REPORT TO PLANNING COMMISSION
TO: HONORABLE CHAIRMAN
AND MEMBERS OF THE PLANNING COMMISSION
FROM: ROBERT A. BRADY
CITY MANAGER
DATE: JUNE 1, 2010
PROJECT: GENERAL PLAN CONFORMITY DETERMINATION FOR PROPOSED
CAPITAL IMPROVEMENT PROGRAM FOR FISCAL YEARS 2010 -2015
OWNER
& APPLICANT: CITY OF LAKE ELSINORE
Project Request
In accordance with California Government Code Section 65401, City Staff requests that
the Planning Commission adopt the attached Planning Commission Resolution finding
that the proposed five (5) year Capital Improvement Program (CIP), as identified in the
attached form, conforms to the Lake Elsinore General Plan.
Project Location
The CIP consists of various projects, which are not limited to one (1) geographical area,
but rather are planned to occur city -wide. Individual projects will be brought before the
Planning Commission for review in accordance with the Lake Elsinore Municipal Code
and State Laws, as necessary.
Project Descroption
The CIP enables a City to make plans for the installation and refurbishment of public
infrastructure and facilities. The CIP typically sets forth a summary of available funding,
the proposed projects to be constructed, and the estimated cost of each project.
The proposed CIP for fiscal years 2010 -2011 through 2014 -2015 organizes projects
chronologically and details the available funding and estimated costs. This program is a
comprehensive list which includes but is not limited to lake improvements, parks,
streets, and other general capital projects.
PC June 1, 2010 Item No. 5
Page 1 of 12
GENERAL PLAN CONFORMITY FOR CIP
JUNE 1, 2010
Page 2 of 3
Analysis
Staff has analyzed the capital improvement projects as identified in the program to ensure
consistency with the Lake Elsinore General Plan. The following summarizes staffs
analysis:
1. When drafting the CIP, staff consulted the Parks and Recreation, Land Use, and
Circulation Elements within the General Plan, to ensure that the proposed capital
improvement projects were consistent with the policies and restrictions pronounced
therein.
2. The CIP includes various projects which will add park space within the City's
jurisdiction, thereby enhancing quality of life in an urban community through the
creation and preservation of new parkland in accordance with the Parks and
Recreation Element of the Lake Elsinore General Plan. In addition, the CIP
facilitates upgrades and improvements to existing parks and related amenities.
One of the stated purposes of the land use element is to "enhance the quality of life
for the residents of Lake Elsinore ". The element encourages future urbanization
while preserving the environmental characteristics of the City. The capital
improvement projects integrate and reflect these objectives as demonstrated by
the Palm Street Preservation Project, the preservation of existing historic street
lights and incorporating them into the streetscape, and fire station and community
center construction. Implementation of these facilities lead to the enhancement of
the community.
4. The proposed roadway improvements are consistent with the Circulation Element
because they contribute to a balanced circulation system that supports the travel
demands of the land uses by increasing circulation capacity, streamlining the flow
of traffic through signalization, and improving travel quality through the installation
of asphalt overlay.
Environmental Determination
Staff has conducted a preliminary evaluation of these projects and has allocated money
to provide environmental clearance for each as projects are brought forward on an
individual basis.
Recommendation
It is recommended that the Planning Commission:
Adopt Resolution No. finding that the Capital Improvement Program
conforms to the Lake Elsinore General Plan.
PC June 1, 2010 Item No. 5
Page 2 of 12
GENERAL PLAN CONFORMITY FOR CIP
JUNE 1, 2010
Page 3 of 3
2. Direct staff to forward a copy of this report and the Planning Commission
Resolution No. to the City Council as required by Section 65401 of the
Government Code.
Prepared by: Ken Seumalo 0
Director of Public Works
Approved by: Robert A. Brad
�j
City Manager `r�tl
Attachments:
1. Planning Commission Resolution
2. CIP Summary Pages
PC June 1, 2010 Item No. 5
Page 3 of 12
RESOLUTION NO. 2010-
RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
LAKE ELSINORE, CALIFORNIA, FINDING THAT THE CAPITAL
IMPROVEMENT PROGRAM CONFORMS TO THE LAKE ELSINORE
GENERAL PLAN
WHEREAS, the City Council of the City of Lake Elsinore ( "City ") has directed Staff
to assemble a five (5) year program of capital improvement projects to be used as a
guideline for construction of City facilities and infrastructure; and
WHEREAS, this program of projects is collectively called the Capital Improvement
Program; and
WHEREAS, the list of construction projects and improvements either enhances
existing facilities or provides for new facilities in accordance with the guidelines and
requirements contained in the Lake Elsinore General Plan; and
WHEREAS, Staff has reviewed all projects both funded and unfunded and finds
them to be consistent with the guidelines set forth in the Lake Elsinore General Plan; and
WHEREAS, pursuant to California Government Code Section 65401, the Planning
Commission, as a recommending body, must make a finding that proposed capital
projects conform with the Lake Elsinore General Plan; and
WHEREAS, the Planning Commission shall submit a report to the City Council
regarding the capital projects conformity with the general plan in accordance with
California Government Code Section 65401; and
WHEREAS, the Planning Commission has considered evidence presented by
the Community Development Department and other interested parties at a public
meeting held on June 1, 2010.
NOW, THEREFORE, THE PLANNING COMMISSION OF THE CITY OF LAKE
ELSINORE DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS:
SECTION 1. The Planning Commission has considered the capital improvement
projects and has determined that the Capital Improvement Program conforms to the Lake
Elsinore General Plan based upon the following findings:
1. The Capital Improvement Program is consistent with the policies and restrictions
of the City's Parks and Recreation Department and is consistent with the the
General Plan's Land Use and Circulation Elements.
2. The Capital Improvement Program includes various projects which will add park
space within the City's jurisdiction thereby enhancing quality of life in an urban
PC June 1, 2010 Item No. 5
Page 4 of 12
PLANNING COMMISSION RESOLUTION NO. 2010-
PAGE 2 OF 3
community through the creation and preservation of new parkland in accordance
with the Parks and Recreation Department policies set forth in the General Plan.
In addition, the Capital Improvement Program facilitates upgrades and
improvements to existing parks and related amenities throughout the City.
3. One of the stated purposes of the Land Use Element is to "enhance the quality of
life for the residents of Lake Elsinore ". The element encourages future
urbanization while preserving the environmental characteristics of the City. The
proposed capital improvement projects integrate and reflect these objectives as
demonstrated by the Palm Street Preservation Project, the preservation of existing
historic street lights and incorporating them into the streetscape, and fire station
and community center construction. The implementation of these facilities adds to
the enhancement of the community.
4. The proposed roadway improvements are consistent with the Circulation Element
because they contribute to a balanced circulation system that supports the travel
demands of the land uses by increasing circulation capacity, streamlining the flow
of traffic through signalization, and improving travel quality through the installation
of asphalt overlay.
SECTION 2. This Resolution shall take effect from and after the date of its
passage and adoption.
PASSED, APPROVED AND ADOPTED this 1 st day of May 2010.
Jimmy Flores, Chairman
City of Lake Elsinore
ATTEST:
Robert A. Brady
City Manager
PC June 1, 2010 Item No. 5
Page 5 of 12
PLANNING COMMISSION RESOLUTION NO. 2010-
PAGE 3 OF 3
STATE OF CALIFORNIA
COUNTY OF RIVERSIDE )ss.
CITY OF LAKE ELSINORE )
I, TOM WEINER, Acting Director of Community Development of the City of Lake
Elsinore, California, hereby certify that Resolution No. 2010- was adopted
by the Planning Commission of the City of Lake Elsinore at a regular meeting held on
the 1 st day of June 2010, and that the same was adopted by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
Robert A. Brady
City Manager
PC June 1, 2010 Item No. 5
Page 6 of 12
City of Lake Elsinore, California
CAPITAL IMPROVEMENTPROJECTS- PROPOSED
FYI 1 tiro FY'15
PROJECTS BY DEPARTMENT
Department Project# Priority FY'11 FY'12 FY'13 FY'14 FY'15 Total
GGeneral City
4349
n/a
728,143
Cultural Ctr PEG Broadcast Tech Upgrades
4354
rVa
60,000
60,000
Emergency Operation Center Capital Furnishings
4355
We
20,000
20,000
Sungard H.T.E. Human Resources Module
Gen -0057
n/a
22,950
22,950
General City Total
37,500
102,950
102,950
4359
We
37,500
37,500
Pavement Management Program 2011
PMP11
Park and Recreation
McVicker Park Play Equipment Replacement
PRK -0018
n/a
130,000
130,000
Park and Recreation Total
1,422,143
494,000
130,000
130,000
Street Improvement
Sumner& Heald Pavement Rehabilitation
4349
n/a
728,143
728,143
Railroad Cyn Rd Slope Protection Fence Repair
4353
n/a
130,000
120,000
250,000
Bicycle & Pedestrian Improvements - Riverside Dr
4356
r1a
207,000
207,000
Ingall Circle Slope Repair
4358
Na
37,500
37,500
Lakeview Slope Repair
4359
We
37,500
37,500
Pavement Management Program 2011
PMP11
n/a
282,000
374,000
456,000 487,000 526,000 2,125,000
Street Improvement Total
1,422,143
494,000
456,000 487,000 526,000 3,385,143
Traffic
Macy &Grand Signal
4351
n/a
250,000
250,000
Traffic Total
250,000
250,000
GRAND TOTAL
1,905,093
494,000
456,000 487,000 526,000 3,868,093
Produced Using the Plan -It Capital Planning Software Pagel PC JUrifaltesg l(y4teM nip
Page 7 of 12
City of Lake Elsinore, California
CAPITAL IMPROVEMENT PROJECTS - ACTIVE
FY'11 thru FY'15
PROJECTS BY DEPARTMENT
Department
Project#
Priority
FY Ill
FY'12 FY '13 FY '14
FY 1 15 Total
Drainage
Arroyo Del Torro Drainage Improvement
4295
We
65,000
65,000
Lakeshore- Between Riverside & Chaney
4357
rile
100,000
100,000
Drainage Total
165,000
165,000
General City
Annual Library book Purchase/Building Contribution
4209
n/a
20,000
20,000 20,000 20,000
20,000 100,000
General Plan Update
4253
n/a
109,901
109,901
Rosetta Canyon Fire Station & Park -Phase 1
4270
n/a
148,563
148,563
Chamber of Commerce Building Improvements
4303
n/a
8,567
8,567
Web Site Replacement Project
4305
We
6,460
6,460
Downtown Seismic Retrofit
4327
n/a
262,961
262,961
Emergency Operations Center
4335
n/a
100,000
100,000
E-Gov Initiative Phase II Technology Purchases
4337
n/a
11,027
11,027
Pottery Court Housing
4341
n/a
29,924
29,924
Cultural Center Technology Upgrades
4342
n/a
12,482
12,482
General City Total
709,885
20,000 20,000 20,000
20,000 789,885
Lake
Shoreline Safety Plan
4269
n/a
41,275
41,275
Lake Total
41,275
41,275
Park and Recreation
Lake Community Center Renovation
4287
We
115,370
115,370
Historic Downtown Riverwalk Ext & Nature Trail
4329
n/a
706,994
706,994
Park and Recreation Total
822,364
822,364
Street Improvement
Annual curb, gutter and sidewalk repair program
4024
n/a
130,000
130,000 100,000 100,000
100,000 560,000
Annual Traffic Striping Maintenance
4128
We
130,000
130,000 100,000 100,000
100,000 560,000
Temescal Cyn Bridge . &Road Widening
4344
We
417,652
1,730,000
2,147,652
Lakeshore Drive Overlay
4345
We
546,406
546,406
Diamond Drive Rehabilitation
4347
nla
328,750
328,750
Survey Monuments Replacement
4348
We
34,134
34,134
Gunnerson Rehabilitation
4350
n/a
45,000
405,000
450,000
Street Improvement Total
1,631,942
665,000 1,930,000 20,000
200,000 4,626,942
Traffic
1 -15 /Railroad Canyon Road Project Report
4227
Na
485,673
485,673
Traffic Signal Coordination
4331
We
50,000
50,000
Produced Using the Plan -7t Capital Planning Sofhvare
Page
PC Ju111edkp2WWtem Nw5
Page 8 of 12
Department
Project#
Priority FY Ill FY'12 FY'1
FY'14 FY' Total
Traffic Signal Upgrade
4332
We 50,000
50,000
Traffic Signal Management
4333
We 50,000
50,000
SR- 7411 -15 Interchange Ultimate Improvements
4352
n/a 1,443,535 3,700,000 24,450,000
29,593,535
Traffic Total
2,029,208 3,750,000 24,450,000 30,229,208
GRAND TOTAL 5,399,674 4,435,000 26,400,000 220,000 220,000 36,674,674
Produced Using the Plan -It Capital Planning Software Page PC JUr1ed1gs Mdd�ari
Page 9of12
City of Lake Elsinore, California
CAPITAL IMPROVEMENT PROJECTS- COMPLETED
FY'08 thru FY'12
PROJECTS BY DEPARTMENT
Department Project# Priority FY 1 08 FY'09 FY'10 FY Ill FY 1 12 Total
Drainage
Drainage Master Plan Update 4224 n/a 72,916 117,662 79,053 269,631
Drainage Total
General City
72,916
117,662
Downtown Master Plan & Civic Center
4277
n/a
Branding Project
4281
n/a
Document Management System (DMS) Phase II
4336
n/a
General City Total
406
11,396
25,073
Park and Recreation
160,000
25,073
406
Machado Park Restroom Replacement
4328
n1a
Planet Youth Roof Replacement
4343
n/a
Park and Recreation Total
367,926
1,124,797
Street Improvement
2,340,000
105,354
Bicycle & Pedestrian Improvements
4308
Na
Pavement Management Program 2009
PMP09
n/a
Street Improvement Total
Traffic
SR- 7411 -15 Interchange Interim improvements
4252
n/a
Traffic Total
GRAND TOTAL 742,797 5,552,521 2,1172,129 8,467,447
Produced Using the Plan -It Capital Planning SoJhvare
Page 1
PC JUtlf&4 20,1014 M AIM 5
Page 10 of 12
72,916
117,662
79,053
269,631
91,562
104,631
207,502
16,412
28,234
2,482
209
4,894
301,546
121,252
33,128
196,193
252,146
7,585
455,926
406
11,396
25,073
148,198
160,000
25,073
406
36,469
148,198
185,073
1,849
366,079
20,188
1,104,609
317,963
529,312
340,000
2,000,000
367,926
1,124,797
847,275
2,340,000
105,354
4,021,445
1,090,018
5,216,817
105,354
4,021,445
1,090,018
5,216,817
GRAND TOTAL 742,797 5,552,521 2,1172,129 8,467,447
Produced Using the Plan -It Capital Planning SoJhvare
Page 1
PC JUtlf&4 20,1014 M AIM 5
Page 10 of 12
City of Lake Elsinore, California
CAPITAL IMPROVEMENT PROJECTS - PENDING
FY'11 thru FY 1 15
PROJECTS BY DEPARTMENT
Department
Project#
Priority FY Ill
FY'12 FY'13 FY 1 14 FY'15 Total
300,000
Mill Street( Ave 6 Storm Drain Improvements
U.DRN.0002
5
Drainage
Corydon & Lakeshore Dr. Drainage Improvements
4334
Na
300,000
300,000
Mill Street( Ave 6 Storm Drain Improvements
U.DRN.0002
5
395,000
395,000
Library Street Drainage Improvement
UDRN.0003
5
75,000
75,000
East Hill Street Drainage Improvement
UDRN.0005
5
198,000
198,000
Mill St near Ave 6 Drainage Improvement
U.DRN.0006
5
605,000
605,000
Lakeshore or btwn San Jacinto River Bridge/High St
U.DRN.0007
5
605,000
605,000
Drainage Total
1,878,000
2,178,000
General City
4310
4,672,808
Business Incubator
4326
nla
H T EIGIS Integration
UGEN.0052
Na
General City Total
5
6,220,598
Lake
U.PRK0009
300,000
Boat Launch Improvements
4237
nfa
Lake Department Headquarters & Maintenance Yard
4246
n/a
Wetlands& Riparian Enhancement Project
4273
nla
Elm Grove Beach Rehab -Phase 11
ULKE0001
5
Lake Master Plan Update
ULKE.0002
5
Dredge Inlet Channel
U.LKE.0005
5
Lake Total
5
260,000
Park and Recreation
Tuscany Hills Park Ball Field Light Replacement
Expansion of Senior Center Main Building
Cutlet Channel, Phase I
Strengthen Lakepoint Park Jetty Wall
Lakepoint Park Parking Lot Paving
Swick - Matich Park Improvements
Alberhill Ranch Community Center
McVicker Park Play Equipment Replacement
Summedake Park Play Equipment
Serenity Park Restroom
Swick - Matich Park Scoreboard Installation
Summerhill Park Play Equipment Replacement
City Park Gazebo Renovation
Park and Recreation Total
300,000
1,878,000
2,178,000
4,672,808
4310
4,672,808
25,000
26,000
25,000
4,697,808
550,000
4,697,808
6,220,598
5
6,220,598
300,000
U.PRK0009
300,000
644,490
451,000
644,490
5
1,250,000
1,250,000
U.PRK0012
150,000
150,000
5,370,000
4,375,000
4,375,000
7,165,088
5,775,000
12,940,088
4292
5
68,000
68,000
4310
nla
26,000
26,000
UPRK.0002
5
550,000
550,000
U.PRK0005
5
50,000
50,000
U.PRK0009
5
451,000
451,000
UPRK.0011
5
1,000,000
1,000,000
U.PRK0012
5
2,500,000 2,870,000
5,370,000
U.PRK0018
5
176,000
176,000
U.PRK0019
5
142,000
142,000
UPRK0020
5
260,000
260,000
UPRK.0021
5
60,000
60,000
U.PRK0022
5
120,000
120,000
U.PRK.0023
5
165,000
165,000
26,000 5,542,000 2,870,000
8,438,000
Street Improvement
Lakeshore or Widening & Street Lighting U.STR.0001 5 618,000 2,000,000 2,618,000
Produced Using the Plan -It Capital Planning Software Page I PC J Utt4?-+ w ef41eif1 M60 5
Page 11 of 12
Department Project# Priority FY'11 FY '12 FY '13 FY '14 FY '15 Total
Camino Del Norte Roadway Connection
USTR.0003
5
2,980,000
2,250,000
5,230,000
Graham Ave Reconstruction
U.STR.0004
5
- 60,000
250,000
310,000
Ellis Street Reoonstmc0on
USTR.0005
5
205,000
U.TRF0001
205,000
Nichols Road Improvements
U.STR.0006
5
430,000
770,000
1,200,000
Reid Street Improvements
U.STR.0007
5
234,000
400,000
634,000
Gunnerson Ave Roadway Reconstruction
U.STR.0010
5
265,000
1,120,000
1,385,000
Oakview WaylBeechwood Ln Repair& Drainage Improve
U.STR.0011
5
374,000
Summerhill Ave atLaS frada Traffic Sig Install
374,000
Larson Road Overlay
USTR.0012
5
300,000
UTRF0007
300,000
Limited & Spring Drainage Improvements
U.STR.0016
5
50,000
5
50,000
Railroad Canyon Road Westbound Lane Extenstion
USTR.0018
5
301,000
50,000
301,000
Machado Eastbound Rght- "ay AoglRdwy Construct
U.STR.0019
5
78,000
35,000,000
78,000
Kellog Street-Roadway Paving
U.STR.0023
5
790,000
GRAND TOTAL
790,000
Lake Crest Dr Roadway Reconstruct
USTR.0024
5
100,000
100,000
ColfierAve Median Landscaping
U.STR.0026
5
355,000
355,000
Lakeshore Dr- Graham Ave to Chaney Bike Path
USTR.0027
5
101,000
101,000
Main St Underground Street light Wiring
USTR.0030
5
260,000
260,000
Street Improvement Total
7,501,000 6,790,000
14,291,000
Traffic
SR- 74-15 Project Report
4262
n/a
113,357
113,357
Main St at Lakeshore Dr Traffic Sig Install
U.TRF0001
5
210,000
210,000
Terra Cotta Road Street Closure
UTRF.0002
5
100,000
100,000
Main St at Graham Ave Traffic Signal Install
U.TRF.0003
5
225,000
225,000
Grand Ave and Macy Street Traffic Signal Install
U.TRF.0004
5
240,000
240,000
Grand Ave and Riverside Drive Traffic Sig Install
UTRF.0005
5
250,000
250,000
Summerhill Ave atLaS frada Traffic Sig Install
U.TRF.0006
5
240,000
240,000
Spring St at Graham Ave Traffic Sig Install
UTRF0007
5
225,000
225,000
Gunnerson St and Riverside Dr Traffic Sig Install
UTRF.0008
5
225,000
225,000
Traffic Safety for Schools
UTRF.0009
5
50,000
50,000
1-15/Railroad Canyon Road Ultimate Improvement
U.TRF.0012
5
25,000,000 10,000,000
35,000,000
Traffic Total
113,357 25,000,000 11,765,000
36,878,357
GRAND TOTAL
i
12, 11IZ253 25,000,000 32,461,000 9,660,000
79,423,253
Produced Using the Plan -It Capital Planning Software Page 2 PC Juf46IAgs3,61Ar*9M XW 5