Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Item No. 4
CITY OF LAI-E �LS - I 0KE � ` DREAM EXTREME. REPORT TO PLANNING COMMISSION TO: HONORABLE CHAIRMAN AND MEMBERS OF THE PLANNING COMMISSION FROM: BOB BRADY CITY MANAGER DATE: AUGUST 3, 2010 SUBJECT: RESIDENTIAL DESIGN REVIEW NO. 2010 -04, A REQUEST FOR BUILDING DESIGNS AND A MODEL HOME COMPLEX FOR A HOUSING PROJECT LOCATED WITHIN PLANNING AREAS 21A, 21B AND 24 OF CANYON HILLS SPECIFIC PLAN (CYPRESS). APPLICANT & OWNER: SONDRA NETZER, RICHMOND AMERICAN HOMES, 5171 CALIFORNIA, SUITE 120, IRVINE, CA 92617 Proiect Request The applicant requests building designs for single family detached residential units on one hundred and thirty one (131) lots in the Canyon Hills Specific Plan area, Tract 30493, including a model home complex and related improvements. The proposal will replace a portion of the existing "Weatherly and Alderbrook" developments previously developed by Pulte Homes, in an effort to meet current market conditions. Project Location The Canyon Hills Specific Plan area is located within the eastern boundaries of the City of Lake Elsinore and east of the 1 -15 Freeway (Exhibit W). The proposed "Cypress" development is defined. by the Specific Plan as Planning Areas 21A, 21 B and 24. PC August 3, 2010 Item No. 4 Page 1 of 82 RDR No. 2010 -04 — RICHMOND AMERICAN AUGUST 3, 2010 PAGE 2OF6 Environmental Setting Project I Vacant/Single I Cypress: SF3 (Planning I Canyon Hills Specific Plan Site Family Areas 21 A, 21 B, & 24) Residential North Vacant/ Open Space Open Space: Canyon Hills Undeveloped Specific Plan South Canyon Hills Roadway; Canyon Hills Canyon Hills Specific Plan Road Specific Plan East Vacant/ OS (Open Space) Open Space: Canyon Hills Undeveloped Specific Plan Vacant MF2 (Multiple Family Residential)(Planning Area Project Background Hills Specific Plan On November 1, 2005, the City of Lake Elsinore Planning Commission approved Residential Design Review No. 2005 -13 (Weatherly by Pulte Homes). This approval was for the construction of 131 residential units with three (3) different single family detached plans ranging in size from 1,947 to 2,303 square feet. On January 3, 2006, the City of Lake Elsinore Planning Commission approved Residential Design Review No. 2005 -23 ( Alberbrook by Pulte Homes). This approval was for the construction of 143 residential units with three (3) different single family detached plans ranging in size from 2,607 square feet to 3,050 square feet. The two projects combined totaled 274 residential lots with six (6) different single family detached plans. Staff has had several meetings with the applicant's representatives to review the new project (Residential Design Review No. 2010 -04) with architecture and plotting of the project single family residential product. The proposal was of sufficient quantity and effect that the applicant needed Planning Commission approval (as prescribed in the Canyon Hills Specific Plan) of a Residential Design Review. Proiect Description The proposal is to replace the previously approved "Weatherly and Alderbrook" ( Pulte) product with a new product proposed by Richmond American Homes, within Planning Areas 21A, 21B and 24 of the Canyon Hills Specific Plan. As previously noted, the "Weatherly and Alderbrook" product included the construction of 274 residential units with six (6) different single family detached plans ranging in size from 1,947 square feet to 3,050 square feet. The applicant is proposing to replace one hundred and thirty one (131) of the original 274 " Weahterly and Alderbrook" sites with six (6) new single family PC August 3, 2010 Item No. 4 Page 2 of 82 RDR No. 2010 -04 — RICHMOND AMERICAN AUGUST 3, 2010 PAGE 3OF6 detached plans ranging in size from 1,633 square feet to 2,858 square feet. The new name of the proposed development is Cypress. The applicant has submitted the following plans for the proposed project: (1) building elevations and floor plans for the proposed models and production units; (2) site and landscaping plans for the Model Home Complex and parking lot; and (3) preliminary plotting plans. The following describes the proposed Design Review application: 1. Residential Design Reveiw No. 2010 -04 (Richmond American Homes): This application includes building designs for one hundred and thirty one (131) single - family detached residential units within the Canyon Hills Specific Plan area. This area was originally subdivided by Tract Map No. 30493 for 444 single family residential lots. A single Model Home Complex is also proposed to showcase the proposed residences. Refer to Exhibits B, C, and D which present the site location of the Cypress area, proposed building designs, and the plans for the Model Home Complex, respectively. a. Proposed Residential Units: Richmond American Homes is proposing six (6) different single - family detached plans, as described below. • Plan 1 (Blake): Single -story 1,663 square foot units with three bedrooms (option for a fourth bedroom); 2 baths; great room, study room, dining room; den, kitchen; and laundry room. Two car garage. • Plan 2 (Geneva): Two -story 2,098 square foot units with four bedrooms (option for a fifth bedroom or loft); 2.5 baths; option great room; family room, living room, kitchen; laundry; and nook. Two car garage and a porch entry area. • Plan 3 (Brandon): Two -story 2,395 square foot units with four bedrooms (option for a gourmet kitchen and covered patio); 2.5 baths; great room, game room; dining room, kitchen, nook; and laundry room. Two car garage and a covered porch entry area. • Plan 4 (Magnolia): Two -story 2,594 square foot units with four bedrooms (option for a fifth bedroom and third bath)(also option for a gourmet kitchen and covered patio); 2.5 baths; great room; study room, dining room, kitchen; and laundry room. Two car garage and a covered porch entry area. Plan 5 (Alison): Two -story 2,591 square foot units with four bedrooms (options for a fifth and sixth bedroom, a gourmet kitchen and a study); 2.5 baths; family room, living room (option study), loft (option bedroom six); kitchen; laundry; and nook. Two car garage and a covered porch entry. PC August 3, 2010 Item No. 4 Page 3 of 82 RDR No. 2010 -04 — RICHMOND AMERICAN AUGUST 3, 2010 PAGE 4 OF 6 • Plan 6 (Topaz): Two -story 2,858 square foot units with five bedrooms (option sixth bedroom, gourmet kitchen, and covered patio); 3 baths; living room, dining room, family room, den (option bedroom six); kitchen; laundry; and nook. Two car garage and a covered porch entry. b. Architecture, Materials and Colors: To provide variation in the models and floor plans, the applicant proposes the following: Three different architectural styles for the front elevations, including Santa Barbara, French Country, and American Heritage architectural features and treatments are being offered for each of the six plans (consistent with architectural styles of the existing "Weatherly and Alderbrook" communities. The Santa Barbara Architectural Style includes concrete "S" tile roofs, decorative pipes, curved archways, recessed windows, vents, and exterior openings to the porches. The French Country Style includes concrete flat tile roofs, vertical windows, stone veneer, decorative wood shutters, and columns. The American Heritage Style includes concrete flat tile roofs, vertical windows, brick veneer and decorative wood siding and shutters. • "Standard" and "Enhanced" architectural features and treatments are offered for each of the six plans. "Standard elevations" are minimum features and treatments that will be provided for all plans and include, for example, foam surrounds around all windows and large windows. "Enhanced elevations" are additional features and treatments that will be provided for those elevations that are within the public view. Examples of these enhancements include additional windows and wood shutters. • Ten (10) roofing tile color types will be provided. • Twelve (12) different color schemes will be provided. c. Model Home Complex: A Model Home Complex is proposed within the Planning Area, which is defined as Planning Area 21B by the Canyon Hills Specific Plan. The Model Home Complex will be located off of Chaparosa Drive. Chaparosa Drive will provide primary access to the complex. The proposed complex provides a parking lot with sufficient parking spaces (5 parking spaces), full landscape and hardscape improvements, trees, and shrubs. It should be noted that at the suggestion of Planning Division staff, the applicant has conducted a neighborhood outreach meeting with the adjacent property owners. The developer identified the intention of the meeting was to get the community involved early, understand the adjacent property owner issues and address those concerns where possible within the project design. Approximately five (5) property owners attended the meeting. Issues discussed at the meetings have included product architecture and plotting, concerns relative to construction and approximate sales prices PC August 3, 2010 Item No. 4 Page 4 of 82 RDR No. 2010 -04 – RICHMOND AMERICAN AUGUST 3, 2010 PAGE 5 OF 6 of the new homes. The neighborhood meeting flyer and minutes for the neighborhood meeting is attached for reference (Exhibit 'D'). The applicant has worked diligently with staff in resolving issues relating to this Design Review application. There are no outstanding issues to report. Analysis Staff finds that the proposed project meets the minimum quality and attractiveness of the original project, which was presented to and approved by the Planning Commission. The City of Lake Elsinore Municipal Code refers to designs that create interest, provide varying vistas, and demonstrate quality and originality (Section 17.82.060). Staff feels that the applicant has proposed an acceptable new project without the loss of quality to the overall project design and amenities. Therefore, staff is in support of the proposed project. Environmental Determination Environmental analysis and clearance for the Richmond American Homes project is provided by Addendum No. 2 to the Final Environmental Impact Report for the Canyon Hills Specific Plan. Addendum No. 2 was approved by the City Council on April 10, 2007, to address changes associated with Canyon Hills Specific Amendment No. 2. In accordance with California Environmental Quality Act Guidelines Section 15162, the proposed amendment does not present a substantial change or new information that would require further CEQA analysis. The environmental impacts associated with development of the project were contemplated by Addendum No. 2 to the Final Environmental Impact Report, and were fully analyzed and mitigated therein. No new CEQA documentation is necessary for this project. RECOMMENDATION Adopt Resolution No. 2010 -_ approving Residential Design Review No. 2010 -04 based on the Findings, Exhibits, and proposed Conditions of Approval. Prepared By: Kirt A. Coury, �L Project Planner Reviewed By: Matthew Harris, - Senior Planner Approved By: Bob Brady, City Manage PC August 3, 2010 Item No. 4 Page 5 of 82 RDR No. 2010 -04 — RICHMOND AMERICAN AUGUST 3, 2010 PAGE 6 OF 6 Attachments: 1. Vicinity Map 2. Planning Commission Resolutions 3. Conditions of Approval 4. Reductions of Building Elevations and Floor Plans 5. Reductions of Site and Landscaping Plans for the Model Home Complex 6. Neighborhood Meeting Information (flyer, minutes, and mailing labels) 7. Acknowledgement of Draft Conditions 8. Richmond American Color Architectural Booklet 9. Full Size Plans PC August 3, 2010 Item No. 4 Page 6 of 82 5� f Z _U 72 t C ,O (6 O d J p J J O W Q W Q ~ N d Q � O p O Q m U N Z O °CO o °c °c 0 e °o °c o c 0000 ,'F Canyon Hills PC August 3, 2010 Item No. 4 Page 7 of 82 m m W ° z Z � � w z m d 0 K p Z Z > U K p ¢ Z Z > m R 2 Z Z � 4 I � A M ( P m R 9 11 ffi � 1 0 � I \ A p J J O W Q W Q ~ N d Q � O p O Q m U N Z O °CO o °c °c 0 e °o °c o c 0000 ,'F Canyon Hills PC August 3, 2010 Item No. 4 Page 7 of 82 RESOLUTION NO. 2010- A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE ELSINORE, CALIFORNIA, ADOPTING FINDINGS THAT THE PROJECT IS EXEMPT FROM THE MULTIPLE SPECIES HABITAT CONSERVATION PLAN (MSHCP) WHEREAS, Richmond American Homes has submitted an application for an amendment to the "Cypress" development identified as Residential Design Review No. 2010 -04 (the "Entitlements "), for the design and plotting of a single - family residential product within the Canyon Hills Specific Plan at the terminus of Hillside Drive, east of Canyon Hills Road; and WHEREAS, Section IV(D) of the City of Lake Elsinore's MSHCP Implementing Resolution expressly exempts from the MSHCP: Any project for which and to the extent that vested rights to proceed with the project notwithstanding the enactment of this Resolution exist under the common laws of the State of California, a vesting tentative map pursuant to the Subdivision Map Act, a development agreement pursuant to Government Code section 65864 et seq., or other instrument, approved or executed by the City prior to adoption of this Resolution. Projects subject to this exemption must comply with all provisions of any applicable state and federal law. WHEREAS, public notice of the Project has been given, and the Planning Commission has considered evidence presented by the Community Development Department and other interested parties at a public hearing held with respect to this item on August 3, 2010. NOW, THEREFORE, THE PLANNING COMMISSION OF THE CITY OF LAKE ELSINORE DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS: SECTION 1. That in accordance with the Lake Elsinore Municipal Code and the MSHCP, the Planning Commission finds that: The Project is exempt from the City's MSHCP Resolution by virtue of vested rights. On July 9, 1990, the City and Pardee - Grossman /Cottonwood Canyon entered into that that certain development agreement (the "Development Agreement'), which expressly exempted the Developer from responsibility for any new development impact fees. The Development Agreement will expire on July 9, 2010. Even though the Project is exempt from the MSHCP, the Developer must comply with other state and federal laws. Consistent with federal law, the applicant had prepared a project- specific Habitat Conservation Plan and has a history of extensive coordination with the wildlife agencies. Where approved for development, the project site has already been graded, cleared, or developed in PC August 3, 2010 Item No. 4 Page 8 of 82 PLANNING COMMISSION RESOLUTION NO. 2010 -05 PAGE 2OF3 accordance with the Project HCP. Given the foregoing, no further action regarding the MSCHP is required. SECTION 2. This Resolution shall take effect from and after the date of its passage and adoption. PASSED, APPROVED AND ADOPTED this 3`d day of August 2010. ATTEST: Bob Brady, City Manager John Gonzales, Chairman City of Lake Elsinore PC August 3, 2010 Item No. 4 Page 9 of 82 RESOLUTION NO. 2010- A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE ELSINORE, APPROVING RESIDENTIAL DESIGN REVIEW NO. 2010 -04 WHEREAS, Richmond American Homes has submitted an application for Residential Design Review No. 2010 -04 identified as "Cypress" (the "Entitlements "), for the plotting of a single - family residential product within the Canyon Hills Specific Plan on the north side of Canyon Hills Road, east of Hillside Drive; and WHEREAS, the Planning Commission of the City of Lake Elsinore has been delegated with the responsibility of approving Residential Design Review requests for residential projects within the Canyon Hills Specific Plan; and WHEREAS, pursuant to the California Environmental Quality Act (Cal. Pub. Res. Code §§ 21000 et seq.: "CEQA ") and the CEQA Guidelines (14 C.C.R. §§ 15000 et seq.), public agencies are expressly encouraged to reduce delay and paperwork associated with the implementation of CEQA by using previously prepared environmental documents when those previously prepared documents adequately address the potential impacts of the proposed project (CEQA Guidelines Section 15006); and WHEREAS, CEQA Guidelines Section 15162 establishes the standard to be used when determining whether subsequent environmental documentation is necessary and says that when an environmental document has already been adopted for a project, no subsequent environmental documentation is needed for subsequent entitlements which comprise the whole of the action unless substantial changes or new information are presented by the project; and WHEREAS, the 1989 Final Environmental Impact Report for the Canyon Hills Specific Plan (SCH #87111606: the "FEIR ") and the 2003 Addendum to FEIR, collectively, evaluated environmental impacts that would result from maximum build -out of the specific plan; and WHEREAS, the Activity comprises part of the whole of the action and does not present substantial changes or new information regarding the potential environmental impacts of the project; and WHEREAS, public notice of the Activity has been given, and the Planning Commission has considered evidence presented by the Community Development Department and other interested parties at a public hearing held with respect to this item on August 3, 2010. NOW THEREFORE, THE PLANNING COMMISSION OF THE CITY OF LAKE ELSINORE DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS: SECTION 1. The Planning Commission has considered the proposed Residential Design Review plotting of production units for the "Cypress" development PC August 3, 2010 Item No. 4 Page 10 of 82 PLANNING COMMISSION RESOLUTION NO. 2010 - PAGE 2 OF 4 and has found them acceptable. The Planning Commission finds and determines that Residential Design Review No. 2010 -04 is consistent with the Canyon Hills Specific Plan. SECTION 2. The Planning Commission finds and determines that the Activity does not present any new information, circumstances, or changes to the project that was analyzed under the FEIR and the 2003 Addendum to the FEIR. The Activity does not change density or intensities of use. It simply establishes standards for the design and plotting of single family residential home product. Therefore, it is not necessary to conduct any further environmental review for the Activity. SECTION 3. That in accordance with Lake Elsinore Municipal Code Chapter 17.82, the Planning Commission makes the following findings for the approval of Residential Design Review No. 2010 -04: 1. The Activity complies with the Goals, Objectives and Policies of the General Plan and the Canyon Hills Specific Plan, as approved. The General Plan designates the site as "Canyon Hills Specific Plan." The Canyon Hills Specific Plan designates the site as "SF Single- Family Detached Residential District." Residential Design Review No. 2010 -04, the proposed plotting of approved production units will collectively lead to the construction of a single family residential development that is consistent with the Canyon Hills Specific Plan. 2. The Activity complies with the design directives contained in Chapter 17.82.060 and all other applicable provisions of the Lake Elsinore Municipal Code. The Activity is appropriate to the site and surrounding developments in that it will result in the construction of single- family detached units in accordance with appropriate development and design standards contained in the Canyon Hills Specific Plan. The Activity creates interest and varying vistas as a person moves along any street within the subdivision. The Activity also complements the quality of existing neighboring development and will continue to provide visually - pleasing design and architecture within the area. 3. Conditions and safeguards pursuant to Chapter 17.82.070, including guarantees and evidence of compliance with conditions, have been incorporated into the approval of the Activity to ensure development of the property in accordance with the General Plan, Municipal Code, and Canyon Hills Specific Plan. The Planning Commission has considered the Activity and finds that with the attached conditions of approval, the Activity complies with the purposes and objectives of the General Plan, Municipal Code and Canyon Hills Specific Plan. PC August 3, 2010 Item No. 4 Page 11 of 82 PLANNING COMMISSION RESOLUTION NO. 2010- PAGE 3 OF 4 SECTION 4. Based upon all of the evidence presented, the above findings, and the attached conditions of approval, the Planning Commission hereby approves Residential Design Review 2010 -04. SECTION 5. This Resolution shall take effect from and after the date of its passage and adoption. PASSED, APPROVED AND ADOPTED this 3`d day of August 2010. ATTEST: Bob Brady, City Manager John Gonzales, Chairman City of Lake Elsinore PC August 3, 2010 Item No. 4 Page 12 of 82 PLANNING COMMISSION RESOLUTION NO. 2010- PAGE 4 OF 4 STATE OF CALIFORNIA ) COUNTY OF RIVERSIDE )ss. CITY OF LAKE ELSINORE ) I, Bob Brady, City Manager of the City of Lake Elsinore, California, hereby certify that Resolution No. 2010- as adopted by the Planning Commission of the City of Lake Elsinore at a regular meeting held on the 3rd day of August 2010, and that the same was adopted by the following vote: AYES: NOES: ABSENT: ABSTAIN: Bob Brady City Manager PC August 3, 2010 Item No. 4 Page 13 of 82 CONDITIONS OF APPROVAL FOR RESIDENTIAL DESIGN REVIEW NO. 2010 -04 CANYON HILLS SPECIFIC PLAN GENERAL 1. The applicant shall defend (with counsel acceptable to the City), indemnify, and hold harmless the City, its Officials, Officers, Employees, and Agents from any claim, action, or proceeding against the City, its Officials, Officers, Employees or Agents to attach, set aside, void, or annul an approval of the City, its advisory agencies, appeal boards, or legislative body concerning the Residential Design Review projects attached hereto. PLANNING DIVISION 2. Design Review approval for Residential Design Review No. 2010 -04 will lapse and be void unless a building permit is issued within one (1) year of the approval date. An extension of time, up to one (1) year may be granted by the Community Development Director prior to the expiration of the initial Design Review approval upon application by the developer and payment of required fees one (1) month prior to expiration. 3. All construction shall comply with these Conditions of Approval and those provisions and requirements contained in the Canyon Hills Specific Plan and Municipal Code, prior to issuance of certificate of occupancy and release of utilities. 4. All site improvements shall be constructed as indicated on the approved building elevations and site plan for the model home complex. 5. Future site plotting and construction shall be consistent with these Conditions of Approval, those conditions approved with Tract Map No. 30493 and those provisions and requirements contained in the Canyon Hills Specific Plan and Municipal Code, subject to approval by the Community Development Director or designee. 6. Future site plotting and construction within Tract Map No. 30493 shall comply with the standards and requirements of the SF3, Single - Family Detached Residential District, as defined by the Canyon Hills Specific Plan. Future site plotting shall be shown on precise grading plans, subject to approval by the Community Development Director or designee. 7. The following standard architectural articulation and treatments shall be provided: • Any rock or brick veneer provided at the front elevation will continue to wrap around to the side elevation, to the front wall return. • All front returns will be decorative and masonry concrete walls. Wood fences will not be allowed along the front. • Articulation and treatment will be provided around all windows, not only those windows that are within the public view. At a minimum, foam surrounds will be provided around all windows. PC August 3, 2010 Item No. 4 Page 14 of 82 CONDITIONS OF APPROVAL RESIDENTIAL DESIGN REVIEW NO. 2010 -04 PAGE 2 of 10 • Use of shutters, window mullions, and arched entrances. • Provision of front porches. Provision of hipped form roofs, and gable roof forms. Provision of 12 different color schemes. Provision of varied roof lines. 8. Additional architectural enhancements and treatments shall be provided for those side and rear elevations that are within the public view. The applicant shall indicate which specific side and /or rear elevations will be afforded with enhanced architectural treatments on future precise grading plans, subject to approval by the Community Development Director or designee. The following enhanced architectural treatments will be provided on those side and rear elevations that are within the public right -of -way: Additional windows and wood shutters. Additional siding treatments. 9. Prior to first certificate of occupancy for the models, the applicant shall prepare for City approval an exhibit that shows which side and rear elevations will be provided with architectural enhancements for the project area. 10.AII weep screeds shall be a maximum three inches above any hard surface and four inches above any earth surface. 11.Any revisions to approved site plans or building elevations shall be reviewed and approved by the Community Development Director or designee. 12. Materials and colors depicted on the materials board shall be used unless modified by the Community Development Director or designee. 13. Provide a flat concrete pad or area a minimum of 3'- 0" by T- 0" adjacent to the dwelling for the storage of the City trash barrels. The storage pad or area shall conceal the trash barrels from public view, subject to the approval of the Community Development Director or designee. Precise grading plans shall identify the location of the aforementioned flat concrete pad and air conditioning units. 14. The building addresses (in numerals at least four inches high) shall be displayed near the entrance and easily visible from the front of the unit and public right -of -way. The applicant shall obtain street addresses for all production lots prior to issuance of building permit. PC August 3, 2010 Item No. 4 Page 15 of 82 CONDITIONS OF APPROVAL RESIDENTIAL DESIGN REVIEW NO. 2010 -04 PAGE 3 of 10 15.The applicant shall comply with all requirements of the City's Grading Ordinance. Construction generated dust and erosion shall be mitigated in accordance with the provisions of Municipal Code, Chapter 15.72 and using accepted techniques. Interim erosion control measures shall be provided 30 days after the site's rough grading, as approved by the City Engineer. 16. The applicant shall comply with all applicable City Codes and Ordinances. 17. Prior to issuance of building permit, building plans for the Model Home Complex shall comply with all American Disabilities Act (ADA) requirements, including provision of a handicapped - accessible bathroom. 18.A cash bond of $1,000.00 shall be required for the Model Home Complex. This bond is to guarantee removal of the temporary fencing material, parking lot, etc. that have been placed onsite for the Model Home Complex. The bond will be released after removal of the materials and the site is adequately restored, subject to the approval of the Community Development Director or designee. 19.A cash bond of $1,000.00 shall be required for any garage conversion of the model(s). Bonds will be released after removal of all temporary materials and the site is adequately restored, subject to the approval of the Community Development Director or designee. 20.A cash bond of $1,000.00 shall be required for any construction trailers used during construction. Bonds will be released after removal of trailers, subject to the approval of the Community Development Director or designee. 21.The applicant shall pay school fees to the Lake Elsinore Unified School District prior to issuance of building permit. 22.The project shall connect to sewer and meet all requirements of the Elsinore Valley Municipal Water District ( EVMWD). The applicant shall submit water and sewer plans to the EVMWD and shall incorporate all district conditions and standards. 23. The design and construction of the project shall meet all Riverside County Fire Department standards for fire protection. 24.All mechanical and electrical equipment for the building shall be ground mounted. All outdoor ground or wall mounted utility equipment shall be consolidated in a central location and architecturally screened along with substantial landscaping, subject to the approval of the Community Development Director, prior to issuance of building permit. 25.All front yards and side yards on corner lots shall be properly landscaped with automatic (manual or electric) irrigation system to provide 100 percent plant and grass coverage using a combination of drip and conventional irrigation methods. The final landscaping /irrigation plan is to be reviewed and approved by the City's Landscape PC August 3, 2010 Item No. 4 Page 16 of 82 CONDITIONS OF APPROVAL RESIDENTIAL DESIGN REVIEW NO. 2010 -04 PAGE 4 of 10 Architect Consultant and the Community Development Director or designee. A Landscape Plan check fee will be charged prior to final landscape approval based on the Consultant's fee plus 40 percent. • The applicant shall plant street trees, selected from the City's Street Tree List, at a maximum of 30 feet apart and at least 24 -inch box in size. • Planting within 15 feet of ingress /egress points shall be no higher than 36 inches. • The landscape plan shall provide for ground cover, shrubs, and trees and meet all requirements of the City's adopted Landscape Guidelines. Special attention to the use of Xeriscape or drought resistant plantings with combination drip irrigation system to be used to prevent excessive watering. • All landscape improvements shall be bonded with a 100 percent Faithful Performance Bond for materials and labor for two years from Certificate of Occupancy. • All landscaping and irrigation shall be installed within an affected portion of any phase at the time a certificate of occupancy is requested for any building. • One of the proposed lots of the Model Home Complex shall be Xeriscaped and signage provided identifying Xeriscape landscaping. • The Final landscape plan shall be consistent with any approved site and /or plot plan. • The Final landscape plan shall include planting and irrigation details. 26.All exposed slopes in excess of three feet in height within the subject tract and within private lots shall have a permanent irrigation system and erosion control vegetation installed, as approved by the Planning Division, prior to issuance of certificate of occupancy. 27. The applicant shall prepare a Wall and Fencing Plan for the area comprising of the project area, in compliance with the fencing standards within the Zoning Code Section 17.14.130.D and the Canyon Hills Specific Plan, prior to issuance of any building permit, and subject to the approval of the Community Development Director or designee. 28. Fences located in any front yard shall not exceed three feet in height with the exception that wrought -iron fences may be five feet in height. Chain link fences shall be prohibited. 29. Garages shall be constructed to provide a minimum of 10' x 20' of interior clear space for two cars for a total interior clear space of 20'x 20'. 30. Comply with the Mitigation Monitoring Program that was prepared for the 2003 Addendum to the 1989 Final Canyon Hills Specific Plan EIR. PC August 3, 2010 Item No. 4 Page 17 of 82 CONDITIONS OF APPROVAL RESIDENTIAL DESIGN REVIEW NO. 2010 -04 PAGE 5of10 31. Prior to issuance of any precise grading permit or building permit, the applicant shall sign and complete an "Acknowledgment of Conditions" and shall return the executed original to the Community Development Department for inclusion in the case records. 32.These Conditions of Approval and those conditions approved with Tract Map No. 30493 shall be reproduced on subsequent building plans prior to issuance of building permit. 33. Provisions of the City's Noise Ordinance shall be satisfied during all site preparation and construction activity. Site preparation activity and construction shall not commence before 7:00 AM and shall cease at 5:00 PM, Monday through Friday. Construction activity shall not take place on Saturday, Sunday, or any Legal Holidays. 34. The applicant shall pay all appropriate City fees. 35.The applicant shall place a weatherproof 3' x 3' sign at the entrance to the project site identifying the approved days and hours of construction activity (i.e., 7:00 A.M. — 5:00 P.M., Monday through Friday with no construction activity to occur on Saturdays, Sundays or legal holidays) and a statement that complaints regarding the operation can be lodged with the City of Lake Elsinore Code Enforcement Division (951) 674 -3124. 36. Construction traffic shall be prohibited from the segment of Lost Road south of the project site as a construction truck route. 37.The Homeowner's Association shall maintain all project improvements and facilities, including the private streets, landscaping, park facilities, and drainage improvements. 38.The applicant shall participate in the City's Lighting and Landscape Maintenance District. ENGINEERING DIVISION 39. All roads shall be constructed to be consistent with the Canyon Hills Specific Plan cross section for local and collector roads. Dedicate and improve full width of internal streets. 40. Provide detention /desiltation basin designed to detain the increase in stormwater run -off volume resulting from the development, unless otherwise provided. 41. Grading on adjacent property shall require a "notarized permission to grade" letter from the affected property owner. 42. All slopes, cut or fill, shall comply with UBC requirements for setback from adjacent property lines. Diversion of stormwater flows shall not be allowed. 43. All Public Works requirements shall be complied with as a condition of development as specified in the Lake Elsinore Municipal Code (LEMC) prior to final map approval. PC August 3, 2010 Item No. 4 Page 18 of 82 CONDITIONS OF APPROVAL RESIDENTIAL DESIGN REVIEW NO. 2010 -04 PAGE 6 of 10 44. Underground water rights shall be dedicated to the City pursuant to the provisions of Section 16.52.030 (LEMC), and consistent with the City's agreement with the Elsinore Valley Municipal Water District. 45. Pay all Capital Improvement and Plan Check fees (LEMC 16.34, Resolution 85 -26). 46. Submit a "Will Serve" letter to the City Engineering Division from the applicable water agency stating that water and sewer arrangements have been made for this project. Submit this letter prior to final map approval. 47. Construct all public works improvements per approved street plans (LEMC 12.04). Plans must be approved and signed by the City Engineer prior to final map approval (LEMC 16.34). 48. Street improvement plans and specifications shall be prepared by a Calif. Registered Civil Engineer. Improvements shall be designed and constructed to Riverside County Road Department Standards, latest edition, and City Codes (LEMC 12.04 and 16.34). 49.Applicant shall enter into an agreement with the City for the construction of public works improvements and shall post the appropriate bonds prior to final map approval. 50.Applicant shall obtain any necessary Caltrans permits and meet all Caltrans requirements. 51. Desirable design grade for local streets should not exceed 9 %. The maximum grade of 15% shall only be used because of design constraints approved by the City Engineer. 52. Interior streets shall be designed with 9% as the desired grade and intersecting streets shall meet at a maximum grade of 6 %. The 6% grade shall extend for a minimum of 40- feet. 53. Pay all fees and meet requirements of encroachment permit issued by the Engineering Division for construction of public works improvements (LEMC 12.08 and Resolution 83- 78). 54.AII compaction reports, grade certifications, monument certifications (with tie notes delineated on 8 Y2" x 11" Mylar) shall be submitted to the Engineering Division before final inspection of public works improvements will be scheduled and approved. 55. The applicant shall install permanent survey monuments in compliance with the City's municipal code. 56.Applicant shall obtain all necessary off -site easements for off -site grading from the adjacent property owners prior to final map approval. PC August 3, 2010 Item No. 4 Page 19 of 82 CONDITIONS OF APPROVAL RESIDENTIAL DESIGN REVIEW NO. 2010 -04 PAGE 7 of 10 57. Arrangements for relocation of utility company facilities (power poles, vaults, etc.) out of the roadway or alley shall be the responsibility of the property owner or his agent. 58. Provide fire protection facilities as required in writing by Riverside County Fire. 59. Provide street lighting and show lighting improvements as part of street improvement plans as required by the City Engineer. 60. Developer shall annex to the City's Street Lighting and landscaping Maintenance District. 61. Developer shall install blue reflective pavement markers in the street at all fire hydrant locations. 62. Applicant shall submit a traffic control plan showing all traffic control devices for the tract to be approved prior to final map approval. All traffic control devices shall be installed prior to final inspection of public improvements. This includes No Parking and Street Sweeping Signs for streets within the tract. 63.AII improvement plans and tract maps shall be digitized. At Certificate of Occupancy applicant shall submit tapes and /or discs which are compatible with City's ARC Info /GIS or developer to pay $300 per sheet for City digitizing. 64. All utilities except electrical over 12 kv shall be placed underground, as approved by the serving utility. 65.Apply and obtain a grading permit with appropriate security prior to building permit issuance. A grading plan signed and stamped by a Calif. Registered Civil Engineer shall be required if the grading exceeds 50 cubic yards or the existing flow pattern is substantially modified as determined by the City Engineer. If the grading is less than 50 cubic yards and a grading plan is not required, a grading permit shall still be obtained so that a cursory drainage and flow pattern inspection can be conducted before grading begins. 66. Provide soils, geology and seismic report including street design recommendations. Provide final soils report showing compliance with recommendations. 67. An Alquis- Priolo study shall be performed on the site to identify any hidden earthquake faults and /or liquefaction zones present on -site. In the event a study has been previously completed or the project is outside the study zone, a letter shall be submitted by a licensed geologist or geotechnical engineer stating such a condition does not apply. 68. All grading shall be done under the supervision of a geotechnical engineer and the shall certify all slopes steeper than 2 to 1 for stability and proper erosion control. All manufactured slopes greater than 30 ft. in height shall be contoured. PC August 3, 2010 Item No. 4 Page 20 of 82 CONDITIONS OF APPROVAL RESIDENTIAL DESIGN REVIEW NO. 2010 -04 PAGE 8 of 10 69.Applicant to provide to the City a photographic baseline record of the condition of all proposed public City haul roads. In the event of damage to such roads, applicant shall pay full cost of restoring public roads to the baseline condition. A bond may be required to ensure payment of damages to the public right -of -way, subject to the approval of the City Engineer. 70. Individual lot drainage shall be conveyed to a public facility or accepted by adjacent property owners by a letter of drainage acceptance or conveyed to a drainage easement. 71. On-site drainage facilities located outside of road right -of -way should be contained within drainage easements shown on the final map. A note should be added to the final map stating: "Drainage easements shall be kept free of buildings and obstructions ". 72.All natural drainage traversing site shall be conveyed through the site, or shall be collected and conveyed by a method approved by the City Engineer. 73. Meet all requirements of LEMC 15.64 regarding flood hazard regulations. 74. Meet all requirements of LEMC 15.68 regarding floodplain management. 75. The applicant to provide FEMA elevation certificates prior to certificate of occupancies. 76. Submit Hydrology and Hydraulic Reports for review and approval by City Engineer prior to approval of finalmap. Developer shall mitigate any flooding and /or erosion caused by development of site and diversion of drainage. 77.All drainage facilities in this tract shall be constructed to Riverside County Flood Control District Standards. 78.Storm drain inlet facilities shall be appropriately stenciled to prevent illegally dumping in the drain system, the wording and stencil shall be approved by the City Engineer. 79. Roof and yard drains shall not be allowed to outlet directly through cuts in the street curb. Roof drains should drain to a landscaped area. 80.10 year storm runoff should be contained within the curb and the 100 year storm runoff should be contained within the street right -of -way. When either of these criteria is exceeded, drainage facilities should be installed. 81.A drainage acceptance letter will be necessary from the downstream property owners for outletting the proposed stormwater run -off on private property. 82. Developer shall be subject to all Master Planned Drainage fees and will receive credit for all Master Planned Drainage facilities constructed. PC August 3, 2010 Item No. 4 Page 21 of 82 CONDITIONS OF APPROVAL RESIDENTIAL DESIGN REVIEW NO. 2010 -04 PAGE 9 of 10 83. Provide Tract Phasing Plan for the City Engineer's approval. Bond public improvements for each Phase as approved by the City Engineer. 84. Developer shall agree to participate in and join a Mello Roos Community Facilities District (CFD) for infrastructure improvements and operation. 85. Up -slope maintenance along right -of -ways shall be maintained by the city's lighting and landscaping maintenance assessment district or a homeowner's association. 86. Applicant will be required to install BMP's using the best available technology to mitigate any urban pollutants from entering the watershed. 87.Applicant shall provide the city with proof of his having filed a Notice of Intent with the Regional Water Quality Control Board for the National Pollutant Discharge Elimination System ( NPDES) program with a storm water pollution prevention plan prior to issuance of grading permits. 88.Applicant shall obtain approval from Santa Ana Regional Water Quality Control Board for their storm water pollution prevention plan including approval of erosion control for the grading plan prior to issuance of grading permits. The applicant shall provide a WQMP for post construction which describes BMP's that will be implemented for the development and including maintenance responsibilities. 89. Education guidelines and Best Management Practices (BMP) shall be provided to residents of the development in the use of herbicides, pesticides, fertilizers as well as other environmental awareness education materials on good housekeeping practices that contribute to protection of stormwater quality and met the goals of the BMP in Supplement "A" in the Riverside County NPDES Drainage Area Management Plan. 90.Applicant shall provide first flush BMP's using the best available technology that will reduce storm water pollutants from parking areas and driveway aisles. 91. Intersection site distance shall meet the design criteria of the CALTRANS Design Manual (particular attention should be taken for intersections on the inside of curves). If site distance can be obstructed, a special limited use easement must be recorded to limit the slope, type of landscaping and wall placement. 92. Intersecting streets on the inside radius of a curve will only be permitted when adequate sight distance is verified by a registered civil engineer. 93. All parcels shall have direct access to public right -of -way or be provided with a minimum 30 -foot ingress and egress easement to public right -of -way by separate instrument or through map recordation. PC August 3, 2010 Item No. 4 Page 22 of 82 CONDITIONS OF APPROVAL ,RESIDENTIAL DESIGN REVIEW NO. 2010 -04 PAGE 10 of 10 94. If right -of -way is abandoned as part of this development, then adjacent property affected by the abandonments must still have access to public maintained right -of -way. 95. The final map shall show the abandonment of dedications of public right -of -way or easements by appropriate certifications on the map. 96. Applicant shall record CC & R's for the tract prohibiting on- street storage of boats, motorhomes, trailer, and trucks over one -ton capacity, roof mounted or front yard microwave satellite antennas. The CC & R's shall be approved by the Community Development Director prior to recordation of final map. 97. Applicant shall cause to be recorded a CC &R's with recordation of final map which provides for irrevocable reciprocal parking, circulation, loading and landscape maintenance easement in favor of all lots subject to the approval of the director of Community Development & the City Attorney. The CC& R's shall enforce standards of building maintenance, participation in landscape maintenance, prohibition of outside vehicle or material storage. 98. Applicant shall provide a homeowner's association with CC & R's for maintenance of the open space. 99. All open space and slopes except for public parks and schools and flood control district facilities, outside the public right -of -way will be owned and maintained by either a home owner's association or private property owner. 100. Existing access easements over property must be addressed to the satisfaction of the easement owners prior to final map approval. 101. If the CFD has not been formed at building permit, then the developer shall enter into an agreement with the City to mitigate drainage impacts by payment of a Drainage Mitigation fee. Per recommendations of the Master Drainage Plan developed by RCFCD for the West End, the developer shall deposit $4000 per acre. If a Drainage Assessment District is formed in the West End and that drainage fee is lower than the present fee, a partial refund will be returned. 102. Developer shall provide funding for the re- appropriation calculations of the assessment due to the increase in lots in the assessment district. 103. In accordance with the City's Franchise Agreement for waste disposal & recycling, the applicant shall be required to contract with CR &R Inc. for removal and disposal of all waste material, debris, vegetation and other rubbish generated during cleaning, demolition, clear and grubbing or all other phases of construction. PC August 3, 2010 Item No. 4 Page 23 of 82 Un r�, l W i con CMD r7 PC August 3, 2010 Item No. 4 Page 24 of 82 O � O O �j „n Z� —_ _ O �~ JZ •r�q b � .9 , JN§ cn N O wxwz zoN 3amP ray U Pe PC August 3, 2010 Item No. 4 Page 24 of 82 Iw[ -[9e 16ec1 wf / oA[ -� 16M1 a9[6 ?�IFJ'wi <�� I I el !II D f. 1 S3WOH NVV� OIN 3'W�jtli� ^O m c C i= r� 7i J%J '1 r a O ¢w �ir W(!) ww OJ .F F Obi mom iviuvi90S NOUV311ddtl - OL -9t-LO y y Q LLO r '/- 6Y c� Z m 00 Fgg L \ O Y m G t G G 3 5 J € y z 0 11 o 3 g 0 w m o F a a O v w LL H Z w F w M cr O I L PC August 3, 2010 Item No. 4 Page 25 of 82 5 11 `. F Q Z � J - e o .' e m a t e CC m ¢O w O oW J LL 0 w m o F a a O v w LL H Z w F w M cr O I L PC August 3, 2010 Item No. 4 Page 25 of 82 1G4[ -(9P 6061 zry / m92 -(9y 16MI 49[6 e�1RJ 'a44 �i A9 ptl ayy'awnV euu1RJ 165 Ei wOliP� � �a 1S 33'NNOH INV 011i N 3 Ntl el �.l ` OlI ,A a P. G G t G Willd p S � E E a o o } z Z O U 2 U Z W LL 11 LJ Z Q J EL O O LL J Q F- CC Q a mom itl111W9ns NOI1VOIlddtl - OL -9L -LO N Z M m2 •.. W QJ T wz ^ a FLL r ¢O r J o ¢¢ LL) (/% i m F d 0 Q "Z O & v¢ W Q H w W 2 Z Q _U W W Q W Z Q IL IL O O J LL J Q H Q o_ PC August 3, 2010 Item No. 4 Page 26 of 82 O $ V S+d ° w J E m g i � F z w Ell a o e W Q H w W 2 Z Q _U W W Q W Z Q IL IL O O J LL J Q H Q o_ PC August 3, 2010 Item No. 4 Page 26 of 82 S3WOH HV3lM3WVHj#!.� CNOW- �\ 3 °n! 6!!G / ( /\ �\ }.� IMM %201 o#mNo. 4 Page 2a@ AIOLOz 1tl111NsnS NOUVOIlddV - OR -91-LO IWi -Af 16061 Ty / W9t -M 16061 L19Z6 ?�IteJ 'a'aM xu 35 m O (q a1M5'aeantl R+dM'J 165 __ J 0 u101 lei ije m 2 F1 S///S 33�'���W OH NAAV 71 N� \3)W tle \ f. sp 6 w0 r J azm § N �O ✓� 3 °R° i z s m sli o 1 4 v1 2 a r m 0 x 0 z 0 w o m � G LL LL w J a w J Q z N z O cc LL Q W cr s a s� Re =i §f PC August 3, 2010 Item No. 4 Page 28 of 82 O wW 8 «zcrc.�iam4� � w Z S 6 c� w o c =u e H U- LU J z0.0LOz 1tl111N00S NOI1V011ddtl - OL -%-LO iom -e» Icwi .G i aom -esP ww nms e�yn yw w d nP m z zw 6 f9 ' Y 5 3W NV 3 IN3Ntl� °I 2 O ly81ag 8alppnO [PUAO 3W i0H i w J H V Z y cc V rOY R O wW 8 «zcrc.�iam4� � w Z S 6 c� w o c =u e H U- LU J z0.0LOz 1tl111N00S NOI1V011ddtl - OL -%-LO cr Q W cr E A e §P sg %v ➢E PC August 3, 2010 Item No. 4 Page 29 of 82 w m z zw 6 f9 W r Y O ly81ag 8alppnO [PUAO w J H V Z y cc cr Q W cr E A e §P sg %v ➢E PC August 3, 2010 Item No. 4 Page 29 of 82 motoz 1tl11IW911S NOI1V011ddtl - M-M -10 IWZ -(H (6KI n3 / ro9i - ®> (606) 6936 X110 'au6 ui 6y N U' a S V mw M molll¢D y S m W Q V Q T S/ 33 W O H N/// w V O 1 V 3 3) W tl Ow -� ✓� gl .I ni i m 4 W¢ O 3 <Il o' a F% W F 2 C7 cc �I �I v 0 G= — e— z - a� z o 4U¢— cTi3 H LL W J d 111 J a F w Z O Ir LL E s a 3s s PC August 3, 2010 Item No. 4 Page 30 of 82 $ ZLLOLOd iviimaOS NOI1tlOIlddV - OL -8 1-1,0 lo% —m 16w1 axl / WYUL» W %I 69i6 R�IlO' +u5 �zge � I . F J S33 WOH N///V DiN 3 W tle1 S ' 59� g 'I, ',, WO r n .- O d' rn O 3 iz W m Q 0 bJ cd J 6 V h Z Q J a LL 0 0 M PC August 3, 2010 Item No. 4 Page 31 of 82 Q Q D7 Q m Q F Z Q D Z Q J a O O J LL Ir W O J Z ul 199-L94 I6td1 xd / WR -MY 16061 G9Z6 wuV1O "a N, ya[[ FJ W 9II MK'��V •!wITJ IQS eim9LU9a �, a'% y i CO S33WWiOH N V OII 2 a. O T ¢0 b T C07 a O � 32d /T O € t1 CIO�� F �O0 \ " i L Q Q D7 Q m Q F Z Q D Z Q J a O O J LL Ir W O J Z ul BLLOLOZ 1tl111W80S NOI1VO11ddV - OL -9L -10 FJ W 8 w ZN Q y i CO 2 a. O T ¢0 b T C07 a O � 32d /T O € O F �O0 \ ,o 0 t t t t t r t s — w e 3 U g w o a g a Q Q D7 Q m Q F Z Q D Z Q J a O O J LL Ir W O J Z ul = U F W 8 w W Ir cr � Q C07 a O 1— ~ CL a O O PC August 3, 2010 Item No. 4 Page 32 of 82 ` }! \ �O D� !. ! $ ; ;;t;dEE 2 )! c § \ ! / ) ! ® -0 °z ! i )) ! , 9)) .. ( \ \( \ §I §) } LU _ $ g ( < 4 2 ) LL E R S / \ (L , PC August %3m Item No. Page a#@ ,moo E i E E';, t t E E n;3 gig W-M gig I glR a I wx -�sa 1sn1 ne i 0' uew an �.�. Q m oa R1 a�n5 YwnY �N?J 165 a -'• -- aJ 10�01I1ep a cq w N oJmz 5 3 No H tl\r{ 7.. IV 3 Ww v "! a 3 � (NOY W w� ^O �N /// 0 � a. p € C7 N LULU d ` a J ■Drd H 3:ii & � ,moo E i E E';, t t E E n;3 gig W-M gig I glR a I ALOLOZ iviiin9N9 NOlIV31lddtl - OL -9L-LO w fJ Q m oa � Q -- aJ Q w a cq w N oJmz Q N a 3 � R W w� ^O �O 0 Oj ^CJ g J C7 N LULU d I� a J O H a ,moo E i E E';, t t E E n;3 gig W-M gig I glR a I LL OD m A-dY Q N co Q m oa � co -- Q w a cq w w(f)N a 3 � R W w� ^O X a- 0 Oj ^CJ g J C7 N LULU d I� a J O H a F- o AL O� M1 LL OD m A-dY Q N co Q O^ co -- Q w w w(f)N x� ir W w� X a- 0 Oj J C7 N LULU d a J O H a F- O� A-Y 2 N O Q O^ co cc LL a w w(f)N 20 e C7 N v r0 O r LL O J • 0 'a w m Q Q m Q m Q z Z Q W, Z Q J d O O J LL cr w a a LL O O N w � I � I D m F cap PC August 3, 20'x0 Item No. 4 Page 34 of 82 F1 �O� V+4 Drs /` \) /\ § \ 0 } § ■ Z \ Ll- E \ / E I !° § §)` ■i .! ) F- CC I / \ I \ LL E ( / L d- PC August %3m Item No. Page s@E \ (( )\` ) ! !° § §)` ■i .! ) F- CC I / \ I \ LL E ( / L d- PC August %3m Item No. Page s@E FI CN'�OW-���)!} &!! ! �\ CO } %sm#mNo4 Page aae ZLLOLOZ 1tl111WSnS NOI1VOIlddV - OL-9L -LO xn ias v,v�nv� 9 a 1-0 z a S3 W OH Nv a II H Wtl ' .• Na 2 3 � w d yd� W cc G o -_s 6 � w w . m � h Q e° F- M: CD ir Z o O U. U J 6 V t/1 H LL W J e s s. a °s zL Fm �S Pe PC August 3, 2010 Item No. 4 Page 37 of 82 MOLOZ 1tl111W90S NOI1tl01lddV - OL -91-LO IWi -(9> 16Po1 rei / W9Z (9016061 1916 �M'J'M, W lz malr�lns Imo�Ie0 yy..�.a a2 < �6o r S 3 W O H N V ] I N 3 W V f93u Lp g w z w o a (N `O' '� rr�33_sll a ¢o S = w F awa N Q W ua e z a o _ w e6ad a -o X � z FC Ir V_ cr I— O O ¢ '11 LL v v ti LL LL W J 8 S 3 d 6. �a i� ggF' d� $S PC August 3, 2010 Item No. 4 Page 38 of 82 ZLLOLOZ 1tl111WMS NOUV011ddtl - Ot -%-LO (09:-196 16KI Tea /W3E -LR�1 16161 6926 �I1 +J +!N Uz6e N LJ a,n5'awnV 'a �I�olll� a x 6 Z � (p > O U F �— 5/3�W O N IN tl \i{7..1i�U ^3) W tl �y\ '� „� 9 �I w0 (� i a w z N �OY 1 ✓��/HO a3a3 aa n `_ W W O Q 3e9a 5 c )Z (n z° (7 ¢ LL O L cc Q LL cc v Z F e — j v� h z O Z i L O W J Q U F LL w W J i� L� $Y PC August 3, 2010 Item No. 4 Page 39 of 82 $ ZUOLOZ 1tl111WSOS N011V011ddtl - %-% -LO Nvi -[so (6tW xy / IXM [n I6MI 6R6 euuyq'Wi �zi I N cII w^S'auaV �/p 65 I I �/ ImolAOp Q Z ^ Q r S/ 333 N O H �NvV\i{3 1�iU O a # (NOV \H. 1 ✓� z J 3 W J Q U N PC August 3, 2010 Item No. 4 Page 40 of 82 Ll W J Q U N PC August 3, 2010 Item No. 4 Page 40 of 82 O B 6 SQ g O x � Q 0_ LU e w rr z W O U 6 ~ a O Z w U F Y w W 2 O N a O � o ca 0 w U Q J LL W LL J Q Z O F a O Q cc Q M It Q m Q z Z Q x Z Q J a Ir O O J LL Ir W O J PC August 3, 2010 Item No. 4 Page 41 of 82 IW(- [9616MI iel / W3Z -Ln (6M109i6 R�NeJ'�2 Vi }p pp a1!K'meentl ( 5 / 33 WW O H N V D I I Itl ^ \3 \ ■�W�� \V fl�IFJ IB P1 I � � 2 s• �` OIyL a p O B 6 SQ g O x � Q 0_ LU e w rr z W O U 6 ~ a O Z w U F Y w W 2 O N a O � o ca 0 w U Q J LL W LL J Q Z O F a O Q cc Q M It Q m Q z Z Q x Z Q J a Ir O O J LL Ir W O J PC August 3, 2010 Item No. 4 Page 41 of 82 URI= 1tl111W9O9 NOUVOIlddll - 01-91-LO 0 n m O Q a 0 T w� s N °z 3¢1= a T >2 EE 4 m G �00 JLJ LL � � S s 'p✓. O B 6 SQ g O x � Q 0_ LU e w rr z W O U 6 ~ a O Z w U F Y w W 2 O N a O � o ca 0 w U Q J LL W LL J Q Z O F a O Q cc Q M It Q m Q z Z Q x Z Q J a Ir O O J LL Ir W O J PC August 3, 2010 Item No. 4 Page 41 of 82 y ZROLOZ 1V111Wam NO11VO11ddV - OL -BL -LO WR- A01»41 xH / m9i -M� WO61 Da Rest avn� az6a F j Z FI(NOVI-Drdal"I'l CI o lll y 2 O ~_ 353WOW NV 71tl3WV a . W ¢ m J 11 1 } 2 H Z O U 2 U Z W LL LL v Z Q J a O O J LL 2 W O J J Q F 2 Q EL W C7 Q F- 2 W 2 Z Q U cc W Q 9 Z Q J CL cc O O J LL 2 W O J J Q H 2 Q CL PC August 3, 2010 Item No. 4 Page 42 of 82 M o C7tlttttts ala 6 6 6 a as Wttttty „ w 5 em m m m m a iti € � e a � U } 2 H Z O U 2 U Z W LL LL v Z Q J a O O J LL 2 W O J J Q F 2 Q EL W C7 Q F- 2 W 2 Z Q U cc W Q 9 Z Q J CL cc O O J LL 2 W O J J Q H 2 Q CL PC August 3, 2010 Item No. 4 Page 42 of 82 N fJ QJ m� w� O >Z °U ZUOLOZ 1tl111N9OS NOUV31lddtl - OL -9L-LO O m Q m o 04 N t ¢ d ¢a� r 0) 3 m c waao Q O 4 � f o m w x J W In F EL O Qw mo �Q w °C x� Do J = W D J_ H ~_ 03 Q cc Q M rr Q m Q H Z Q Z IrQ J a O O J U- M W EL a PC August 3, 2010 Item No. 4 Page 43 of 82 WII -L9Y l6MI re3 / W32- L9616W16R6 a.�IFJ +1^I yzat ou •es aw.v aalm lus WO111H� 99 ]�3�p O W N V J I L 3 W V ^ Ol ac$1 & 1SS33,WW �l `OM a EL <!i 3 _ N fJ QJ m� w� O >Z °U ZUOLOZ 1tl111N9OS NOUV31lddtl - OL -9L-LO O m Q m o 04 N t ¢ d ¢a� r 0) 3 m c waao Q O 4 � f o m w x J W In F EL O Qw mo �Q w °C x� Do J = W D J_ H ~_ 03 Q cc Q M rr Q m Q H Z Q Z IrQ J a O O J U- M W EL a PC August 3, 2010 Item No. 4 Page 43 of 82 �)! (NOMDrd \i! � \ §\! ) § {\ ;K; { \ ( § \ (L \ LL E / \ m �� §\ ! 2 ! _ � 0 # 0 ! ! !(! ) b + \ § & $ EL ) LL E ( / \ (L PC August 310 Item No. 4 Page @E gg- tam Eta gR 'gs 0 W W m C N 0 V z 0 6` �y w Q m° 6 U m P'. Q t>a Q F z vs zumoz ivlinens NOIIVOnadv - Ot -M -m u, N ¢2 m O 0 wz OO N Qo § N N 0 a ¢ j iz $ V% s ° ezx 1= �a 010 Item No. 4 Page 45 of 82 IW[ -[9Y WK -11 Of9[ -L1. =6616916 R�a1PJ •a44 ti e . H au5'aacnv .rywollle0 5/33 N OH 1 i x ' }i �°, 64 � (NOL IN///tl��\r3 iota s: , k gg- tam Eta gR 'gs 0 W W m C N 0 V z 0 6` �y w Q m° 6 U m P'. Q t>a Q F z vs zumoz ivlinens NOIIVOnadv - Ot -M -m u, N ¢2 m O 0 wz OO N Qo § N N 0 a ¢ j iz $ V% s ° ezx 1= �a 010 Item No. 4 Page 45 of 82 ZLLOLOZ 1V111WSSS NOIIVDllddtl - OL -%-LO 109i- L96160U xry / W3Z-W x46) aauntl euu110'WL yi €e I � N Q tiJ O S3HOH H 31U3Hv N z �Zm L N =_ <`dp Y 6 Y2 5 ii m F W N m Q Q Q W It A z mi - OFF �g,e` K ca Ctl FC h ■ g Ra P a o its k --- - a Nor 7d �m c4 IV .. I I I I F- o O II L x LL ?_ J a v y F LL W J PC August 3, 2010 Item No. 4 Page 46 of 82 wo= iviim 09 NO1VOil""V - 01 -91 -20 IPK (91 I6I61 ve] / Po9Z (9F 16161 a9Z6 �I]eJ +a+i �i3; e � N W pU auy 'awnY ee 10] l65 i a. Z Z W W 11 'J .f PoS m O Da U' T 5/'3�W O H 1N ////��V \i{7..1r tl ^3J ^W VE °: F w0 N z 4 1-¢r CV �ON ` 1✓M ON F °� a0 S CV i a a'u a ;:u o '.. tip co v m a Y a = w � u i - d - s.s CN3 �5Egg G w °HSV = =am's x w z x V U+ V H Z O [C LL U. U. w W J PC August 3, 2010 Item No. 4 Page 47 of 82 ALOLOZ 1V111Wa0S NOIIV011ddV - OL -9L -LO Io9L- L9116IW aV / owi -M 14061 a9E4 N�H�J >+v �z ii I FJ � UI Olt aH5 °`° "v uta/le Ia �M z f 'J y2 W O 222 Sa WOH Ntl JIa3Wtle a I I w� N z l-,i a N ( /��� i//��i i^��i �r�,�.9 a �o N a „ aw0 V (NO MD D C1 ai s g W O Q w nR W ii¢ ✓ c E+G.i s"ec°ae�F V6 F- ro z� 0 .. cc lL F- LL W J PC August 3, 2010 Item No. 4 Page 48 of 82 nimoz ivi11N809 NOUVOIlddtl - 01-91 -LO mr tswi a, i mse -asr uru anc rr��m'+w S;r3a I �, 'I I u� � a1!54unV �^HJ 4a5 a J IwoNep y <d m 2 y2 O o 0 z W r ti S/'wso- 3� WOW N tl ]IM 3 W tl `///��� 'S S �O gN z y O< o ; o a yk3 V a N y Lu �e s J aw �g IL 5 h iyF & 3 M Z Q J a aim PC August 3, 2010 Item No. 4 Page 49 of 82 .� 0 ( _. % Ul \ E ® ( ) / 0 ,q/ R — P . a \ q- 0 M110wr \ M & \ § ƒ cc 0 LL § S § § } 0 PC August 3, 210 Item No. 4 Page &E �7 (NOMDrS \\ /! \�! W\ !n ;\ ! { ! \` .� 0 ( _. % Ul \ E ® ( ) / 0 ,q/ R — P . a \ q- 0 M110wr \ M & \ § ƒ cc 0 LL § S § § } 0 PC August 3, 210 Item No. 4 Page &E W\ !n ;\ ! { ! \` !10 ! ;!!§ \ ` | ;| I IS .� 0 ( _. % Ul \ E ® ( ) / 0 ,q/ R — P . a \ q- 0 M110wr \ M & \ § ƒ cc 0 LL § S § § } 0 PC August 3, 210 Item No. 4 Page &E wowz 1tl111W00S NOIIVDllddtl - OL-SL -LO ICE -[9b om, I WR-[9e WW1 as[s mnlW'a!v an .w a.4+v �xo ins 5 a a 2 m VIeO (_i 2 c" O Q W 5//A- 3�� W O H N////A� tl� D I / 8'� 3] W tl 3�ia wz LO 2 1- a r a c a° oo g Q F- z Z O U 2 U Z W ir LL Z Q J a cr O O J LL M W 3r O J J _Q F- Q IL W Q F- E W Z Q U LU W Q W Z Q J d O O J LL 2 W O J J Q F- CC Q a PC August 3, 2010 Item No. 4 Page 51 of 82 O § T G t t G G t� e v m F- z Z O U 2 U Z W ir LL Z Q J a cr O O J LL M W 3r O J J _Q F- Q IL W Q F- E W Z Q U LU W Q W Z Q J d O O J LL 2 W O J J Q F- CC Q a PC August 3, 2010 Item No. 4 Page 51 of 82 j ZROLOZ 1tl111WSf1S NOUV011ddV - 01-9L -LO IW[ -[90 WaW etl / 099E -(9Y 16M169C6 apn31D 'A4 Uz Eq f J Z � ap5'arenV 4 )RJ 16S a 6 J < J Z a IWO01`0 S3WOH Ntl3 y v mx (h Jo w a IN3Wtl F °!Fg °wz N . �¢ F1 a r (NOVae r= Q Qw Q mo m D ® ® --- w¢ ® ® w xa x ww ' Ul ww w ELI � O Q Q m Q m Q h Z Co Q Z Q J a cc O O J W rr w a a PC August 3, 2010 Item No. 4 Page 52 of 82 s a °;tcctt t � a o U W Qw Q mo m D ® ® --- w¢ ® ® w xa x ww ' Ul ww w ELI � O Q Q m Q m Q h Z Co Q Z Q J a cc O O J W rr w a a PC August 3, 2010 Item No. 4 Page 52 of 82 mmoz 1tli11W90S NOIIV011ddtl - OL -9L -LO IWL -L96 WMI ref /W9L- M 16MI awl eunMJ '>MV Uzfs I FJ 2 i0 08 aM5 'avnV aYreN<]J Z Cli 5 3 N O W N V 71 u- +. i<ia N / \ ///��,.� \V*1 �/A *emu* Fu tl y a> 5? Q F a 0O E Q } F Z O U U Z W LL LL C7 Z Q J a O O LL W W E d rr J Q F- Q a y W (7 Q H W 2 Z Q U LU W Q W Z Q EL EL O O J LL It W d d J Q H LL Q a PC August 3, 2010 Item No. 4 Page 53 of 82 refire � m€ m 5 5 i E } F Z O U U Z W LL LL C7 Z Q J a O O LL W W E d rr J Q F- Q a y W (7 Q H W 2 Z Q U LU W Q W Z Q EL EL O O J LL It W d d J Q H LL Q a PC August 3, 2010 Item No. 4 Page 53 of 82 uwwu iviimens NOUVOIlddtl - OL -eI -LO -m. 15.0 ..a owx -ess 100 nnz w+pJe]'+ul ` rv,gne� o," ! ti p O 5 3 W O W N V O I L 3 W tli'SI S NO Oz ~ (IOW —I�RI 3 All! �L: o a ! = ¢ w . w 4� a= Ys x is Y W¢ cZe 6 FQ G Q P] Q ¢e s o a s¢f,,,- G s c x °mmmi¢ammE z z s e e s�_FSem_m� ] Item No. 4 Page 54 of 82 aw. ivIlmens Nouvondav - oL -9t-Lo N3i- (9016YW ni / WR L� 16061686 N°1�'� Vi au5 •svenV ✓•✓+11016$ 'u ❑ iolOeO : i ¢_ L 2 Q 2 C 5/33 NON NV 3 1M 3'NNtle �zm N �O � qq e a o m N a¢ rd Q W cc C q - e O Wm¢y a�oe G w m � h ° =um�F =z4� H 2 C'3 rW� i w J Q U W 0 Item No. 4 Page 55 of 82 zamoz iviiimanS z .§ ) �0" ��� ®•zZ\ / ) ( _ 2 @ _ as -_\ ) §§ §§ Item No. 4 Page s@E woLou iviiiwan NOIIV011 s G (N��� \/ ! / ! \ ! ) ! )) ! } , \! /\�\ « , / § | }( : |&A §,t: \ I (L ,- LL COE: � PC August %22 Item No. Page 58 @@ Z0.0LOZ itl11IW90S NOUV011ddtl - OL -9L -LO m ZN Q Z m2 Q O wd0 r O C y 3¢a (J Q c V, s J MI fn IWZ- Z9616IW ref / 0G9Z -[91 LLM16R6 RENO '�i^a � � O pry alaK'aiunV Wu110165 P fs y t G F1 e1mo11R0 53 3 N V] 33• ' s+'Al 3WW V �IOY iOH jN/V�7�LN Y Drs s Iti � J 5 < U to 3`<ii v Z0.0LOZ itl11IW90S NOUV011ddtl - OL -9L -LO m ZN Q Z m2 Q O wd0 r O C y 3¢a (J Q c V, s J MI fn w c � O No I t G Q G 'tl O 0_ U s Iti � J 5 < U to 6 � S w c J s° jw UV _ I 0 Y ° h ¢, 'tl O 0_ U w c LO U w CL w w ¢ an I- c4 H ® O O Q Ir Q m cr Q M Q z Z Q Z Q J cr Q 0 J U. it w 0 J PC August 3, 2010 Item No. 4 Page 59 of 82 CNOV\H".� \i! ) \! §! () \(\ I §) \ \ j } I � \ LL E a g k 2 J / / () }A }) }i / } § $ / \ lu ƒ £ \ LL \ S / } PC August 3, 310 Item No. 4 Page E&5 i(§ } § $ / \ lu ƒ £ \ LL \ S / } PC August 3, 310 Item No. 4 Page E&5 3 / S a 94 ON (N0�Dr� \; \ )! \ \ !\I< (! \« i §` ! 3§ < )}: § § \\ °w �,� 4 ;§ �Aw ® ®� P ° w EL ' — nyf o \ 2 \ 0 !!!< \) § \( I(§ & G M / ƒ \ � 0 } § & & \ § 0 PC August 3, 201 o#mNo. 4 Page @E 1wx -rn l5esl ..i � msx -[» (Saal attc x+190 'nt4 si �` OII fi!5'aunv auulgJ 165 elwo111e�_� 53WOW Ntl� 7LN3 ////A�� / la,1113 a t t t t t o y o N a r S h Z 0 U S U Z W S LL y Z Q J LL cr 0 0 J U- 1= w a a J Q f— S Q L1 ZLLOLOZ 1tl111Nom 11011VOIlddtl - 01- 111 -LO N X Z o0 ai Q 0 a N N r O = W R E 0 N m ¢n r iz ¢ amp Q W C7 Q H W S Z Q U LL W Q ni Z Q J L1 S 0 0 J LL S w a a J Q N S Q L1 PC August 3, 2010 Item No. 4 Page 62 of 82 O 3 f a t t t t t s a d H s e Q N � N g W C7 Q H W S Z Q U LL W Q ni Z Q J L1 S 0 0 J LL S w a a J Q N S Q L1 PC August 3, 2010 Item No. 4 Page 62 of 82 /� / L!c:, CNO� ° �( ƒ ] !! \\ EDR %3m Item No. 4 Page e@E mowz 1viiiNanS N011v011ddv - oL -M -10 IYiL -(90 W961 x1 / W9[- C90169fi1 Ay�6 Nn1FJ �� y °�y e � F- J � 5 3 W O H N///vvV 3I v 33HWw v g ° s+ F� _ I WO r m �-zm N (NOM �l Ell § i z N < c w° Z Q r r� €F S Q W cr C A ' O Wq _ cSa C �+ A �y C � m� Co H S 0 S H o O cr LL J Q U N H LL w W J E gs ai 4 PC August 3, 2010 Item No. 4 Page 64 of 82 mowz 1V11IWSOS NOILV011ddV - M-%-LO iosz -m �cew as i aon -� Icw, nazc a,.ono Lv w z h w 5 £a N 5 3W O H v "u: €S ' - a O N ll w ¢ i 3WRO��S Q W o °yam C °e cSve o �tiimec S_fe _ G W uN¢�ae -eel � W z m Q wo _FO -e F- S 10199 5MVIIH9 nWOAn H o 0 c LL _a J a U pl H LL W J x' s 's 3 fia sg $2 PC August 3, 2010 Item No. 4 Page 65 of 82 AtoioZ 1V111NsnS NO11VO11ddV - Ot -9t -LO IWZ -[9Y l6Ml re3 / ONZ -[9e 16e41 «�Z4 a'uule¢J 'zW i=�, 1 H U. 1p a.^5 nV °¢I y0111ie5 S 1 QJI X Z � 'J ie 2 Z Q w ow U Q r (S 3313 N 0 H NAV a1 N ^3)W wz C\f A 3 w Q W zo z�r H 2 %3 H o 0 W < J Q U y r LL W J €a 9`s PC August 3, 2010 Item No. 4 Page 66 of 82 _ e o e zo z�r H 2 %3 H o 0 W < J Q U y r LL W J €a 9`s PC August 3, 2010 Item No. 4 Page 66 of 82 uuowZ 1Vi11W80S N0I1V0IlddV - OL -BL -LO FJ �/ q^ O W y T O y N J oo j d. .a 3 a Aca Q U o s m W a U w 9 Z Q J 0_ LL O O Ir W J 6 U h x Z Q J a LL O O Ir I 6 W J Q U m PC August 3, 2010 Item No. 4 Page 67 of 82 wx -en �cni m I mx -rn uru nnc .!>bHO'av y;l, X >tns'�v eNloiAe'J i� O H tl� 31 b 3 S 3FIC W �f j iN/ �IOY uA R l:) `5 ti o s uuowZ 1Vi11W80S N0I1V0IlddV - OL -BL -LO FJ �/ q^ O W y T O y N J oo j d. .a 3 a Aca Q U o s m W a U w 9 Z Q J 0_ LL O O Ir W J 6 U h x Z Q J a LL O O Ir I 6 W J Q U m PC August 3, 2010 Item No. 4 Page 67 of 82 wx -trs tsesl .•i / oorz -evr uw nxs �Im'aw §: Bc pp aF5'awnY .!olae]I65 a elwo0R0 3-j. S 3FlGlqOM 14 O H NV31 N 3 W tl �� a 3<ii v awwz ltliLWem NOIIV011ddtl - Oa -BL -LO N 6= 6W Q WZ u) r ¢ .aO z r a �° €€N ° ' 3¢ 1- 0 2 Q > Z in � F OO ° z w L U x Y a� EJ 1 W ca s 00 0 r a O 9 6 � m � m h 17frl o W U Q J d W 1L F- a- O Q Q m Q [0 Q z Z Q U t. Z Q J CL ir O O J 1L Ir W O J LOU w �a O PC August 3, 2010 Item No. 4 Page 68 of 82 O g o N G t G GIG ° G S a 0 w w Lou W J 5 ¢ ° ir w a 0 o � W U F- d O z w L U x Y a� EJ 1 W ca s 00 0 r a O 9 6 � m � m h 17frl o W U Q J d W 1L F- a- O Q Q m Q [0 Q z Z Q U t. Z Q J CL ir O O J 1L Ir W O J LOU w �a O PC August 3, 2010 Item No. 4 Page 68 of 82 O Q a 0 Lou ir w a 0 o O U F- d O z w L U x Y a� EJ 1 W ca s 00 0 r a O 9 6 � m � m h 17frl o W U Q J d W 1L F- a- O Q Q m Q [0 Q z Z Q U t. Z Q J CL ir O O J 1L Ir W O J LOU w �a O PC August 3, 2010 Item No. 4 Page 68 of 82 N tE E G G GIG i I i5 o GIs z z O U 2 U Z W ¢ LL C3 z Q J a O O J LL ¢ W O J J Q F ¢ Q a zuow3 itl1LW80S NO[iVOIlddtl - 01 -9L-LO J z m (6 N as •ns'�.v .voxo ras _ a F SS 3� WOH lU3 W tl Ivo!!lep 3ej Ml g (NO INtl t Drd Sv }0 <i. y 9 1 N tE E G G GIG i I i5 o GIs z z O U 2 U Z W ¢ LL C3 z Q J a O O J LL ¢ W O J J Q F ¢ Q a zuow3 itl1LW80S NO[iVOIlddtl - 01 -9L-LO J z m (6 N JQJ T Z2 wz 04 iz a mom p T <�O 3 Q :l Y K g LL w 0 Q H Ir w M z Q U W Q W z Q J a ¢ O O J LL ¢ W O J J Q h ¢ Q a PC August 3, 2010 Item No. 4 Page 69 of 82 e s < o S g °s a b o e s m w x J w a_ a O �¢ w¢ ELC7 J = W J .F O� N xWx -e9t 16061 wail W3Z- G901sesl aWa rtV+IRJ '+A4 Ui�s ¢ ¢ as �urs'+.A.v �isn las 1mop�ep SS3 W OH V*DI N 333 W V ._ bt bz a a a wa0 N 'z55 O F M O O ¢ IK a °fix (NO/ _ Drs e s < o S g °s a b o e s m w x J w a_ a O �¢ w¢ ELC7 J = W J .F O� N Z0.010Z itl111W00S NOIIVOIIddtl - 01 -%-LO m ¢ ¢ 4 Q bt bz a a a wa0 N 'z55 O F M O O ¢ >z e s < o S g °s a b o e s m w x J w a_ a O �¢ w¢ ELC7 J = W J .F O� N N N � ¢ ¢ m m 2i N w wC° X a J O �.':l� o r CC0 LL wm (r,5 o O F-: h N H O O m m H Z Z ¢ J (L Ir O O J LL x w CL CL Z) August 3, 2010 Item No. 4 Page 70 of 82 W9i -L90 (6k1 rtd / W3Z- G9016W 69i6 •lwl6aJ "'4 Yi�± W W5'anwv awl!'] WS - elwo{IleO <.Sa S3 WOH N V ]IN 3 W t t t G G t a 5 assure LLs� oar r F- z z O U 2 U Z w LL LL 9 Z Q J a O O J LL Ir w a a cc J Q F a a W0109 1tl111WBOS NOIIV011ddtl - 01-91-LO N FJ Z m � a ~ W� ¢O N d O d ¢a¢ T iz C/) n 3$ W G G G tlt 3 m aao a;y y iki e 0 0 z s w c� Q w Z Q U LL w Q n Z Q J a. cr O O J LL LL w EL EL D J Q H Q a PC August 3, 2010 Item No. 4 Page 71 of 82 )(( ( §)) \ \ ) } ƒ g \ LL E ( / \ _ 2 m� }\!2! ^M0# °, ! ! ` i `�» ! §!| \! §` ,!!: ) & > \ ( < Eu J 2 \ LL } _ \ ( EL PC August 3, 310 Item No, 4 Page 72 &@ � _® ` �OV \i— \ /! )(( ( §)) \ \ ) } ƒ g \ LL E ( / \ _ 2 m� }\!2! ^M0# °, ! ! ` i `�» ! §!| \! §` ,!!: ) & > \ ( < Eu J 2 \ LL } _ \ ( EL PC August 3, 310 Item No, 4 Page 72 &@ mowz iviiinsnS NOII ., %-% �OM PC August 3, 2010 Item No. 4 Page 2aE j 60.0102 1tl11IW90S NOI1t1011ddtl - 01-91-LO N3L -[9> (6I61 zH / Ol9i -M (6M169ib Mzol1� a A( Yz Ly I F J � Q W alS'aaeaY .ew011� i is aJ 2 i rn � 6 - f ¢ T 53WOH NV 71V3WV F of w0 ti� a zm N QNOM�� J r z n= Ill T. is � Et ,. ,, UU 198!aA 89!DI!9A Ae1aM Q W cr k c o = ¢sa z`rtyh >"` 4 �+ C w S R C � F� cFO� H-5 Qo s� °zF.RU° F 2 Iv zM IM I MINE ::: �1 F o C LL n LL ? w U m F LL W _1 F y8 3� �a dk €E I I I I I A .. I PC August 3, 2 10 Item No. 4 Page 74 of 82 j ELLOLOZ 1V111W90S NOI1V3IlddV - OL-91-LO FI IWi -RY 16K1 xy / pEgE -(9n 16WI w6 soup .w¢ z §0 f J W !K ntl 'u uyeJ ¢5 1 Q J Z Z W W I Ie0 3v �Z N 0 S33��W ON N////A�tl� OIU 3 W tle _ lig y't' ,$` a rU S7 w — m w z S Q c� old Z o Z� 0. L v U W A J 10 Item No. 4 Page 75 of 82 zoo= 1V111NenS NOIIVO(1ddV - % -%-LO nsz -oe sru �n i wvz -mu Isesl avzc ���'w.z 'pia 1- � O U' no as elu�ollle'J ]e < y 2 LO N B U R (7 5/ 3� W O H IN /A tl 7 1�■ ■11 ll3���^ W \\ tl /� @' ,5� g W O Fy, 0 LL Q w j N �OII t 1 <x�l a nz £ Vi 04 i O 4 W LL Q _ Q 1 O Q W fr e z o aw�am pseo�c CCU zo oz� o w�s4�.F�auy� F- x 0 cr Nd12g 901011gg I ahn Z o 00 Q . LL ? r LL w J Y s e F$ S° H 5 d9 w J Q U N PC August 3, 2010 Item No. 4 Page 76 of 82 z"owz 1v111WenS NOIIVOIIddV - OL -91 -Lo N ¢ _ LO N N T NZ a wz of o¢. 0i N 2 Q J a LL 0 0 cc g w J 6 U N 0 Z Q J a LL 0 0 Ir PC August 3, 2010 Item No. 4 Page 77 of 82 IWZ -L9Y 16061 n3 /0491 -L90 (6M1 QY6 •!�^IlPJ 'aMl Ui�p Op ap5'swnv riRi E O!!10'J ; sa � FIC S3 W OH Ntl J1U� tl®' ' 4.0 NO \3)W 5 e: o z"owz 1v111WenS NOIIVOIIddV - OL -91 -Lo N ¢ _ LO N N T NZ a wz of o¢. 0i N 2 Q J a LL 0 0 cc g w J 6 U N 0 Z Q J a LL 0 0 Ir PC August 3, 2010 Item No. 4 Page 77 of 82 O 2 z .c o 0 a V S U O it iF 55.4 w i � W O M LL O Z m? J `a n W 0 o ii n m S0 VJ ii �'u s � a o m•N d ©a 4�� r. .. Y� U m �pUO�� 4 0➢ Up� UOY� 0'° �"y 9QDOS, O_ tVISm O O t Q¢ J diiJ 41 n_LL 4,10 41 °p U °p Zp Co ¢ Z LLI Q — i 0 <N ( p 400i`�U �.OiOi c ©mUU UO� Qi UaU uz U�> U (L -j IV. p�O�0U36 pFFI1.FFN<�.T 4F �iUO IN 1°L all p U6UILN 1f�6ld 4Z W O _:V N`T 111 y�- 'QV�!= OIO IVmx N.O _I: �Iry ryl':ryry p!U_rvmVNmrmvO JI NI,IN �INNNNtIN V" 2 z .c o 0 a V S U O it iF 55.4 w i � W O M LL O Z m? J W 0 r S0 VJ ii 2 z .c o 0 a V S U O it iF 55.4 w i � W O M LL O Z 3, 2010 Item No. 4 Page 78 of 82 J W 0 S0 VJ T� 1 0Z a �- Z O Q¢ Uo Z U Co ¢ Z LLI Q — i 0 <N I _j w Oo� =6 }cr Q uz U�> U (L -j ce p- 3, 2010 Item No. 4 Page 78 of 82 Alderbrook and Weatherly Community Forum Richmond American Homes invites you to join us Thursday, July 8th at 6:00pm, at the Association Club House 31989 Hollyhock Way, Lake Elsinore, CA 92532 Richmond American Homes has been building & financing the American Dream for over 37 years. Our reputation has been built on providing high - quality homes that are designed to meet our customer's needs and lifestyles. We have heard many of the wonderful accolades and testimonials of people living in Canyon Hills and are proposing to build out the remainder of your community. We would like to share our vision with you and welcome you to join us so we can get your positive feedback. For additional information, please contact Sondra Netzer, Vice President of Planning at sondra.netzer @mdch.com. PC August 3, 2010 Item No. 4 Page 79 of 82 Bridgegate Community Meeting Minutes Where will models be built? o Two model lots, one parking lot - Where will single -story plans be? o Located in only one area (Alderbrook), where they would fit on the existing lot size - Is Richmond going to finish the park? o RAH did not buy the park but Pardee has an obligation to finish the park based on bonds, etc. - Pricing o Difficult to determine due to changing market, but expecting to start in high $200,OOOs - When will sales start? • Determined by when Planning Commission approval would occur • If approved in August, could begin building the models in late August and potentially open models in late September /October - American Heritage elevation color (green) — possibly incompatible with existing home color schemes • Siding might also be incompatible (no siding, all stucco in larger lot homes) • Might need to use more muted colors on American Heritage to blend in more with surrounding elevations and color schemes • Don't use 106 -108 don't use American Heritage - Landscaping on three lots in BO — RAH responsible for weed abatement o Need to take out weeds throughout and fix sink hole - Street lights — installation will be done by RAH - Street light on Chaparosa Drive (no street light at end of cul de sac by Otay Way) - Email start dates out - Start landscaping on slopes as building continues and start weeding next to sidewalks - Sinkhole: find out when it will be fixed - Bonuses for buying in the community (referral bonus) — done by Pulte o Check to see if have program already PC August 3, 2010 Item No. 4 Page 80 of 82 i�IrJ �j�1�5 Oyu t k - Ca,4,on Aclolress 31MIS /ffAr7U 01,26 -1 W90 cff4?,4?ZSSA I elw 311,310 C�i�je�trossa. e rnA,i l F>jo//f P 6 Vit21 ?--dh/. AlCr tfuYz�(�caol Cb7✓T 7ir�car,kbet7 ct6A c 0 M PC August 3, 2010 Item No. 4 Page 81 of 82 CITY OF LPLLSINOIJE DREAM EXTREME- ACKNOWLEDGMENT OF "DRAFT" CONDITIONS OF APPROVAL Subject: Residential Design Review No. 2010 -04 a request for building designs and a model home complex for a housing project located within the Planning Areas 21A, 21B, and 24 of the Canyon Hills Specific Plan (Cypress). I hereby state that I have read and acknowledge the Draft Conditions of Approval and do hereby agree to accept and abide by all final Conditions that will be approved by the Planning Commission /City Council. I also understand that all Conditions shall be met prior to issuance of permits or prior to the first Certificate of Occupancy, or as otherwise indicated in the Conditions. *The decision of the Planning Commission of the City of Lake Elsinore shall be final fifteen (15) days from the date of the decision, unless an appeal has been filed with the City Council of the City of Lake Elsinore pursuant to the provisions of Chapter 17.180 of the Lake Elsinore Municipal Code (LEMC). Date: Applicant's Signature: Print Name: Address: Phone Number: AT THE TIME OF PRINTING THE AGENDA, STAFF HAS NOT RECEIVED THE SIGNED ACKNOWLEDGMENT FORM. PC August 3, 2010 Item No. 4 Page 82 of 82