Loading...
HomeMy WebLinkAboutItem No. 36CITY OF LAKE ELSINORE REPORT TO THE CITY COUNCIL TO: Mayor and City Council FROM: Ron Molendyk, City Manager DATE: October 26, 1993 SUBJECT: Appropriation of Funds for Change Order Number 1 to San Jacinto River Channel Project BACKGROUND The Redevelopment Agency of the City of Lake Elsinore is re- constructing the Lakeshore Drive bridge over the San Jacinto River Channel. In order to build the bridge, the San Jacinto River Channel must be constructed to its ultimate width. A contract to construct the San Jacinto River Channel was awarded to American Contracting, Inc. on August 16, 1993, in the amount of $988,999.50. Ayers Development constructed a large storm drain in Lakeshore Drive during the summer of 1993 to carry storm waters from the Ayers Tract near Mill Street to the San Jacinto River Channel. The storm drain line opens into the side of the San Jacinto River Channel immediately south of the Lakeshore Drive bridge. The storm drain pipe concrete headwall structure, which protects the side of the Channel from erosion, was deferred and not constructed because the channel sides were not constructed. American Contracting is constructing the channel walls as part of their contract. Therefore, they should complete the storm drain line by constructing the headwall structure in the channel wall. Original Award $ 988,999.50 Change Order No. 1 29,500.00 Total Award $1,018,499,50 FISCAL IMPACT The cost of the headwall structure was carefully determined and negotiated with American Contracting, Inc. An agreement was reached at $29,500. These funds exist in the dedicated Storm Drain Fund established by storm drain deposits from developers. RECOMMENDATION Appropriate $29,500.00, from the Drainage Fund to the Lake Elsinore Redevelopment Agency, to cover an increase in the contract amount with American Contracting, in order to construct the headwall structure of the Ayers storm drain. Prepared By: Approved By Approved Fo: Agenda List: PAGE .L. OF