HomeMy WebLinkAboutItem No. SA3CITY OF LAKE ELSINORE REPORT TO THE REDEVELOPMENT AGENCY TO: Redevelopment Agency FROM: Ron Molendyk, Executive Director DATE: June 8, 1993 SUBJECT: San Jacinto River Channel Construction The City of Lake Elsinore is re- constructing the Lakeshore Drive bridge over the San Jacinto River Channel. In order'to protect the new bridge from washout, which could result from a 100 year storm, the San Jacinto River Channel must be constructed between the bridge and the Lake Inlet Channel. DISCUSSION Construction of the San Jacinto River Channel Project was advertised in local and regional newspapers as required, and :15 bids were received. After correcting multiplication and addition errors for the six lowest bids, the lowest corrected bid was submitted by American Contracting, ,Inc. of Temecula. Tabulation of the 6 lowest-,bids are as follows: Submitted Bid Corrected Bid 1. Paul Hubbs Construction Co. $1,020.553.50 $1,020,553.50 2. American Contracting, Inc. 1.028,237.50 992,832.50 3. Roy E. Ladd, Inc. 1,099,146.00 1,099,146.00 4. Highgrade Engineering, Inc. 1,181,401:75 1,170,181.75 5. Kasler Corp. 1,220,889.00 1,221,757.00 6. Steve P. Rados, Inc. 1,275,615.00 1,275,615.00 The Engineers estimate for construction was $1,112,000. Upon reviewing the unit price bids, two problems were discovered with the bid submitted by American Contracting, Inc., 1. American Contracting appears to- have un- balanced their bid for Item No. 2 - Construction of Dike- and item No.3 - Removal of Dike. The level of construction effort for these two items of work should be about the same as reflected in the bids of the 14 other proposing contractors. 2. The unit price bid (for the 6 low bids analyzed) for Base Bid Item 11 and Alternate "B" Bid Item 5 varies from $6.50 /cy to $22.75/cy. Both Base Bid Item 11 and Alternate "B" Bid Item 5 are for "filter bedding." We were informed (after bidding) by several contractors that the low unit prices (for these items) by American Contracting ($6.50) and Kasler Corp. ($8.00) indicated that the "filter bedding" proposed by these two contractors was probably "sand" and not "No.3 Backing" as stated in the Special Provisions. Sand would be significantly less expensive than 11no.3 Backing." A letter was sent to Mr. Keith Candee, President of American Contracting, concerning the subject and the use of "No. 3 Backing." American Contracting responded on May 13. Their response, however, was not specific and did not answer our question. Another letter was sent to American Contracting, Inc. on June 2 notifying them that we intend to reject their apparent low bid and the basis for that decision. They were informed that they may appear at the Redevelopment Agency meeting for a hearing prior to award of the job to the second lowest bidder. AGENDA ITEM NO..a.� PAG'E—L OF� Report to the Redevelopment Agency June 8, 1993 :.Page 2 FISCAL IMPACT Funds for construction of.the San Jacinto River Channel have been appropriated by the Agency in the 1992/93 Budget. RECOMMENDATIONS 1. Reject the bid of American Contracting based upon "Disqualification of Bidders" provision, (Page 7) Item C "Proposals in which- any of the -unit prices and /or lump sum . prices obviously are unbalanced" of the Standard Specifications for.Public Works Construction. 2. Award a contract to the second low bidder: Paul Hubbs Construction Company in the amount of $1,020,553.50 with a fifteen percent DBE participation. PREPARED BY:G ran C. a a, Director of Public Services APPROVED BY: -P ogers, Assistant.Executive Director, RDA APPROVED FOR AGENDA LISTING R n Mol dyk, E ecutive Director, RDA AGENDA ITEM NO. ✓ PAG'E_xL OF 2L