.
Public Services Director Tecca detailed the proposed capital
projects .including the curb, gutter, sidewalk replacement
program; street improvements, Machado /Lincoln traffic signal,
and the Mission Trail /Corydon traffic signal.
Councilwoman Cherveny ,inquired what happened to the
Ortega /Grand Traffic Signal. Mr. Tecca indicated that was a
state highway and the City has requested a signal many times;
however the state does not .yet feel it is warranted. Mayor
Washburn indicated that he thought that this had 'been
previously budgeted. Mayor Pro Tem Dominguez indicated it was
taken out.
Mayor Pro Tem Dominguez inquired whether the County was ready
to go on the Mission Trail /Corydon traffic signal. Mr. Tecca
indicated that they are ready to proceed and the contract
should'be awarded by the end of June.
Public Services Director Tecca continued to detail the capital
projects .planned including the 'Decontamination Study for
Main /Sulphur; Miscellaneous Drainage" Improvements; and the
MPB Reconnaisance Survey to determine `ground water
contaminants.
Mayor Washburn inquired' if this 'suivey would help in
determining the cause 'of the problem with the lake.. Mr. Tecca
indicated that it should, however it was"important to remember
that the watershed area for Lake Elsinore is 750 square miles.
Councilwoman Cherveny inquired if this had been done last year
also. Mr. Tecca indicated it had not, but it had been-carried
over.
Mr. Tecca further detailed projects -such as the 'Senior Center
Improvements, and Yarborough Park Improvements.
Councilman Alongi questioned the retaining wall at the Senior
Center. City Manager Molendyk explained this request'viich
was proposed to-help prevent runoff. Councilman Alongi
questioned the ability to transfer any excess allocation back
to curbs and gutters. Mr. Tecca indicated it could not be
transferred as it is park.money and restricted to parks.
City Manager Molendyk commented on the lighting and
landscaping district, noting an attempt this year not to
increase the landscaping and lighting district charges at all
because of the economy, in spite of new responsibilities.
Councilwoman Cherveny questioned page 44 of the budget and how
much is allocated to each special event like fourth of July,
the car' show, etc.- City Manager Molendyk indicated that ', a
breakdown could be provided before the-next meeting.
Mayor Washburn questioned Page 61 and inquired what had been
worked'out within the Lake Enterprise•Account.
PAGE PIPTEEN - JOINT STUDY SESSION MINUTES - JUNE 3# 1993
City Manager Molendyk detailed the Redevelopment Agency
projects.
Council discussed scheduling of the next budget session. City
Manager Molendyk indicated that the additional information
would be provided prior to the next meeting and staff would
work on scheduling the next session.
Manager of Special Projects Watenpaugh indicated that the
proposed lake oriented activities are broken down under
professional services. He noted the master plan and what it
would contain. Councilman Alongi questioned the enforcement
costs and how many arrests have been made on the lake
requiring transportation to Riverside. Mr. Watenpaugh
indicated that it has averaged about 5 per weekend.
Councilman Alongi questioned the associated costs. Mr.
Watenpaugh clarified the control of the park and lake patrol
and anticipated costs. Discussion ensued regarding the State
reporting system and handling of arrests.
Councilwoman Cherveny questioned the funds allocated for boat
launch employees. Mr. Watenpaugh clarified it would be 11.5
part time positions to cover 7 days a week and detailed the
hours and cost associated. Mr. Watenpaugh further clarified
the impact of existing agreements.
MOVED BY CHERVENY, SECONDED BY WINKLER AND CARRIED BY
VOTE TO ADJOURN THE STUDY SESSION AT 5:10 P.M.
ATTEST:
VICKI KASAD, CITY CLERK
CITY OF LAKE ELSINORE
GARY M. WASHBURN, MAYOR
CITY OF LAKE ELSINORE
AGENDA ITEM NO. i h'
PACE 15 O= I L)