HomeMy WebLinkAboutItem No. 38CITY OF LAKE ELSINORE REPORT TO THE CITY COUNCIL TO: Mayor and City Council FROM:, Ron Molendyk, City Manager, DATE: March 23, 1993 SUBJECT: AWARD OF CONTRACT FOR FLINT STREET AT YARBOROUGH PARK AND MAIN STREET /POTTERY STREET INTERSECTION IMPROVEMEN BACKGROUND The development of Yarborough Park with additional park improvements over the past few years has resulted in increased utilization of the park area and its facilities. This increased utilization has identified the need for additional parking facilities and surface improvements to Flint Street adjacent to Yarborough Park. One phase of this project is the installation of surface improvements for Flint Street adjacent to the north side of Yarborough Park at the intersection with Poe Street. The improvements include asphalt paving, curb, gutter, sidewalk, concrete cross - gutter, striped parking spaces, and appurtenant grading and drainage improvements. Flooding at the intersection of Main Street and Pottery Street has resulted from storm runoff that sheet -flows from Pottery Street onto Main Street. Existing drainage facilities at the intersection do not collect the majority of the runoff because the existing surface improvements do not adequately direct the runoff to the existing curb inlets. This phase of the project includes the removal and reconstruction of the existing surface improvements at the intersection of Main Street and Pottery Street. The improvements include the installation of concrete cross - gutter and AC berm and the removal and reconstruction of curb, gutter, sidewalk and asphalt paving. SUMMARY On March 8, 1993, nine bids were received for this project. Moreno Asphalt and Seal coat Company was, the low bidder with a bid proposal for $49,155.07. Moreno Asphalt and Seal Coat Company has a Class C -12 (Grading and Paving) license. Approximately 35% of the work is for providing items involving the placement of concrete for which a Class C -8 license is required. Moreno Asphalt and Seal Coat Company did not list any subcontractor as performing any work per the bid schedule. The bid results for the four lowest bidders are as follows: Moreno Asphalt and Seal Coat Company $49,155.07 Eastland Construction, Inc. $55,476.00 Robert Edmondson, Inc. $56,258.50 Kruger McGrew Construction Company $59,568.95 The Engineers' estimate was $50,000.00. FISCAL IMPACT Funding for the Flint Street improvements will be provided from the 1992/93 Capital Improvement Budget. Adequate funds are available in the Capital Improvement Budget for Fiscal Year 1992/93 to finance the construction of the Main Street /pottery Street drainage improvements. Report to the City Council Page two RECOMMENDATION 1. Reject the low bid of $49,155.07 from Moreno Asphalt and Seal Coat Company for being non - responsive to the requirements of the contract documents. 2. Accept the bid of $55,476.00 and award contract to Eastland Construction, Inc. PREPARED BY: )0. P. David R. Kircher, Associate Civil Engineer APPROVED BY: APPROVE FOR LISTING BY: 1 0 _. o- _ .