HomeMy WebLinkAboutCity Council Meeting 1/24/2012 - Agenda Item 12- Collier Landscape Median Cost EstimateCITY OF LASE LSINOU DREAM EXTREME. REPORT TO CITY COUNCIL TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: ROBERT A. BRADY CITY MANAGER DATE: JANUARY 24, 2012 SUBJECT: COLLIER LANDSCAPE MEDIAN COST ESTIMATE Background Collier Avenue is a Circulation Element street with classifications varying between Urban Arterial (6- lanes) to Secondary Roadway (4- lanes). It runs northwest to southeast serving travelers between Nichols Road and Spring Street. Although a segment of this roadway serves as State Route 74, it provides an important link to one of the City's major retail centers, Lake Elsinore Outlets. Currently the raised median on Collier Avenue in front of the Lake Elsinore Outlets is mostly bare with a small distribution of Palm Trees. At the regularly scheduled City Council Meeting in December staff was directed to provide a cost estimate for the median landscaping on Collier Avenue fronting the Lake Elsinore Outlets. Discussion Staff developed a cost estimate for three different "levels " of median landscaping: 1) constructing hardscape in the form of stamped colored concrete, 2) placing mulch in the median with a hardscape perimeter along the edge of each median and 3) implementing full City Standard landscaping including trees, shrubs and irrigation. Attachment "B" provides an aerial image of the whole project area as well as an aerial of each median. Attachment "C" is the actual cost estimate. There are 4- sections of median along Collier Avenue in front of the Outlets for a combined length of 4,594 linear feet or approximately 9/10 of a mile. The widths of the medians vary from 2 -feet at the turn pockets to the full width of 14 -feet with planting areas that vary from half an acre to less than a quarter of an acre. AGENDA ITEM NO. 12 Page 1 of 33 Page 2 Notice of Completion January 24, 2012 Stamped Concrete This is the simplest of the three options and provides for stamped, colored concrete to cover the entire median area. The color of the concrete can vary however City Standard requires a "Brick Red #160" by Davis Colors. Like the concrete coloring, the stamp pattern can vary from a brick array to simulated cobblestone however, the City Standard Color lends itself to some version of the "Brick" pattern (hounds tooth, parquet, subway tile, etc.). This option has a construction time estimate of approximately 5 -weeks and a total construction estimate of $588,226. Stamped Concrete and Mulch Stamped Concrete and Mulch provides for a band of stamped, colored concrete lining the interior of the median approximately 12- inches. It is assumed that the color and pattern of the concrete will be similar to that proposed in the "Stamped Concrete" description above. Inside the stamped concrete mulch will be placed to provide a different texture. Staff has estimated using rubberized mulch because the City was awarded a grant which would supplement the funding for this project. This option is not much more complicated to construct than the "Stamped Concrete" option and the construction time is also estimated to be approximately 5- weeks. Because of the reduced amount of concrete and the cost supplement to the mulch, the total cost estimate to construct "Stamped Concrete and Mulch" on these 4 medians is $345,422. Stamped Concrete/Trees /Shrubs This alternative provides for irrigation and the City Standard density of trees and shrubs. The most expensive of the options, the full landscaped median will provide for the most "finished" look. Because of the installation of irrigation and the process of planting, construction time is estimated at 4- months with a landscaping cost of $657,239 and irrigation cost of $438,171. Total cost of construction is estimated at $1,095,410. If the project includes a concrete monument sign per City Standards the cost is estimated to be an additional $12,000 per sign. Fiscal Impact The fiscal impact is dependent on the level of landscaping construction and will vary between $345,422 and $1,095,410 plus additional amenities like the City's monument sign. Page 2 of 33 Page 3 Notice of Completion January 24, 2012 Recommendations 1. Provide staff direction as to the alternative landscape option the Council prefers. 2. Direct Staff to designate a funding source and process the construction costs through that funding source. Prepared by: Peter Ramey Project Engineer Ken Seumalo Director of Public Works Approved by: Robert A. Brady9., City Manager ��YY Attachments: "A" - Vicinity Map "B" - Aerial photo of project site "C" - Engineer's cost Estimate Page 3 of 33 Page 4 of 33 ATTACHMENT "A" Page 5 of 33 VICINITY MAP COLLIER AVENUE MEDIAN LANDSCAPE COST ESTIMATE CITY COUNCIL JANUARY 24, 2012 Page 6 of 33 ATTACHMENT «B" Page 7 of 33 ATTACHMENT i6Cil Page 13 of 33 Page 14 of 33 CITY OF LAKE ELSINORE 130 S. MAIN STREET LAKE ELSINORE, CA 92530 951 674 -3124 X246 HARDSCAPE MEDIAN 1 En ineers Estimate ITEM NO. DESCRIPTION OF ITEM QUANTITY UNIT UNIT PRICE AMOUNT 1 MOBILIZATION 1 LS $3,000.00 $3,000.00 2 SWPPP 1 LS $1,500.00 $1,500.00 3 CLEARING AND GRUBBING 1 LS $2,000.00 $2,000.00 4 DUST CONTROL 1 LS $2,500.00 $2,500.00 5 TRAFFIC CONTROL 1 LS $2,500.00 $2,500.00 6 ROADWAY EXCAVATION 131 CY $40.00 $5,240.00 7 STAMPED CONCRETE (COLORED) 10750 S.F. $7.50 $80,625.00 8 STRIPING /SIGNING 1 LS $1,500.00 $1,500.00 $98,865.00 15% CONSTRUCTION CONTINGENCY $14,829.75 TOTAL EST. CONSTRUCTION COST $113,694.75 DESIGN SERVICES @ 8% $5,684.74 DESIGN SURVEY $0.00 CONSTRUCTION SURVEY $0.00 CONSTRUCTION ADMINISTRATION & INSPECTION @ 3% $3,410.84 $9,095.58 TOTAL ESTIMATED PROJECT COST $122,790.33 Page 14 of 33 Page 15 of 33 CITY OF LAKE ELSINORE 130 S. MAIN STREET LAKE ELSINORE, CA 92530 951 674- 3124 X246 HARDSCAPE MEDIAN 2 En ineers Estimate ITEM NO. DESCRIPTION OF ITEM QUANTITY UNIT UNIT PRICE AMOUNT 1 MOBILIZATION 1 LS $3,000.00 $3,000.00 2 SWPPP 1 LS $1,500.00 $1,500.00 3 CLEARING AND GRUBBING 1 LS $2,000.00 $2,000.00 4 DUST CONTROL 1 LS $2,500.00 $2,500.00 5 TRAFFIC CONTROL 1 LS $2,500.00 $2,500.00 6 ROADWAY EXCAVATION 150 CY $40.00 $6,000.00 7 STAMPED CONCRETE (COLORED) 11800 S.F. $7.50 $88,500.00 8 STRIPING /SIGNING 1 LS $1,500.00 $1,500.00 $107,500.00 15% CONSTRUCTION CONTINGENCY $16,125.00 TOTAL EST. CONSTRUCTION COST $123,625.00 DESIGN SERVICES @ 8% $9,890.00 DESIGN SURVEY $0.00 CONSTRUCTION SURVEY $0.00 CONSTRUCTION ADMINISTRATION & INSPECTION @ 3% $3,708.75 $13,598.75 TOTAL ESTIMATED PROJECT COST $137,223.75 Page 15 of 33 Page 16 of 33 CITY OF LAKE ELSINORE 130 S. MAIN STREET LAKE ELSINORE, CA 92530 951 674 -3124 X246 HARDSCAPE MEDIAN 3 En ineers Estimate ITEM NO. DESCRIPTION OF ITEM QUANTITY UNIT UNIT PRICE AMOUNT 1 MOBILIZATION 1 LS $3,000.00 $3,000.00 2 SWPPP 1 LS $1,500.00 $1,500.00 3 CLEARING AND GRUBBING 1 LS $2,000.00 $2,000.00 4 DUST CONTROL 1 LS $1,500.00 $1,500.00 5 TRAFFIC CONTROL 1 LS $2,500.00 $2,500.00 6 ROADWAY EXCAVATION 90 CY $40.00 $3,600.00 7 STAMPED CONCRETE (COLORED) 7000 S.F. $7.50 $52,500.00 8 STRIPING /SIGNING 1 LS $1,500.00 $1,500.00 $68,100.00 15% CONSTRUCTION CONTINGENCY $10,215.00 TOTAL EST. CONSTRUCTION COST $78,315.00 DESIGN SERVICES @ 8% $6,265.20 DESIGN SURVEY $0.00 CONSTRUCTION SURVEY $0.00 CONSTRUCTION ADMINISTRATION & INSPECTION @ 3% $2,349.45 $8,614.65 TOTAL ESTIMATED PROJECT COST $86,929.65 Page 16 of 33 Page 17 of 33 CITY OF LAKE ELSINORE 130 S. MAIN STREET LAKE ELSINORE, CA 92530 951 674 -3124 X246 HARDSCAPE MEDIAN 4 En ineers Estimate ITEM NO. DESCRIPTION OF ITEM QUANTITY UNIT UNIT PRICE AMOUNT 1 MOBILIZATION 1 LS $3,000.00 $3,000.00 2 SWPPP 1 LS $1,500.00 $1,500.00 3 CLEARING AND GRUBBING 1 LS $3,000.00 $3,000.00 4 DUST CONTROL 1 LS $2,500.00 $2,500.00 5 TRAFFIC CONTROL 1 LS $2,500.00 $2,500.00 6 ROADWAY EXCAVATION 270 CY $40.00 $10,800.00 7 STAMPED CONCRETE (COLORED) 21900 S.F. $7.50 $164,250.00 8 STRIPING /SIGNING 1 LS $1,500.00 $1,500.00 $189,050.00 15% CONSTRUCTION CONTINGENCY $28,357.50 TOTAL EST. CONSTRUCTION COST $217,407.50 DESIGN SERVICES @ 8% $17,392.60 DESIGN SURVEY $0.00 CONSTRUCTION SURVEY $0.00 CONSTRUCTION ADMINISTRATION & INSPECTION @ 3% $6,522.23 $23,914.83 TOTAL ESTIMATED PROJECT COST $241,322.33 $122,790.33 $137,223.75 $86,929.65 $241,322.33 PROJECT TOTAL $588,266.06 Page 17 of 33 Page 18 of 33 Page 19 of 33 CITY OF LAKE ELSINORE 130 S. MAIN STREET LAKE ELSINORE, CA 92530 951 674 -3124 X246 HARDSCAPE / MULCH MEDIAN 1 En ineers Estimate ITEM NO. DESCRIPTION OF ITEM QUANTITY UNIT UNIT PRICE AMOUNT 1 MOBILIZATION 1 LS $3,000.00 $3,000.00 2 SWPPP 1 LS $1,500.00 $1,500.00 3 CLEARING AND GRUBBING 1 LS $2,000.00 $2,000.00 4 DUST CONTROL 1 LS $1,500.00 $1,500.00 5 TRAFFIC CONTROL 1 LS $2,500.00 $2,500.00 6 ROADWAY EXCAVATION 131 CY $40.00 $5,240.00 7 STAMPED (COLORED) MOW STRIP 12" WIDTH 2000 S.F. $8.50 $17,000.00 8 RUBBER MULCH (SUPER STACK 300 S.F. @ 4 "THICKNES 30 S.S. 800 $24,000.00 9 DECORATIVE BOULDERS 10 EA $400.00 $4,000.00 10 STRIPING /SIGNING 1 LS $1,500.00 $1,500.00 $62,240.00 15% CONSTRUCTION CONTINGENCY $9,336.00 TOTAL EST. CONSTRUCTION COST $71,576.00 DESIGN SERVICES @ 8% $5,726.08 DESIGN SURVEY $0.00 CONSTRUCTION SURVEY $0.00 CONSTRUCTION ADMINISTRATION & INSPECTION @ 3% $2,147.28 $7,873.36 TOTAL ESTIMATED PROJECT COST $79,449.36 Page 19 of 33 Page 20 of 33 CITY OF LAKE ELSINORE 130 S. MAIN STREET LAKE ELSINORE, CA 92530 951 674 -3124 X246 HARDSCAPE / MULCH MEDIAN 2 En ineers Estimate ITEM NO. DESCRIPTION OF ITEM QUANTITY UNIT UNIT PRICE AMOUNT 1 MOBILIZATION 1 LS $3,000.00 $3,000.00 2 SWPPP 1 LS $1,500.00 $1,500.00 3 CLEARING AND GRUBBING 1 LS $2,000.00 $2,000.00 4 DUST CONTROL 1 LS $1,500.00 $1,500.00 5 TRAFFIC CONTROL 1 LS $2,500.00 $2,500.00 6 ROADWAY EXCAVATION 131 CY $40.00 $5,240.00 7 STAMPED (COLORED) MOW STRIP 12" WIDTH 2100 S.F. $8.50 $17,850.00 8 RUBBER MULCH (SUPER STACK 300 S.F. @ 4 "THICKNES 33 S.S. 800 $26,400.00 9 DECORATIVE BOULDERS 10 EA $400.00 $4,000.00 10 STRIPING /SIGNING 1 LS $1,500.00 $1,500.00 $65,490.00 15% CONSTRUCTION CONTINGENCY $9,823.50 TOTAL EST. CONSTRUCTION COST $75,313.50 DESIGN SERVICES @ 8% $6,025.08 DESIGN SURVEY $0.00 CONSTRUCTION SURVEY $0.00 CONSTRUCTION ADMINISTRATION & INSPECTION @ 3% $2,259.41 $8,284.49 TOTAL ESTIMATED PROJECT COST $83,597.99 Page 20 of 33 Page 21 of 33 CITY OF LAKE ELSINORE 130 S. MAIN STREET LAKE ELSINORE, CA 92530 951 674 -3124 X246 HARDSCAPE / MULCH MEDIAN 3 En ineers Estimate ITEM NO. DESCRIPTION OF ITEM QUANTITY UNIT UNIT PRICE AMOUNT 1 MOBILIZATION 1 LS $4,000.00 $4,000.00 2 SWPPP 1 LS $1,500.00 $1,500.00 3 CLEARING AND GRUBBING 1 LS $2,000.00 $2,000.00 4 DUST CONTROL 1 LS $1,500.00 $1,500.00 5 TRAFFIC CONTROL 1 LS $2,500.00 $2,500.00 6 ROADWAY EXCAVATION 131 CY $40.00 $5,240.00 7 STAMPED (COLORED) MOW STRIP 12" WIDTH 2150 S.F. $8.50 $18,275.00 8 RUBBER MULCH (SUPER STACK 300 S.F. @ 4 "THICKNES 17 S.S. 800 $13,600.00 9 DECORATIVE BOULDERS 10 EA $400.001 $4,000.00 10 STRIPING /SIGNING 1 LS $1,500.001 $1,500.00 $54,115.00 15% CONSTRUCTION CONTINGENCY $8,117.25 TOTAL EST. CONSTRUCTION COST $62,232.25 DESIGN SERVICES @ 8% $4,978.58 DESIGN SURVEY $0.00 CONSTRUCTION SURVEY $0.00 CONSTRUCTION ADMINISTRATION & INSPECTION @ 3% $1,866.97 $6,845.55 TOTAL ESTIMATED PROJECT COST $69,077.80 Page 21 of 33 Page 22 of 33 CITY OF LAKE ELSINORE 130 S. MAIN STREET LAKE ELSINORE, CA 92530 951 674 -3124 X246 HARDSCAPE / MULCH MEDIAN 4 En ineers Estimate ITEM NO. DESCRIPTION OF ITEM QUANTITY UNIT UNIT PRICE AMOUNT 1 MOBILIZATION 1 LS $3,000.00 $3,000.00 2 SWPPP 1 LS $1,500.00 $1,500.00 3 CLEARING AND GRUBBING 1 LS $2,000.00 $2,000.00 4 DUST CONTROL 1 LS $1,500.00 $1,500.00 5 TRAFFIC CONTROL 1 LS $2,500.00 $2,500.00 6 ROADWAY EXCAVATION 131 CY $40.00 $5,240.00 7 STAMPED (COLORED) MOW STRIP 12" WIDTH 3400 S.F. $7.50 $25,500.00 8 RUBBER MULCH (SUPER STACK 300 S.F. @ 4 "THICKNES 62 S.S. 800 $49,600.00 9 DECORATIVE BOULDERS 17 EA $400.00 $6,800.00 10 STRIPING /SIGNING 1 LS $1,500.00 $1,500.00 $99,140.00 15% CONSTRUCTION CONTINGENCY $4,957.00 TOTAL EST. CONSTRUCTION COST $104,097.00 DESIGN SERVICES @ 8% $3,500.00 DESIGN SURVEY $2,000.00 CONSTRUCTION SURVEY $2,500.00 CONSTRUCTION ADMINISTRATION & INSPECTION @ 3% $1,200.00 $9,200.00 TOTAL ESTIMATED PROJECT COST $113,297.00 $79,449.36 $83,597.99 $69,077.80 $113,297.00 PROJECT TOTAL $345,422.14 Page 22 of 33 Page 23 of 33 Page 24 of 33 CITY OF LAKE ELSINORE 130 S. MAIN STREET LAKE ELSINORE, CA 92530 951 674 -3124 X246 HARDSCAPE / TREE / BUSHES MEDIAN 1 En ineers Estimate ITEM NO. DESCRIPTION OF ITEM QUANTITY UNIT UNIT PRICE AMOUNT 1 MOBILIZATION 1 LS $4,000.00 $4,000.00 2 SWPPP 1 LS $2,500.00 $2,500.00 3 CLEARING AND GRUBBING 1 LS $3,000.00 $3,000.00 4 DUST CONTROL 1 LS $3,500.00 $3,500.00 5 TRAFFIC CONTROL 1 LS $2,500.00 $2,500.00 6 12" MOW EDGING 650 S.F. $15.00 $9,750.00 7 STAMPED CONCRETE 850 S.F. $75.00 $63,750.00 8 STREET TREES SPACED @ 30 FEET O.C. 33 EA $100.00 $3,300.00 9 5 GAL BUSHES (25 PER 1000 S.F.) 270 EA $17.00 $4,590.00 10 MULCH 110 CY $40.00 $4,400.00 11 LATERAL IRRIGATION SYSTEM 3/4" SCH 40 396 LF $10.00 $3,960.00 12 STRIPING /SIGNING 1 LS $1,500.00 $1,500.00 $106,750.00 15% CONSTRUCTION CONTINGENCY $16,012.50 TOTAL EST. CONSTRUCTION COST $122,762.50 DESIGN SERVICES @ 8% $9,821.00 DESIGN SURVEY @ 2% $2,455.25 CONSTRUCTION SURVEY $0.00 CONSTRUCTION ADMINISTRATION & INSPECTION @ 3% $3,682.88 $15,959.13 TOTAL ESTIMATED PROJECT COST $138,721.63 Page 24 of 33 Page 25 of 33 CITY OF LAKE ELSINORE 130 S. MAIN STREET LAKE ELSINORE, CA 92530 951 674 -3124 X246 HARDSCAPE / TREE / BUSHES MEDIAN 2 En ineers Estimate ITEM NO. DESCRIPTION OF ITEM QUANTITY UNIT UNIT PRICE AMOUNT 1 MOBILIZATION 1 LS $4,000.00 $4,000.00 2 SWPPP 1 LS $2,500.00 $2,500.00 3 CLEARING AND GRUBBING 1 LS $3,000.00 $3,000.00 4 DUST CONTROL 1 LS $3,500.00 $3,500.00 5 TRAFFIC CONTROL 1 LS $2,500.00 $2,500.00 6 12" MOW EDGING 650 S.F. $15.00 $12,750.00 7 STAMPED CONCRETE 850 S.F. $75.00 $63,750.00 8 STREET TREES SPACED @ 30 FEET O.C. 33 EA $100.00 $3,300.00 9 5 GAL BUSHES (25 PER 1000 S.F.) 395 EA $17.00 $6,715.00 10 MULCH 120 CY $40.00 $4,800.00 11 LATERAL IRRIGATION SYSTEM 3/4" SCH 40 396 LS $10.00 $3,960.00 12 STRIPING /SIGNING 1 LS $1,500.00 $1,500.00 $112,275.00 15% CONSTRUCTION CONTINGENCY $16,841.25 TOTAL EST. CONSTRUCTION COST $129,116.25 DESIGN SERVICES @ 8% $10,329.30 DESIGN SURVEY @ 2% $2,582.33 CONSTRUCTION SURVEY $0.00 CONSTRUCTION ADMINISTRATION & INSPECTION @ 3% $3,873.49 $16,785.11 TOTAL ESTIMATED PROJECT COST $145,901.36 Page 25 of 33 Page 26 of 33 CITY OF LAKE ELSINORE 130 S. MAIN STREET LAKE ELSINORE, CA 92530 951 674 -3124 X246 HARDSCAPE / TREE / BUSHES MEDIAN 3 En ineers Estimate ITEM NO. DESCRIPTION OF ITEM QUANTITY UNIT UNIT PRICE AMOUNT 1 MOBILIZATION 1 LS $4,000.00 $4,000.00 2 SWPPP 1 LS $2,500.00 $2,500.00 3 CLEARING AND GRUBBING 1 LS $3,000.00 $3,000.00 4 DUST CONTROL 1 LS $3,500.00 $3,500.00 5 TRAFFIC CONTROL 1 LS $10.00 $6,500.00 6 12" MOW EDGING 650 S.F. $15.00 $12,750.00 7 STAMPED CONCRETE 850 S.F. $75.00 $63,750.00 8 STREET TREES SPACED @ 30 FEET O.C. 32 EA $100.00 $3,200.00 9 5 GAL BUSHES (25 PER 1000 S.F.) 233 EA $17.00 $3,961.00 10 MULCH 60 CY $40.00 $2,400.00 11 LATERAL IRRIGATION SYSTEM 3/4" SCH 40 384 LF $10.00 $3,840.00 12 STRIPING /SIGNING 1 LS $1,500.00 $1,500.00 $110,901.00 15% CONSTRUCTION CONTINGENCY $5,545.05 TOTAL EST. CONSTRUCTION COST $116,446.05 DESIGN SERVICES @ 8% $9,315.68 DESIGN SURVEY @ 2% $2,328.92 CONSTRUCTION SURVEY $0.00 CONSTRUCTION ADMINISTRATION & INSPECTION @ 3% $3,493.38 $15,137.99 TOTAL ESTIMATED PROJECT COST $131,584.04 Page 26 of 33 Page 27 of 33 CITY OF LAKE ELSINORE 130 S. MAIN STREET LAKE ELSINORE, CA 92530 951 674 -3124 X246 HARDSCAPE / TREE / BUSHES MEDIAN 4 En ineers Estimate ITEM NO. DESCRIPTION OF ITEM QUANTITY UNIT UNIT PRICE AMOUNT 1 MOBILIZATION 1 LS $4,000.00 $4,000.00 2 SWPPP 1 LS $2,500.00 $2,500.00 3 CLEARING AND GRUBBING 1 LS $3,000.00 $3,000.00 4 DUST CONTROL 1 LS $3,500.00 $3,500.00 5 TRAFFIC CONTROL 1 LS $10.00 $6,500.00 6 12" MOW EDGING 650 S.F. $15.00 $12,750.00 7 STAMPED CONCRETE 850 S.F. $75.00 $63,750.00 8 STREET TREES SPACED @ 30 FEET O.C. 56 EA $100.00 $5,600.00 9 5 GAL BUSHES (25 PER 1000 S.F.) 550 EA $4.50 $2,475.00 10 MULCH 250 CY $40.00 $10,000.00 11 LATERAL IRRIGATION SYSTEM 3/4" SCH 40 672 LS $10.00 $6,720.00 12 STRIPING /SIGNING 1 LS $1,500.00 $1,500.00 $122,295.00 15% CONSTRUCTION CONTINGENCY $18,344.25 TOTAL EST. CONSTRUCTION COST $140,639.25 DESIGN SERVICES @ 8% $11,251.14 DESIGN SURVEY @ 2% $2,812.79 CONSTRUCTION SURVEY $0.00 CONSTRUCTION ADMINISTRATION $ INSPECTION @ 3% $4,219.18 $18,283.10 TOTAL ESTIMATED COST $158,922.35 $82,110.00 $138,721.63 $145,901.36 $131,584.04 $158,922.35 PROJECT COST $657,239.38 Page 27 of 33 Page 28 of 33 CITY OF LAKE ELSINORE 130 S. MAIN STREET LAKE ELSINORE, CA 92530 (951) 674 -3124 X246 IRRIGATION COSTI $82,110.00 Page 29 of 33 IRRIGATION MAIN 5Y5TCM ITEM NO. IDESCRIPTION OF ITEM IQUANTITY I UNIT I UNIT PRICE JAMOUN T 1 HOT TAP EXISTING WATER MAIN 1 EA $12,000.00 $12,000.00 2 POWER 1 EA $6,000.00 $6,000.00 3 BACK FLOW DEVICE 1 EA $5,400.00 $5,400.00 4 RAINMASTER CONTROLLER ASSEMBLY 1 EA $10,000.00 $10,000.00 5 MAIN LINE " CL -315 SCHEDULE 80 4900 LF $6.10 $29,890.00 6 CONTROL WIRING #12 COMMON 4600 LF $0.50 $2,300.00 7 BORING SLEEVE - WIRING / IRRIGATION PIPE 3" 400 LF $7.50 $3,000.00 8 ELECTRICAL CONDUIT 2' 450 LF $5.60 $2,520.00 9 CONTINGENCY 1 LS $11,000.00 $11,000.00 IRRIGATION COSTI $82,110.00 Page 29 of 33 TOTAL ESTIMATED PROJECT COST $82,021 Page 30 of 33 CITY OF LAKE ELSINORE 130 S. MAIN STREET LAKE ELSINORE, CA 92530 951 674 -3124 X246 HARDSCAPE / TREE / MEDIAN 1 En ineers Estimate ITEM NO. DESCRIPTION OF ITEM QUANTITY UNIT UNIT PRICE AMOUNT 1 MOBILIZATION 1 LS $4,000.00 $4,000.00 2 3 SWPPP CLEARING AND GRUBBING 1 LS $1,500.00 $1,500.00 4 DUST CONTROL 1 LS $3,000.00 $3,000.00 5 TRAFFIC CONTROL 1 1 LS $2,500.00 $2,500.00 6 ROADWAY EXCAVATION 131 LS CY $2,500.00 $40.00 $2,500.00 $5,240.00 7 STAMPED (COLORED) MOW STRIP 12" WIDTH 3400 S.F. $7.50 $25,500.00 8 MULCH 110 CY 40 $4,400.00 9 24" BOX TREES @ 30' O.C. 33 EA $300.00 $9,900.00 10 LATERAL IRRIGATION SYSTEM 3/4" SCH 40 396 LF $5.00 $1,980.00 11 STRIPING /SIGNING 1 LS $1,500.00 $1,500.00 $62,020.00 15% CONSTRUCTION CONTINGENCY $9,303.00 TOTAL EST. CONSTRUCTION COST $71,323.00 DESIGN SERVICES @ 10% $7,132.30 DESIGN SURVEY @ 2% $1,426.46 CONSTRUCTION SURVEY $0.00 CONSTRUCTION ADMINISTRATION & INSPECTION @ 3% $2,139.69 $10,698.45 TOTAL ESTIMATED PROJECT COST $82,021 Page 30 of 33 Page 31 of 33 CITY OF LAKE ELSINORE 130 S. MAIN STREET LAKE ELSINORE, CA 92530 951 674 -3124 X246 HARDSCAPE / TREE / MEDIAN 2 En ineers Estimate ITEM NO. DESCRIPTION OF ITEM QUANTITY UNIT UNIT PRICE AMOUNT 1 MOBILIZATION 1 LS $4,000.00 $4,000.00 2 SWPPP 1 LS $1,500.00 $1,500.00 3 CLEARING AND GRUBBING 1 LS $3,000.00 $3,000.00 4 DUST CONTROL 1 LS $2,500.00 $2,500.00 5 TRAFFIC CONTROL 1 LS $2,500.00 $2,500.00 6 ROADWAY EXCAVATION 131 CY $40.00 $5,240.00 7 STAMPED (COLORED) MOW STRIP 12" WIDTH 3400 S.F. $7.50 $25,500.00 8 MULCH 120 CY 40 $4,800.00 9 24" BOX TREES @ 30' O.C. 33 EA $300.00 $9,900.00 10 LATERAL IRRIGATION SYSTEM 3/4" SCH 40 396 LF $5.00 $1,980.00 11 STRIPING /SIGNING 1 LS $1,500.00 $1,500.00 $62,420.00 15% CONSTRUCTION CONTINGENCY $9,363.00 TOTAL EST. CONSTRUCTION COST $71,783.00 DESIGN SERVICES @ 10% $7,178.30 DESIGN SURVEY @ 2% $1,435.66 CONSTRUCTION SURVEY $0.00 CONSTRUCTION ADMINISTRATION & INSPECTION @ 3% $2,153.49 $10,767.45 TOTAL ESTIMATED PROJECT COST $82,550.45 Page 31 of 33 Page 32 of 33 CITY OF LAKE ELSINORE 130 S. MAIN STREET LAKE ELSINORE, CA 92530 951 674 -3124 X246 HARDSCAPE / TREE / MEDIAN 3 En inee rs Estimate ITEM NO. DESCRIPTION OF ITEM QUANTITY UNIT UNIT PRICE AMOUNT 1 2 MOBILIZATION SWPPP 1 LS $4,000.00 $4,000.00 3 CLEARING AND GRUBBING 1 1 LS $1,500.00 $1,500.00 4 DUST CONTROL LS $3,000.00 $3,000.00 5 TRAFFIC CONTROL 1 LS $2,500.00 $2,500.00 6 ROADWAY EXCAVATION 1 131 LS CY $2,500.00 $40.00 $2,500.00 $5,240.00 7 RELOCATE PALM TREES 7 EA $1,600.00 $11,200.00 8 STAMPED (COLORED) MOW STRIP 12" WIDTH 3400 S.F. $7.50 $25,500.00 9 MULCH 60 CY 40 $2,400.00 10 24" BOX TREES @ 30' O.C. 32 EA $300.00 $9,600.00 11 LATERAL IRRIGATION SYSTEM 3/4" SCH 40 384 LF $5.00 $1,920.00 12 STRIPING /SIGNING 1 LS $1,500.00 $1,500.00 $70,860.00 15% CONSTRUCTION CONTINGENCY $10,629.00 TOTAL EST. CONSTRUCTION COST $81,489.00 DESIGN SERVICES @ 10% $8,148.90 DESIGN SURVEY @ 2% $1,629.78 CONSTRUCTION SURVEY $0.00 CONSTRUCTION ADMINISTRATION & INSPECTION @ 3% $1,200.00 $10,978.68 TOTAL ESTIMATED PROJECT COST $92,467.68 Page 32 of 33 NO 1 2 3 4 5 6 7 8 9 10 11 CITY OF LAKE ELSINORE 130 S. MAIN STREET LAKE ELSINORE, CA 92530 (951) 674 -3124 X246 / TREE / MEDIAN 4 DESCRIPTION OF ITEM MOBILIZATION SWPPP CLEARING AND GRUBBING DUST CONTROL TRAFFIC CONTROL ROADWAY EXCAVATION STAMPED (COLORED) MOW STRIP 12" WIDTH MULCH 24" BOX TREES @ 30' O.C. LATERAL IRRIGATION SYSTEM 3/4" SCH 40 STRIPING /SIGNING 15% CONSTRUCTION CONTINGENCY TOTAL EST. CONSTRUCTION COST DESIGN SERVICES @ 8% DESIGN SURVEY @ 2% CONSTRUCTION SURVEY CONSTRUCTION ADMINISTRATION & INSPECTION @ 3% TOTAL ESTIMATED PROJECT COST $11,430 $7,010.40 $1,752.60 $0.00 $2,628.90 $11,391.90 $99,021.90 $82,110.00 $82,021.45 $82,550.45 $92,467.68 $99,021.90 PROJECT COST $438,171.48 Page 33 of 33 En ineers Estimate QUANTITY UNIT UNIT PRICE AMOUNT 1 LS $4,000.00 $4,000.00 1 LS $1,500.00 $1,500.00 1 LS $3,000.00 $3,000.00 1 LS $2,500.00 $2,500.00 1 LS $2,500.00 $2,500.00 131 CY $40.00 $5,240.00 3400 S.F. $7.50 $25,500.00 250 CY 40 $10,000.00 57 EA $300.00 $17,100.00 672 LF $5.00 $3,360.00 1 1 LS $1,500.00 $1,500.00 TOTAL EST. CONSTRUCTION COST DESIGN SERVICES @ 8% DESIGN SURVEY @ 2% CONSTRUCTION SURVEY CONSTRUCTION ADMINISTRATION & INSPECTION @ 3% TOTAL ESTIMATED PROJECT COST $11,430 $7,010.40 $1,752.60 $0.00 $2,628.90 $11,391.90 $99,021.90 $82,110.00 $82,021.45 $82,550.45 $92,467.68 $99,021.90 PROJECT COST $438,171.48 Page 33 of 33