Loading...
HomeMy WebLinkAboutCity Council Meeting 1/24/2012 - Agenda Item 10- Notice of Compl. Historic Downtown Riverwalk In-Pavement Crosswalk CITY LAKE LSINOI E DREAM EXTREME, REPORT TO CITY COUNCIL TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: ROBERT A. BRADY CITY MANAGER DATE: JANUARY 24, 2012 SUBJECT: NOTICE OF COMPLETION HISTORIC DOWNTOWN RIVERWALK IN- PAVEMENT CROSSWALK LIGHTS AT CHANEY STREET PROJECT NO. 4329-2 Background In late 2010 into 2011the City sponsored the construction of the Riverwalk Project which provided a multi -use trail from the lake to the end of the outflow channel at Riverside Drive. Due to the amount of traffic on Chaney Street, staff wanted a more clear method to alert drivers that pedestrians /bicyclers were crossing the street. After performing research, the Traffic Engineer evaluated that due to the nature of the crosswalk at this location that it would be a good candidate for "In- Pavement Crosswalk Lights ". This is a push button triggered system that activate flashing LED lights constructed in the pavement across Chaney Street. Discussion On August 23, 2011, City Council awarded the construction contract to Luna Pacific Construction. Luna Pacific Construction completed the contract work on December 15, 2011, in conformance with the approved plans and specifications. There were no contract change orders on this project. Fiscal Impact The Historic Downtown Riverwalk Project extending from Lake Elsinore to Riverside Drive was funded in the amount of $800,000 with Proposition 50 and Gas Tax funds. AGENDA ITEM NO. 10 Page 1 of 4 Page 2 Notice of Completion January 24, 2012 Funding for the in- pavement lighted crosswalk: Community Services Grant (Fund 108 -4510) $ 5,357.00 Gas Tax Fund 110 $ 34,064.00 Project Budget $ 39,421.00 The following is the breakdown of expenditures for the complete Historic Downtown Riverwalk Project. Planning / Design $ 3,130.00 Professional, Technical & Other Services $ 83,782.00 Vance Corporation (Riverwalk Const.) $644,752.00 Inspection and Contract Administration $ 47,531.00 Luna Pacific Const.(In Pavement Lights Const.) $ 39,421.00 Construction Project Manager $ 4,786.00 Total $827,564.00 Recommendations 1. Accept the improvements into the City Maintained System. 2. File the Notice of Completion with the County Recorder 3. Release all retention monies 35 day after the filing of the Notice of Completion Prepared by: Peter Ramey Project Engineer Ken Seumalo 0 Director of Public Works Approved by: Robert A. Brady City Manager '; Attachments: Vicinity Map Notice of completion Page 2 of 4 VICINITY MAP FLASHING IN- PAVEMENT CROSSWALK MARKERS CITY OF LAKE ELSINORE t • 0 Gi, PROJECT SITE c F / \ o y -94, ti / � e/A :� G \ , OU TLET CHANNEL 5 4 1 co � FvlV c , �� J co ! F *s Page 3 of 4 RECORDING REQUESTED BY AND WHEN RECORDED MAIL TO: Name City of Lake Elsinore Street Address 130 S. Main Street Sta Lake Elsinore State S R U PAGE SIZE DA MISC LONG RFD COPY CA 92530 M A L 465 426 PCOR NCOR SMF NCHG EXAM 1 T: CTY UNI SPACE ABOVE THIS LINE FOR RECORDER'S USE ONLY NOTICE OF COMPLETION Notice is hereby given that: 1. The undersigned is owner or corporate officer of the owner of the interest or estate stated below in the property hereinafter described: 2. The full name of the owner is City of Lake elsinore 3. The full address of the owner is 130 South main Street 4. The nature of the int rest or estate f"the owner is in fee. work within the City owned Right of Way (If other than fee, spike In Fee" and insert, for example, "purchaser under contract of purchase." or "lessee ") 5. The full names and full addresses of all persons, if any, who hold title with the undersigned as joint tenants or as tenants in common are: NAMES ADDRESSES 6. A work of improvement on the property hereinafter described was completed on 01/24/2012 . The work done was: In- Pavement lighted crosswalk 7. The name of the contractor, if any, for such work of improvement was Luna Pacific Construction 30940 Sarabia Street Lake Elsinore. CA 92530 (If no contractor for work of improvement as a whole, insert 'none') (Date of Contract) 8. The property on which said work of improvement was completed is in the city of Lake Elsinore County of Riverside , State of California and is described as follows: In- Pavement lighted crosswalk on Channey Street. 9. The street address of said property is Not Applicable (If no street address has been officially assigned, insert "none") Dated: 01/24/2012 Signature of owner of corporate officer of owner City Clerk, ei tro ° `taYce Elsinore VERIFICATION 1, the undersigned, say: I am the Director of Oublic Works /City Engineer the declarant of the foregoing ("President of," "Manager of; "A partner of," "Owner o f , " notice of completion; I have read said notice of completion and the contents thereof; the same is true of my own knowledge. I declare under penalty of perjury that the foregoing is true and correct. Executed on January 17 , 20 12 , at Lake Elsinore , California. (Date of signature) (City where signed) (Personal signature of the individual who is swearing that the contents of the notice of completion are true) Page 4 of 4