Proiect Request
In accordance with California Government Code Section 65401, City Staff requests that
the Planning Commission adopt the attached Planning Commission Resolution finding
that the proposed five (5) year Capital Improvement Program (CIP), as identified in the
attached form, conforms to the City of Lake Elsinore General Plan.
Project Location
The CIP consists of various projects, which occur at various locations city -wide.
Individual projects that impact the General Plan will be brought before the Planning
Commission for review in accordance with the Lake Elsinore Municipal Code and State
Laws, as necessary.
Project Description
The CIP enables the City to plan for the installation or refurbishment of public
infrastructure and facilities. The proposed program for fiscal years 2011 -2012 through
2015 -2016 organizes projects by project type with details of the available funding and
estimated costs. It is a comprehensive list which includes lake improvements, parks,
streets, and other general infrastructure capital projects. Funding source for these CIP
projects are identified in the program with the proposed projects to be constructed, and
the estimated cost of each project.
PC June 7, 2011 Item No. 3
Page 1 of 47
GENERAL PLAN CONFORMITY FOR CIP
JUNE 7, 2011
Page 2 of 3
Analysis
Staff has analyzed the capital improvement projects as identified in the program to ensure
consistency with the Lake Elsinore General Plan. The following summarizes staffs
analysis:
When drafting the CIP, staff consulted the Parks and Recreation, Land Use, and
Circulation Elements within the General Plan, to ensure that the proposed capital
improvement projects were consistent with the policies and restrictions pronounced
therein.
2. The CIP includes various projects which will enhance park space within the City's
jurisdiction, thereby enhancing quality of life in an urban community through the
improvement and preservation of parkland in accordance with the Parks and
Recreation Element of the Lake Elsinore General Plan. In addition, the CIP
facilitates upgrades and improvements to existing parks and related amenities.
3. One of the stated purposes of the land use element is to "enhance the quality of life
for the residents of Lake Elsinore ". The element encourages future urbanization
while preserving the environmental characteristics of the City. The capital
improvement projects integrate and reflect these objectives as demonstrated by
the Palm Street Preservation Project, the preservation of existing historic street
lights and incorporating them into the streetscape, and fire station and community
center construction. Implementation of these facilities leads to the enhancement of
the community.
4. The proposed roadway improvements are consistent with the Circulation Element
because they contribute to a balanced circulation system that supports the travel
demands of the land uses by increasing circulation capacity, streamlining the flow
of traffic through signalization, and improving travel quality through the installation
of asphalt overlay.
Environmental Determination
Staff has conducted a preliminary evaluation of these projects and has allocated money
to provide environmental clearance for each as projects are brought forward on an
individual basis.
Recommendation
It is recommended that the Planning Commission:
a. Adopt Resolution No. 2011 - finding that the Capital Improvement Program
conforms to the Lake Elsinore General Plan.
PC June 7, 2011 Item No. 3
Page 2 of 47
GENERAL PLAN CONFORMITY FOR CIP
JUNE 7, 2011
Page 3 of 3
b. Direct staff to forward a copy of this report and the Planning Commission
Resolution No. to the City Council as required by Section 65401 of the
Government Code.
Prepared By: Ken Seumalo, Director of Public Works
Reviewed By: Justin Carlson, Redevelopment Agency Analyst 1-+4 F°i �C
Approved By: Robert A. Brady, City Manager G1�
Attachments: V
1. CIP Summary Pages
2. Planning Commission Resolution
PC June 7, 2011 Item No. 3
Page 3 of 47
RESOLUTION NO. 2011-
RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
LAKE ELSINORE, CALIFORNIA, FINDING THAT THE CAPITAL
IMPROVEMENT PROGRAM CONFORMS TO THE LAKE ELSINORE
GENERAL PLAN
WHEREAS, the City Council of the City of Lake Elsinore ( "City") has directed Staff
to assemble a five (5) year program of capital improvement projects to be used as a
guideline for construction of City facilities and infrastructure; and
WHEREAS, this program of projects is collectively called the Capital Improvement
Program; and
WHEREAS, the list of construction projects and improvements either enhances
existing facilities or provides for new facilities in accordance with the guidelines and
requirements contained in the Lake Elsinore General Plan; and
WHEREAS, Staff has reviewed all projects both funded and unfunded and finds
them to be consistent with the guidelines set forth in the Lake Elsinore General Plan; and
WHEREAS, pursuant to California Government Code Section 65401, the Planning
Commission, as a recommending body, must make a finding that proposed capital
projects conform with the Lake Elsinore General Plan; and
WHEREAS, the Planning Commission shall submit a report to the City Council
regarding the capital projects conformity with the general plan in accordance with
California Government Code Section 65401; and
WHEREAS, the Planning Commission has considered evidence presented by
the Community Development Department and other interested parties at a public
meeting held on June 7, 2011.
NOW, THEREFORE, THE PLANNING COMMISSION OF THE CITY OF LAKE
ELSINORE DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS:
SECTION 1. The Planning Commission has considered the capital improvement
projects and has determined that the Capital Improvement Program conforms to the Lake
Elsinore General Plan based upon the following findings:
1. The Capital Improvement Program is consistent with the policies and restrictions
of the City's Parks and Recreation Department and is consistent with the General
Plan's Land Use and Circulation Elements.
2. The Capital Improvement Program includes various projects which will add park
space within the City's jurisdiction thereby enhancing quality of life in an urban
PC June 7, 2011 Item No. 3
Page 4 of 47
PLANNING COMMISSION RESOLUTION NO. 2011 -
PAGE 2 OF 3
community through the creation and preservation of new parkland in accordance
with the Parks and Recreation Department policies set forth in the General Plan.
In addition, the Capital Improvement Program facilitates upgrades and
improvements to existing parks and related amenities throughout the City.
3. One of the stated purposes of the Land Use Element is to "enhance the quality of
life for the residents of Lake Elsinore ". The element encourages future
urbanization while preserving the environmental characteristics of the City. The
proposed capital improvement projects integrate and reflect these objectives as
demonstrated by the Palm Tree Preservation Project, the preservation of existing
historic street lights and incorporating them into the streetscape, and fire station
and community center construction. The implementation of these facilities adds to
the enhancement of the community.
4. The proposed roadway improvements are consistent with the Circulation Element
because they contribute to a balanced circulation system that supports the travel
demands of the land uses by increasing circulation capacity, streamlining the flow
of traffic through signalization, and improving travel quality through the installation
of asphalt overlay.
SECTION 2. This Resolution shall take effect from and after the date of its
passage and adoption.
PASSED, APPROVED AND ADOPTED this 7st day of 2011.
ATTEST:
Robert A. Brady
City Manager
John Gonzales, Chairman
City of Lake Elsinore
PC June 7, 2011 Item No. 3
Page 5 of 47
PLANNING COMMISSION RESOLUTION NO. 2011 -
PAGE 3 OF 3
STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE )ss.
CITY OF LAKE ELSINORE )
I, ROBERT A. BRADY, City Manager, City of Lake Elsinore, California, hereby
certify that Resolution No. 2011- was adopted by the Planning Commission of
the City of Lake Elsinore at a regular meeting held on the 7th day of June 2011, and that
the same was adopted by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
Robert A. Brady
City Manager
PC June 7, 2011 Item No. 3
Page 6 of 47
CITY OF i
LA K� Ea LSIfiO"DE
DREAM EXTREME
PROPOSED PROJECTS
PC June 7, 2011 Item No. 3
Page 7 of 47
City of Lake Elsinore
Capital Improvement Projects-Proposed
Project Listing Total Cost
Inception to Date to FY 2015 -16
Status Project # Project Name
Building and Structure
Proposed Gen -0064 Enclosed Workout Area- McVicker Station #85
Proposed Gen -0065 Building Repairs Reserve
Draina e
Proposed 4366 Slope and Drainage Repairs - Various Locations
General Ci
Proposed
4316
Vehicle Replacements Reserve
Proposed
GEN -0061
Phone System Replacement
Proposed
GEN -0062
Document Scanning
Proposed
GEN -0063
Storage Area Network (SAN) Upgrade
Proposed
GEN -0066
Computer Replacements Reserve
Park and Recreation
Proposed 4292 Tuscany Hills Park Ball Field Light Replacement -Phase I
Proposed PRK -0025 Swick- Matich Park Fencing
Proposed PRK -0029 Machado Park Renovation
Proposed U.PRK -0022 Summerhiil Park Play Equipment Replacement
Street Improvement
Proposed 2012
Annual Asphalt Pavement Maintenance
Proposed 4024
Annual Curb, Gutter and Sidewalk Repair
Proposed 4128
Annual Traffic Striping Maintenance
Proposed PMP12
Pavement Management Program
Traffic
Proposed 4368 Traffic Signal Install- Canyon Hills and Sage
GRAND TOTAL
Total Project Total
45,000
150,000
195,000
175,000
0711-5 0k
102,000
80,000
50,000
25,000
507,000
25,000
50,000
105,000
130,000
310,000
294,000
130,000
130,000
80,000
. 634,000
198,234
2,019,234
PC June 7, 2011 Item No. 3
............Page 8 of 47
City of Lake Elsinore, California
Capital Projects- Proposed
FY '12 tluu FY'16
PROJECTS BY FUNDING SOURCE
Source
Project#
Priority
FY'12
FY '13 FY'14
FY '15 FY '16 Total
11-05-
Mtsc
1
Vehicle Replacement Reserve
4316
rVa
85,000
85,000 80,000
Phone System Replacement
GEN-0O61
Na
102,000
250,000
Document Scanning
GEN-0062
a
Na
80,000
02,000
Storage Area network (SAN) Upgrade
GEN-0063
Na
50,000
80,000
Enclosed Workout Area- Mciticker Station #85
GEN-0064
Na
15,000
50,000
BuVdhV Repair
GEN -0065
Na
50,000
50,000 50,000
15,000
Computer Replacements Reserve
GEN -0066
Na
25,000
150,000
25,000
105 Misc Total
407,000
135,000 130,000
672,000
X112 Measure A
Annual Asphalt Pavement Maintenance
2012
Na
294,000
Annual curb, gutter and sidewalk repair program
4024
Na
130,000
294,000
Annual Traffic Striping Maintenance
4128
Na
130,000
130,000
Slope It Drainage Repairs - Varlous Locations
4366
Na
175,000
130,000
Traffic Signal Install -Can Hills
`N9 Yon Sage
4368
Na
50,000
175,000
Pavement Management Program
PMP12
Na
80,000
50,000
80,000
112 Measure A Total
859,000
859,000
150 CDBG
�
Machado Park Renovation
PRK -0029
Na
75,000
76,000
150 CDBG Total
75,000
75,000
204 Stfnal C.EP.
Traffic Signal lasta0 -Canyon Hil"Sage
4368
Na
148,234
148,234
204 Signal C.I.P. Total
148,234
148,234
L221
Tuscany Hills Pik Bell FaddLight Rpicaim- phase 1
4292
Na
25,000
SwickMa6ch Park Penang
PRK-0025
Na
50,000
25,000
Machado Park Renovation
PRK-0029
Na
30,000
-
50,000
Summerhill Park Play Equipment Replacement
UPRK-0012
Na
130,000
30,000
130,000
221 Parks Total
235,000
235,000
232 City Fire Protection
Enclosed Workout Area4&Vmlw Station 085
GEN -0064
Na
30,000
30,000
Produced Using the Plan -1l Capital Planning Software
Wednesday. June 01. 2011
PC June 7, 2011 Item No. 3
Page 9 of 47
Source Project# Priority FY'12 FY'13 FY'14 FY'15 FY'16 Total
232 City Fire Protection Total 3000 30,000
GRAND TOTAL 1,754,234 135,000 130,000 ?,019,230
Produced Using the Plan -1t Capital Planning Software Wednesday. June 01. 2011
PC June 7, 2011 Item No. 3
Page 10 of 47. .-
City of Lake EIsinore, California
Capital Projects- Proposed
FY 112 thru FY '16
PROJECTS & FUNDING SOURCES BY DEPARTMENT
Department Project# Priority FY 112 FY '13 FY'14 FY '15 FY'16 Total
Building & Structures
Enclosed WodroutAraa -Mti ickerSation#8.5 GEN-0064 rda 45,000
Building Repair Reserve 45,000
GEN-065 nia 50,000 50,000 50.000 150,000
Building & Structures Total 95,000 50.000 50-Mn --
!Drainage
Slope 8 Drainage Repairs- Various Locations 4366 Na 175,000
175.000
Drainage Total 175,000 175,000
General City Total
Na 85,000 85,000 80,000 250,000
Na
102,000
Vehicle Replacement Reserve
4316
Phone System Replacement
GEN-0O61
DmmentScanning
GEN-0062
Storage Area network(SAN) Upgrade
GEN-OM
Computer Replacements Reserve
GEN-M
General City Total
Na 85,000 85,000 80,000 250,000
Na
102,000
102,000
Na
S0.000
60,000
Ma
50.000
50.000
We
25,000
25,000
342A00 65,000 80,060 507,000
;Park and Recreation
Tuscany Hills Prk Ball Rehl LightRplanm -Phase 1 4292 Na 25,000
Swick -Makh Park Fencing PRK -0025 rda 50,000
Machado Park Renovation PRK -0029 Na 105,000
Produced Using the Plan -lt Capital Planning Software
25,000
50.000
105,000
Wednesday, June 01, 2011
PC June 7, 2011 Item No. 3
Page 11 of 47
s
Department Project# Priority FY 112 FY 113 FY'14 FY 115 FY 116 Total
Summed dil Park Play Equipment Replacement U.PRK-0022 We 130,000 130,000
Park and Recreation Total 310,000 310,000
-
• Z�1 Funks._:
X'delW Recreation
;Street Improvement
Annual Asphalt Pavement Maintenance
21112
Annual curb, gullet and sidewalk repair program
4024
Annual Traffic Striping Maintenance
4128
Pavement Management Program
PMP12
Street Improvement Total
n1a
nia
n!a
Na
294,000
294,000
130,000
130,000
130,000
130,000
80.000
00,000
834,000
634,000
:Traffic
Traffic Signal lnsta0- Carryon Hills &Sage 4368 Na 198,234 198,234
Traffic Total 198,234 198,234
Grand Total 1,754,234 135,900 130,000 2,019,234
Produced Using the Plan -It Capital PlanningSpr2ware Wednesday, June 01. 2011
PC June 7, 2011 Item No. 3
Page 12 of 47
City of Lake Elsinore, California
Capital Projects- Proposed
FY'12 thru FY'16
PROJECTS BY DEPARTMENT
Department Project# Priority FY'12 FY '13 FY '14 FY '15 FY 116 Total
Building &Structures J
Encased WakoutArea- McIlidwSta0on 085 GEN-0064 Na 45,000 45,000
Building Repair Reserve GEN-0065 da 50,000 . 50,000 50,000 150000
Building & Structures Total 95,000 50,000 50,000 195,000
Drainage
Slope& Drainage Repairs- Various Locations 4366
Drainage Total
General City
Vehicle Replacement Reserve
Phone System Replacement
Document Scanning
Storage Area network(SAN) Upgrade
ComputerRepscerpena Reserve
General City Total
;Park and Recreation
Tuscany Hillis Prk Ball Field Light Rplannt -Phase
Swick-Mal h Park Fencing
Machado Pads Renove8an '
Summerha Park Play Equipment Replacement
Park and Recreation Total
;Street Improvement
Annual Asphalt Pavement Maintenance
Annual curb. gutter and sidewalk repair program
Annual Traffic Striping Maintenance
Pavement Management Program
Street Improvement Total
ITratlic
Traffic Signal lsta9- Canyon Hills & Sage
Traffic Total
4316
GEN-MY
GEN-M2
GEN-0063
GEN-0066
4292
PRK-0025
PRK-0029
U.PRK-0022
2012
4024
4126
PMP12
4368
Na 175,000 175,000
175,000 175,000
Na
85,000 85,000 80,000
250,000
Na
102,000
102,000
Na
80,000
80000
nta
50,000
50,000
Na
25,000
25,000
34ZOOO 85A00 801900
$07,000
Na
25.000
25,000
n1a
50,000
50,000
ft
105,000
105,000
We
130,000
130,000
310,000
$10,000
Na
294,000
294,000
rda
130,000
130,000
Na
130,000.
130,000
Na
60,000
80,000
634,000
634,000
nla
198,234
198,234
198,234
198,234
GRAND TOTAL. 1,754,234 135,000 130,000 2,019,234
Produced Using the Plan -it Capital Planning Sojiware Wednesday, June 01, 2011
PC June 7, 2011 Item No. 3
Page 13 of 47
Capital Projects- Proposed FY'12 thru FY'16
City of Lake Elsinore, California
Project # GEN -0064
Project Name Enclosed Workout Area - McVicker Station #85
Account# GEN -0064
Department Building &Structures
Contact Fire Battalion Chief
Type Building
Useful Life
Category Buildings & structures
Priority n/a
Total Project Coat: $30,000
uriently Lake Elsinore has three fully staffed fire stations within the City. Only one City station, Canyon Hills Station #94 is fully outfitted with
i enclosed workout station for station personnel. McVicker Park Station #85 currently has a partially enclosed cinder block work out area which
open and exposed to the heat, wind and cold weather.
Fire Department is requesting approval to finish enclosing the etablished area, to include this into the station and make it a conducive
moment for station personnel to complete their daily physical fitness duties and provide the needed protection of all work -out equipment.
re Department is requesting support and approval to help maintain the mandated physical fitness standards needed for all Fire Department
met. Currently, McVicker Park Station 85 has a partially enclosed area that would serve as a much needed enclosed work -out aces, This
me would provide the necessary protection of all work out equipment for several decades to come. it would further provide the necessary
anent for personnel to complete a thorough work -out with out needing to leave the station and attend the local gym. All Fire Department
iel are granted an hour and a half each day to focus on their physical fitness safety. This project would be consistent with Canyon Hills
94's work -out area and equipment.
Expenditures FY
FY'13 FY T14 FY 115 FV'16 Total
Total 30,000 30000
Funding Sources FY'12 FY'13 FY'14 FY'15 FY'16 Total
105 Misc 30,000
30,000
Total 30,000 30,000
Produced Using the Plan -it Capital Planning Sofhvare Page 1 Friday, May 13, 2011
PC June 7, 2011 Item No. 3
Page 15 of 47
° a I � •t
44 � X11
's`� �\�n� ,� a t. ! /t ■ ■ ■i7.
• nr
``✓�i ,K°x t,- .= � it 2e ^m. .. ■
Capital Projects- Proposed
City of Lake Elsinore, California
FY 112 1hru FY'16
Department Building &Structures
Contact P ar k &R
ec Drzwtor
Project N GEN -0065 Type Maintenance
Project Name. Building Repair Reserve Useful Life
Account q GEN-0065 Category Buildings &Structures
Priority n/a
- -r- —•• -- nz'16 1'Y'13 FY '14 FY'15 FY'16 Total
Construction Cost Building 50,000 50,000 50,000 150,000
Total 50.000 50,000 50,000 150,000
FY'12
FY'13
FY 114
FY'15 FY'16 Total
50,000
50,000
50,000
150,000
Total 50,000
50,000
50,000
150,000
Produced Using the Plan -1t Capital Planning Software
Monday. May 23.1011
PC June 7, 2011 Item No. 3
Page 17 of 47
�4. "-
��il�lf`.+,
�.'�
\" :�:<::L ��
Capital Projects- Proposed FY'12 thru FY'16
City of Lake Elsinore, Califomia
Project# 4366
Pralect Name Slope & Drainage Repairs - Various Locations
Account# 4366
Circle slope repair
iew slope repair
iore Drive drainage between Riverside Drive and Chaney Street
Justification
Ingall Circle slope failure.
slope failure.
Department Drainage
Contact Public Works Dimtor
Type improvement
Useful Life
Category Storm Sewcoominage
Priority n/a
Total Project Cost: $175,000
Drive, between Riverside Drive and Chaney Street, new drainage construction due to flooding issues.
Expenditures FY'12 FY '13 FY '14 FY'15 FY'16 Total
Planning/Design 38,000 38,000
Cnstuctn Cost other than Bldg 118,000 118,000
Professional,Tec & Other Svcs 12,000 12,000
Administraton/Insperton 7.000 7,000
Total 175,000. 175,000
Sources FY'12 FY'13 FY'14 FY is FY'16 Total
Total 175,000 175000
Produced Using the Plan -It Capital Planning Software
Page I
Friday, May 13, 2011
PC June 7, 2011 Item No. 3
Page 19 of 47
IFIN
Capital Projects- Proposed FY'12 thru FY'16
City of Lake Elsinore, California
Project# 4316
Project Name Vehicle. Replacement
Acttrount # 4316
Departmcnl
General City
Contact
Public Works Director
Type
Equipment
Useful Life
85,000
Category
Vehicles
Priority
n/a
r: -=a rx •14 FY is FY'16 Total
vehicles 85.000 85,00D _ 80,000 25D_enn
Total 85,000 85,000 80,000 250,000
Funding Sources
FY'12
FY'13
FY'14 FY 115
FY'16 Total
105 Msc
85,000
85,000
80,000
250,000
Total 85,800
85,080
88,080
250,000
Produced Using the Plan-it Capita/ Planning Software
Monday. May 23. 2011
PC June 7, 2011 Item No. 3
Page 21 of 47
Capital Projects - Proposed FY'12 thru FY'16
City of Lake Elsinore, California
Project# GEN -0061
Project name Phone System Replacement
Account# GEN -0061
Department Gencml City
Contact Irsupmvisor
Type Equipmau
Useful life
Category Equipment: Miscellaneous
Priority n/a
Total Project Cost: $102,000
on of a new phone system will benefit the City by increasing reliability, provide expension, link remote City Facilities, enable system
and improve customer service. Project includes new VOIP hardware, system engineering, installation, training, hardware and software
I year warranty and new tedommunication services.
current PBX phone system is antiquated and if the system ever failed, there is no guarantee that it will come back up. 71ie phone system has
lived its life expectancy therefore there is no warranty program and parts are no longer accessible for repair. By consolidating phone lines at
ote City Facilities to a centrally managed VOIP network, an annual telecommunication service savings is achieved.
Expenditures FY'12 FY '13 FY '14 FY'15 FY'16 Total
Equipment 102.000 102.000
Total lozm lo2,oso
Funding Sources FY'12 FY'13 FY 114 FY is FY'16 Total
105 Misc 107.0011
Total 102,000 102 000
Produced Using the Plan-It Capital Planning Software
Page 2
Friday. May 13. 2011
PC June 7, 2011 Item No. 3
Page 23 of 47
Capital Projects- Proposed FY'12 thru FY'16
City of Lake Elsinore, California
Project# GEN -0062
Projecl Name )Document Scanning
Account # GEN-0062
Department
General City
Contact
if Supervisor
Type
Equipment
Useful Life
Category
Equipment: Miscellaneous
Priority
n/a
puott I Total Project Cost: $80,000
Document Scanning Services to convert City papa documents and plans to digital format for archival and retrievial purposes. Project
the scanning for roughly 6000 drawings and 350 boxes of 2000 paper documents from various departramts and imported in the City's
se Document Management System.
Justification
The City has an obligation to retain records based on a document retention schedule. Documents are not being preserved or destroyed creating a
liability for the City to contend with at some future point. Currently, Public Records Requests can take hours or days to search for hard copies at
storage locations and by converting to digital format, it would only take minutes. In addition, the digital information would be backed up by
Information Technology standards preventing the loss of documents from natural diasters.
FY 112 FY'13 FY'14 FY'15, FY 116 Total
Total 80,000 80,000
Sources FY 112 FY 113 FY 114 FY 115 FY '16 Total
Total 80,000 80000
Produced Using the Plan -1t Capital Planning Software
Page 3
Friday, May 13. 2011
PC June 7, 2011 Item No. 3
Page 25 of 47
Capital Projects- Proposed FY'12 thrrr FY'16
City of Lake Elsinore, California
Project GEN -0063
Project Name Storage Area network (SAN) Upgrade
Accountll GEN -0063
Ing the existing 3TB HP Storage Area Network (SAN) MSA 1500 with a 3TB HP
engineering, consulting, installation, data migration and all necessary licensing.
Department General City
Contact
Type Equipment
Useful UNO
Category Equipment: Miscellaneous
Priority o/a
Total Project Cost: 550,000
iA2000 chassis, 14 SAS hard drives
: SANs is the City's data storage foundation for all Windows File Servers and Database applications. The MSA 1500 was purchased in.
18 and is coming up on its 4 year lifecycle schedule. The MSA 1500 is no longer manufactured and replacement parts will become incn
icult to find. Many future City applications like VMWare's Server Failover product and Sungard's Enterprise OneSolution product will
upgrade to the MSA 2000 to increase system reliability and efficiencies.
FY'12 FY'13 FY'14 FY'15 FY'16 Total
50,000 50,000
Total 50,000 50,000
Funding Sources FY'12 FY 113 FY '14 FY'15 FY'16 Total
105 Misc 50,000 50,000
Total 501M 50000
Produced Using the Plan -It Capital Planning Sofhvare Page 4
Friday, May 13. 2011
PC June 7, 2011 Item No. 3
Page 27 of 47
T
Capital Projects- Proposed
City of Lake Elsinore, California
Project# GEN -0066
Project Name Computer Replacements Reserve
FY '12 thru FY '16
Department General City
Contact IT Supervisor
Type Equipment
Useful Life
Category Land
Account At
Priority der
�apentufures NY 112 FY'13 FY'14 FY'15 FY'16 Total
Equipment 25,000 25,000
Total 25,000 25000
Funding Sources FY 112 FY 113 FY'14 FY'ls FY 116 Total
105 Misc 25,ODO_ _ 25.000
Total 25,000 2sOW
Produced Using the Plan -it Capital PlanningS*ware
Monday, May 23.1011
PC June 7, 2011 Item No. 3'
Page 29 of 47
PC June 7, 2011 Item No. 3
. .......Page, 30. of.4.7 ....
Capital Projects - Proposed FY'l2 thru FY '16
City of Lake Elsinore, California
Project# 4292
Project Name Tuscany Hills Park Ball Field Light Replacement
Account# 4292
I - Retrofit 10 light poles
11- Replace all ball field light fixtures.
r of Summerhill Drive and la Strada
Department
Park and Recreation
Contact
Park & Rec Director
Type
Equipment
Useful Life
177,560
Category
Equipment. Miscellaneous
Priority
nfa
Total Project Cost: $193,000
1- Existing light poles show evidence of rust at the base and is to need of a retrofit'repair.
11- New more efficient lights are shielded to minimize spillage and improve lighting on the field. Current system is estimated to be
ing at 70% level due to age.
Expenditures
FY'12
FY'13 FY'14 FY'15 FY 116
Total
Cnstlicm Cost other than Bldg
20,000
157,506
177,560
Administm6onlinspection
2,500
4,500
7,000
Contingency
2.500
6.000
8,500
Total
25,000
168,000
193,000
Funding Sources FY 112 FY '13 FY '14 FY'15 FY 116 Total
221 Parks 25,000
25,000
Unfunded 168,000 168,000
Total 25,M 168,00D 193,060
Produced Using the Plan -1t Capital Planning Software Page 1
t
Tuesday. May 17. 2011
PC June 7, 2011 Item No. 3
Page 31 of 47
s
1.
i
..... Project Area ' `•`�
_• K 1
4r .
as4• `
PROJECT AREA
4 _ t`, �
3} LEN.
N
d NW '
4 "TV�yii` ll Rt i
.15 T mid ?. 6V r
l��•i� �fiFa"
4
CITY OF
LAKE LSIIYORE SWICK MATICH PARK FENCING
DREAM WrREME
City Of lake Elsinore PROJECT ID NUMBER: PRK -0025 Prepared By
PROJECT NUMBER: take Elsinore GIs
139 S. Main St. Oats Saeroes:
Lake Elsinore, CA 92539 Riverside County GIs
(951) 8743124 City of Lake Elsinore GIS
%rwrJake- elsinore.org Slateplane 1,181e3
NG Jude /,'LU11 IteM NO. 3
. .Page 32.of.47 - -,
Capital Projects - Proposed FY'12 rhru FY'16
City of Lake Elsinore, Califomia
Project# PRK -0025
Projectrisate Swick-Matich Park Fencing
Account# PRK -0025
illation of decorative fencing to channel pedestrians
at the base of the slope.
will allow safer passage around the park to the fields.
Department
Park and Recreation
Contact
Type
Unassigned
Useful We
Category
Unassigned
Priority
n/a
Total Project Cost: 550,000
and concrete bleachers. Addition of a
wall will provide support at the bottom of the slope.
Expenditures FY'12 FY'13 FY '14 FY'15 FY '16 Total
Cnstuctn Cost other than Bldg 47.000 47,000
Administrationlinspectlon 3,000 3.000
Total .50,000 - 50,000
Funding Sources FY'12 FY '13 FY'14 FY '15 FY 116 Total
221 Parks 50,000 50,000
Total 50.E 50,000
Produced Using the Plan-It Capual Planning Software
Page 9
Friday, May 13. 2011
PC June 7, 2011 Item No. 3
Page 33 of 47
Capital Projects- Proposed FY'12 writ FY'16
City of Lake Elsinore, California
Project# PRK -0029
Pro ject Name Machado Park Renovation
Account# PRK -0029
Department Pads and Recreation
Contact Park & Rec Director
Type improvement
Useful Lire
Category Pads improvements
Priority n/a
3cription I Total Project Cost: $105,000
renovation includes demolishing and rebuilding two (2) picnic shade structures, the construction of one (1) shade structure over the
ground area, and installation of light poles around the perimeter of the park for public safety.
Justification
The existing picnic shade structures are in need of repair, the shade structures are needed to provide sun protection over the picnic and playground
areas, and the lighting is for public safety in the park.
Expenditures FY'12 FY '13 FY 114 FY 115 FY'16 Total
PlanninglDeslgn 10,500 10,500
Cnstuctn Cost other. than Bldg 65,100 65,100
AdministraOoNlnspection 18.900 18900
Contingency 10,500 10,500
Total 105,000 105000
Funding Sources FY'12 FY '13 FY 114 FY 115 FY'16 Total
150 CDBG 75,000
75,000
221 Parks 30,000 30,000
Total 105,M 105,000
Produced Using the Plan -It Capiral Planning Software
Page I 1
Friday. May 13. 2011
PC June 7, 2011 Item No. 3
Page 35 of 47
4 �4 Jt iti
g- Project Area .r �
lJ
J'
w, \
,OZ �
OT
:n
B
O�
PROJECT AREA
CITY OF �
A
LAKE LSlr ORE
,
SUMMERHILL PARK PLAY EQUIPMENT REPLACEMENT
DREAM EXTREME
PROJECT 10 NUMBER: U.PRK -0022
Prepared By:
city Of lake Elsinoe
PROJECT NUMBER:
Lake Elsinore GiS
130 S. Main SL
Data Source&
Lake Elsinore, CA 92530
Riverakle County GIB
(951) 674 -3124
_
Cdy of Lake Elsinore GIS
w Jake lsinore.crg
Stateplane Nsds3
PC June 7, 2011 Item No. 3
Page.36. of. 47. - ..
Capital Projects- Proposed FY'12 Jtru FY'16
City of Lake Elsinore, California
Project# U.PRK -0022
Project 14ame Summerhill Park Play Equipment Replacement
Account# U.PRK-0022
Department
Park and Recreation
Contact
Park & Rec Director
Type
Equipment
Useful Life
Category
Park Improvements
Priority
nta
Expenditures FY'12 FY'13 FY'14 FY '15 FY'16 Total
Cnstuctn Cost other than Bldg 712,200 112200
AdministrationAnspecOon 7,800 7,800
Contingency 10,000 10,000
Total 130AN 130,000
Sources FY'12 FY'13 FY'14 FY'15 FY'16 Total
iauuuu
Total 130,000 130,000
Produced Using the Plan -[t Capital Planning Software
Page 12
Friday, May 13. 2011
PC June 7, 2011 Item No. 3
Page 37 of 47
Ir
Milo
Capital Projects- Proposed
City of Lake Elsinore, California
Project# 2012
Project Name Annual Asphalt Pavement Maintenance
FY'12 thru FY'16
Department Street Improvement
Contact Public Works Director
Type Maintenance
Useful Life
Category Street Paving
Account# 2012
Priority n/a
Expenditures FY'12 FY'13 FY '14 FY'15 FY'16 Total
Planning/Design 6,000 6000
Cnstuctn Cost other than Bldg 270,000 456,000 487,000 526,000. 1,739,000
Adminlstration/lnspecdon 18.000 1A (IM
Sources
Total
FY'12
FY '13
FY '14
FY '15
FY'16 Total
294,000
456.000
487.000
526.000
1.763.000
Total 294.000
456;000
487.000
526,000
1,763,600
Produced Usingthe Plan -lr Capital Planning Software Page 13
Friday. May 13. 2011
PC June 7, 2011 Item No. 3
Page 39 of 47 i
71
m
K7
su,
Capital Projects- Proposed
City of Lake Elsinore, California
FY'l2 thru FY 116
Department Street Improvement
Contact Public Works Director
Project# 4024
Project name Annual curb, gutter and sidewalk repair program
Type Improvement
Useful Life
Category Street Construction
Account# 4024
Priority nJa
Expenditures FY'12 FY'13 FY 114 FY'15 FY116 Total
Planning/Design 6,000 6,000
Cnstucln Cost other than Bldg 116,000 116,000
Administrationlinspecgon 8,000 8000
Total 130,000 130,000
Funding Sources FY'12 FY'13 FY'14 FY'15 FY 116 Total
112 Measure A 130,000 130,000
Total 130AN 130,000
not used in 2009, rolled to
Produced Using the Plan -1t Capital Planning Software
Page 14 Friday..May 13. 1011
PC June 7, 2011 Item No. 3 '.
Page 41 of 47 -'
n_n
Al
��� I 2
i'
+t
,' ' . ;'1111
�, ,
Capital Projects- Proposed
City of Lake Elsinore, California
Project 4128
Project Name Annual Traffic Striping Maintenance
FY'12 thru FY'16
Department Street bnpmvemem
Contact Public Works Director
Type Maintenance
Useful Life
Catcgory Strm Construction
Account# 4128 Priority n/a
Description Total Project Cost: $130,000
2efiesh traffic striping and traffic legends at various locations throughout the City. This is an annual project intended to maintain the City-wi
raffic striping.
✓arious locations throughout the City.
i uater JVcs 124
oection 6
Total
Funding Sources FY'12 FY '13 FY'14 FY 115 FY'16 Total
112 Measure A 130,1100 130.000
Total 130,600 130,000
not used in 2009, rolled to
Produced Using the Plan -It Capital Planning Software
Page 15 Friday. May 13. 2011
PC June 7, 2011 Item No. 3
Page 43 of 47
, MM 4
w
low
Wool
S$
4k�' �A ZM'
`4
It,
41,
� . , '-,W :.z
Capital Projects- Proposed FY'12 lhm FY'16 Department street Improvement
City of Lake Elsinore, California Contact Public Works Director
Project# PMP1.2 Type Maintenance
Project flame pavement Management Program
Useful Life
Category Street Paving
Account# PMP12 Priority Na
Description Total Project Cost: $80,000
art of the GASB 34 requirements, a street inventory was developed and surveys for rating the condition of the streets have been conducts
ally. The data collected has been incorporated into the City's Micro -Paver Database.
wide
itenance of the existing asphalt streets are managed through the Micro-Paver Data Base. This project
this program.
who assists
lures FY'12 FY'13 FY'14 FY 115 FY'16 Total
ial,Tec R Other Svcs 80.008 80.000
Total 80,000 80 000
Sources FY'12 FY'13 FY '14 FY is FY'16 Total
unsA 80.000
Total 80,000 80,000
Produced Using the Plant Capital Planning Software
Page 16 Friday. Mov 13. 2011
PC June 7, 2011 Item No. 3
Page 45 of 47
Project Area
PROJECT AREA
Rawl •�I'I� ��
IN
�I�� � � ��11i111111111 111►��'
Ems WE
owl M
on r Asir ce � � ,1 � i1111� � ROM
=i i
�!.i��.a��i�►.,"��� %��111►I�■ �� 1111 � �rr111
PC June 7, 2011 Item No. 3
Page 46 of 47
Capital Projects - Proposed FY'12 lhru FY'16
City of Lake Elsinore, California
Project# 4368
Project Name Traffic Signal Install- Canyon Hills & Sage
Account# 4368
Department
Traffic
Contact
Public Works Director
Type
Equipment
Useful Life
Category
Other
Priority
n/a
Expenditures FY'12 FY'13 FY'14 FY'15 FY'16 Total
Planning /Design 10,000 10,000
Cnstuctn Cost other than Bldg 168,234 168.234
Professional,Tec & Other Svcs 8,000 8,000
Administrafion/Inspection 12,000 12,000
Total 198,234 198,234
Funding Sources FY'12 FY 113 FY '14 FY 115 FY'16 Total
112 Measure A 50,000
50,000
204 Signal C.I.P. 146,234 148ZM
Total 198,234 1982M
Produced Using the Plan-ft Capita( Planning Software Page 17 Friday. May 13, 2011