HomeMy WebLinkAboutItem No.22CITY OF LAKE ELSINORE
REPORT TO CITY COUNCIL
TO: HONORABLE MAYOR AND CITY COUNCIL
FROM: RON MOLENDYK, CITY MANAGER
DATE: APRIL 27, 1993
SUBJECT: HEARING OF PROTESTS TO NOTICES TO DESTROY WEEDS,
REMOVE RUBBISH, REFUSE AND DIRT
DISCUSSION
As set forth in Section 8.32.090 of the Lake Elsinore Municipal
Code, the City Council shall hear and consider all objections to
the proposed removal of weeds, rubbish, refuse, and dirt. The City
Council may allow or overrule any objections.
After hearing and considering all objections, the City Council
acquires jurisdiction to proceed and perform the work of removal.
Notices were sent to property owners that were subject to
abatement. These notices stipulated that properties shall be
abated by the owner prior to May 24, 1993, or the City would
undertake abatement.
RECOMMENDATION
It is recommended that the City Council direct the City Manager to
proceed with abatement of all lots not abated by the owners by May
24, 1993.
PREPARED BY:
APPROVED BY:
APPROVED FOR
AGENDA LISTING:
AGENDA I T Z,I,i ; „:1
PA"�
CITY OF LAKE ELSINORE
HID PROPOSAL FOR ABATEMENT
I have read and thoroughly understand the terms of the
contract and my bid for the removal of weeds for the City of
Lake Elsinore is as follows:
Abate weeds on lots, includes the cleaning of streets and
sidewalks.
Abate weeds on lots by discing
a) One (1) square foot to one (1) acre $ )c� So
b) Over one (1) acre (per acre) $ 1 y su
Abate weeds on lots by mowing
a) One (1) square foot to one (1) acre $ )H s0__
b) Over one (1) acre (per acre) $ t4 _
Abate weeds on lots by hand labor; bid to
include hauling material to the dump and all
equipment, labor, and tools.
a) One (1) square foot to 20,000 square pp
feet $
b) Over 20,001 square feet $
Parcel to be leveled; bid to include all 00
equipment, labor and tools. $ '5-0 —
(per hour, per man)
Abate rubbish and refuse on lots; bid to
include hauling material to the dump and 00
all equipment, labor, and tools. $ �(L
(per hour, per man)
Cost of living increase per year 1f %
Signature _y. Ea 4
Company S74;774 -TRRCT7J2 SEP -ViaS
Address P 6 .726A 52.7
.1, an,Ae, PA 92 -r
Telephone
CITY OF LAKE ELSINORE
BID PROPOSAL FOR ABATEMENT
I have read and thoroughly understand the terms of the
contract and my bid for the removal of weeds for the City of
Lake Elsinore is as follows:
Abate weeds on lots, includes the cleaning of streets and
sidewalks.
Abate weeds on lots by discing
a)
One
(1) square foot to
one (1) acre
$22.00
b)
Over
one (1) acre (per
acre)
$2.00
Abate
weeds
on lots by mowing
a)
One
(1) square foot to
one (1) acre
$22.00
b)
over
one (1) acre (per
acre)
$22.00
Abate weeds on lots by hand labor; bid to
include hauling material to the dump and all
equipment, labor, and tools.
a)
One
(1) square foot to 20,000
square
feet
$ 60.00
b)
Over
20,001 square feet
$ 100.00
Parcel to be leveled; bid to include all
equipment, labor and tools. $45.00
(per hour, per man)
Abate rubbish and refuse on lots; bid to
include hauling material to the dump and
all equipment, labor, and tools. $45.00
(per hour, per man)
Cost of living increase per year 5 %
Signatures
Address 19301 GREEN ACRES
PRPPTq rAT TLS 9 570
Telephone (909) 780 -3025
(909) 789 -3360 MOBILE 329 -3367
CITY OF LAKE ELSINORE
BID PROPOSAL FOR ABATEMENT
I have read and thoroughly understand the terms of the
contract and my bid for the removal of weeds for the City of
Lake Elsinore is as follows:
Abate weeds on lots, includes the cleaning of streets and
sidewalks.
Abate weeds on lots by discing
a) One (1) square foot to one (1) acre $
c-�
b) Over one (1) acre (per acre) $ gyp°
Abate weeds on lots by.mowing
a)
One (1) square foot to
one (1) acre
$ f
b)
Over one (1) acre (per
acre)
$ 411 �° O
Abate weeds on lots by hand labor; bid to
include hauling material to the dump and all
equipment, labor, and tools.
a) one (1) square foot to 20,000 square 3t P 59vreF�mT
feet $ �5 6D ini;vimuM ��!
b) Over, 20,001 square feet $
Parcel to be leveled; bid to include all $
equipment, labor and tools. (per hour, per man)
Abate rubbish and refuse on lots; bid to
include hauling material to the dump and S%
all equipment, labor, and tools.
(per hour, per man)
Cost of living increase per year
Company
Address -7-751 6
Telephone %0%— -,73� ���
—%