HomeMy WebLinkAboutItem No. 35TO: FROM: DATE: SUBJECT: CITY OF LAKE ELSINORE REPORT TO THE CITY COUNCIL Mayor and City Council Ron Molendyk, City Manager October 26, 1993 AWARD OF CONTRACT FOR DOWNTOWN WEST STREET AND STORM DRAIN IMPROVEMENTS - PHASE I The Council appropriated funds for the design and construction of street and drainage improvements during Fiscal Year 1992 -93. A portion of those funds were used to prepare Plans and Specifications for the construction of storm drain pipe, curb inlets, street paving and other appurtenant work. The following streets were designed under this project: 1. Scrivener St. - Sumner Ave. to Flint St. 2. Lewis St. - Sumner Ave. to Pottery St. 3. Silver St. - Sumner Ave. to Pottery St. 4. Campus Way - Heald Ave. to Pottery St. 5. Mohr St. - Heald Ave. to Pottery St. Although the streets will only be paved to a width of 32 feet, the future full -width improvements, which include curb, gutter, sidewalk and pedestrian ramps, were designed and shown on the plans. The plans can now be used by future property owners for constructing the improvements along their property frontage. In addition, a new storm drain will collect runoff water in the low area on Silver Street, Campus Way and Mohr Street, between Sumner Avenue and Pottery Street, and carry it to a temporary discharge point on Pottery Street near Davis Street. This storm drain is planned for future extension down Chaney Street to the Outlet Channel. On Monday, October 18, 1993, sealed bids were received for this project. J.E.G. Construction Company, Inc. of Pomona, California was the low bidder with a submittal of $292,134.17 for the street improvements and $84,876.00 for the storm drain. J.E.G. Construction Company, Inc. is a licensed contractor and has satisfied all the bid requirements. The bid results for the Storm Drain and all eight blocks of Street Improvements are as follows: J.E.G. Construction Co., Inc. $377,010.17 Kruger- McGrew Construction Co. 446,824.96 A.L. Chavez Enterprises, Inc. 521,000.00 Los Angeles Engineering, Inc. 542,643.57 Boral Resources, Inc. 552,246.30 The Engineer's estimate was $494,822.00. AGENDA ITEM dQ. O PAGE.�L i Mayor and City Council October 26, 1992 Page Two FISCAL IMPACT Council appropriated $300,000.00 for Downtown West Street Improvements and $100,000.00 for Miscellaneous Drainage Improvements during Fiscal Year 1993 -94, for a total of $400,000.00. In order to construct the project within the budget constraints, several of the streets must be deleted. Staff is recommending that $25,000.00 be transferred from the Drainage Fee Fund and that $50,000.00 of the $150,000.00 that was appropriated for the Lincoln Street and Machado Street traffic signal in the 1993/94 Capital Improvement Budget, also be transferred to the project. All eight blocks of the downtown streets can then be constructed at one time. 1. Accept the bid of $377,010.17 and award a contract to J.E.G. Construction Company, Inc. for the construction of the Storm Drain and all eight blocks of Street Improvements. 2. Authorize the Administrative Services Director to transfer $25,000.00 from the Drainage Fee fund and $50,000.00 from the 1993/94 CIP budget for the traffic signal at Lincoln Street and Machado Street to this project. PREPARED BY: APPROVED BY: APPROVED FOR LISTING BY: AGEr:DP. ITEM No' PAGE pr`