PUBLIC COMMENTS —3 MINUTES
(Please read & complete a Speaker's Form at the Podium, prior to the Start of the City
Council Study Session.)
DISCUSSION ITEM
A. Capital Improvement Budget Review for 2008/2009 to 2012/2013.
ADJOURNMENT
The Lake Elsinore City Council/Redevelopment Agency will adjourn to a regular
meeting to be held on Tuesday, January 22, 2008, at 5:00 p.m. to be held in the
Cultural Center located at 183 N. Main Street, Lake Elsinore, CA 92530.
AFFIDAVIT OF POSTING
I, VIVIAN M. MUNSON, City Clerk of the City of Lake Elsinor , do hereby affirm that a
copy of the foregoing agenda was posted at City Hall, 72 ours in advance of this
me g.
L
VIVIAN M. MUNSON bATE
CITY CLERK
P'N \
CITY OF LAKE ELSINORE
CAPITAL IMPROVEMENT PROGRAM
Table of Contents
Summary of Available Funding 2008 to 2013
Funding Source Summary. 200712008, ' 0 8 110 9 , '091'10, '10/'11, '111'12 &, '121'13 2 - 7
Lake and Aquatic Resourses Capital Projects: 9
LKE -0001
Lake Department Headquarters & Maintenance Yard
10
LKE -0002
Boat Launch Improvements
11
LKE -0005
Shoreline Safety Plan
12
LKE -0006
Diffused Aeration System
13
LKE -0007
Wetlands & Riparian Enhancement Project
14
Park and Recreation Capital Projects: 15
PRK - 0005
Senior Center Expansion Annex Building
16
PRK - 0006
Lake Community Center Renovation
17
PRK - 0007
Senior Center Expansion
18
PRK - 0014
Tuscany Hills Park Ball Field Light Replacement
19
PRK - 0017
Machado Park Restroom Replacement
20
PRK - 0018
McVicker Park Play Equipment Replacement
21
PRK - 0019
Summerlake Park Play Equipment Replacement
22
PRK - 0020
Serenity Park Restroom.
23
PRK - 0021
Lincoln Park Restroom replacement.
24
PRK - 0022
Parks - Parking Lot Maintenance
25
Street Improvement Capital Projects: 27
STR -0002 Annual Curb, Gutter and Sidewalk Repair Program
28
STR -0004
Pavement Management Program
29
STR -0007
Annual Traffic Striping Maintenance
30
STR -0019
Railroad Canyon Road Slope Repair
31
STR -0022
Roadway Construction - Sunswept Drive
32
STR -0025
Roadway Re- construction - Dexter Avenue: Lowes to Camino Del Norte
33
STR -0027
Pine Street - Realignment & Paving
34
STR -0028
Malaga Road Median Modification
35
Traffic Capital Projects: 37
TRF -0011
1 -15 /Railroad Canyon Road Project Report
38
TRF -0012
SR- 74/1 -15 Interchange Interim Improvements
39
TRF -0014
SR- 74/1 -15 Project Report
40
TRF -0015
1 -15/ Railroad Canyon Road Interchange Improvements
41
TRF -0016
SR- 74/1 -15 Interchange (TUMF)
42
TRF -0017
Traffic Signal Coordination
43
TRF -0018
Traffic Signal Upgrade
44
TRF -0019
Traffic Signal Management
45
CITY OF LAKE ELSINORE
CAPITAL IMPROVEMENT PROGRAM
Table of Contents
Completed, Deleted or Held Projects 81
Lake and Aquatic Resources Projects:
LKE -0003 Elm Grove Beach Rehabilitation -Phase 1 82
Park and Recreation Capital Projects: 83
PRK - 0001
Park & Trails Master Plan
83
PRK - 0004
City Park Play Equipment Replacement
83
PRK - 0010
Construction of Park Security Gates
83
PRK-0013
Lakepoint Park Conversion Project
83
PRK - 0015
Lakepoint Park Play Equipment Replacement
83
PRK - 0016
Tuscany Hills Park Play Equipment Replacement
83
Street Improvement Capital Projects: 84
STR -0013 Franklin Street Overlay 84
STR -0026 Sidewalk Construction - Various Locations 84
General City Capital Projects: 85
GEN - 0002
IT Renovation/ Server Racks (Formerly GEN -0013)
85
GEN - 0010
Click2Gov Server Purchase
85
GEN - 0011
Document Management System (DMS) Pilot
85
GEN - 0015
HTE /GIS Integration (aka Looking GlassTm)
85
GEN - 0019
City Yard Locker Room /Restroom Expansion
85
GEN - 0024
Alberhill Ranch Community Center
85
GEN - 0028
Digital Surveillance Pilot Project (anti - graffiti)
85
GEN - 0037
Storage Area Network Upgrade (SANS)
85
CITY OF LAKE ELSINORE
CAPITAL IMPROVEMENT PROGRAM
Table of Contents
Tragic Capital Projects: 125
U.TRF.0001
Traffic Signal Installation, Main St. at Lakeshore Dr.
126
U.TRF.0002
Terra Cotta Road Street Closure.
127
U.TRF.0003
Traffic Signal Installation, Main St. at Graham Ave.
128
U.TRF.0004
Traffic Signal Installation, Grand Ave. at Macy St.
129
U.TRF.0005
Traffic Signal Installation, Grand Ave. at Riverside Dr.
130
U.TRF.0006
Traffic Signal Installation, Summerhill Ave. at La Strada
131
U.TRF.0007
Traffic Signal Installation, Spring St. at Graham Ave.
132
U.TRF.0008
Traffic Signal Installation, Gunnerson Ave. at Riverside St.
133
U.TRF.0009
Traffic Safety for Schools
134
Drainage Improvement Capital Projects: 135
U.DRN.0002
Mill Street/Avenue 6 Storm Drain Improvements.
136
U.DRN.0003
Library Street Drainage Improvement
137
U.DRN.0005
Drainage improvement at East Hill Street
138
U.DRN.0006
Drainage imp. adjacent to the elemtry. school on Mill St near Ave 6
139
U.DRN.0007
Drain. imp. on Lakeshore Dr. - San Jacinto River Bridge & High St
140
O
f.
M
O
m
m
N
N
W
W
A
m
A
m
M
O
m
N
O
N
N
A
M
O
N
O
0
m
O
O
N
N
m
M
m
O
O
N
O
m
r
m
N
O
m
O
N
m
w
n
m
N
N
n
"
W
r
N
S
N
m
m
Qi
N
N
M
^
n
N
�
N
<
O
a
N
S
w
n
n
N
N
N
N
Oi
0
m
tp
N
V
m
N
O
O
O
w
C
N
N
N
O
m
L
Q d)
N
fm+1
O
n
N
O
N
S
M
O
Y
N
M
<
O
V
N
n
V
O
?
N
M
N
O
O
N
N
N
N
Cli
<o
m
cq
Id
id
V
m
M
sd
,
<n+l
,A,
f fA
r
fri
C p
LL
C j
M
w
N
m
w
N
O
Oi
O
W
O
m
O
fD
O
M
O
M
O
N
O
N O
N
O
O
O
O
O
O
f a
O
m
O
m
m
v
N
a
N
N
N
N
w
of
r
rn
r
r
O
O
O
O
O
N
O
N
G a Q 7
w
N
'
'
W
O
O
w
N
w
W
W
;
a
(Ny
cV
N
N
N
0
n
n
n
c4
S
vi E a
o
M
,
m
m
m
o
o
o
e
m
o
o
m
W
o
S
0
S
o
S
m
W
o
C
m
W
V
w
m
.-
N V C
m
n
N
M
ry
N
N
O
Q'
N Y
N IL
y
LL
Iq
O
a
m
O
M
O
to
OOf
rn
N
N
m
w
C
N
o
'
N
w
O
cV
o
'
b
w
N
C
o
w
m
o
0
N
C
ih L"
N
m
V)
O
o c
ch
O
c o
O
N
OJ
O
O o
m
O
o o
O
N
M
V
O
o O
O
o o
O
N
m
O
o
0
O
0
c
N
O
o
0
O
o
0
N
O
o
0
N
M
C
D
N d
N
N
W
M
N
m
m
N
N
GO
O
W
m
O
N
t0
m
m
ID
A
N
0
N
.�.
N 6
N
Iq
O
O
O
O
N
O
O
O
O
N
N
M
O
O
O
V
O
O
O
O
N
N
M
O
O
O
V
O
O
O
N
IA
m
O
N
O
O
O
O
O
O
N
N
IA
n
O
O
O
V
O
O
O
N
N
h
1
p
O
O
N
h
V
Q
Q
p
N
O
N
n
O
O
n
O
O
A
O
O
N
C
�
O
N
m
O
O
m
O
S
c
S
n
O
O
'
A
O
ct
'
yAy
m
A�
q
N
O
ct
.O
N
M
m
N
W
N
O
V
tp
p
O
cp
O
<O
cp
N
cp
cp
CE
W
m
N
c
n
tp
c0
A
cD
n
A
G•
LL
°m
o°
w
m
°o
°o
o
m
m
(�
N IL
p �
cV
O
N
cD
O
cG
cG
O
Ic
tC
CL
O
cp
o
O
cp
N
m
N
O
N
P%
7
m
O
h
pOp
W
ONl
I(i
W
m
t0
S
n
t`
Opf
c pD
qI
o $f
N I
N
a
�
°o
m
a
ci
v
M
y
ai
y
M
v
ri
v
of
ml
O
O
N
N
a
a
0
V
OD cn V
V
m
O
O
O
O
m
N
m
m
O
O
O
O
O
O
O
N
w
m
O
O
N
W
O
O
m
O
O
O
m
O
O
O
m
O
JN
N
A
U m
N
W
n
O
O
O
O
W
N
W
W
O
O
N
O
O
m
N
w
m
O
O
S
O
O
y0
of
ap
O
0
M
O
O
o
S
N
W
aw
O
O
o
S
N
W
w
O
O
O
o
S
N
W
W
S
f7
m d LL
M
rp
O
C
�
OD
M
c
O
cn
oo
m
S
O
in
S
m
S
m
n
�i
W
.o
•ri
�
e
w
m
a
M
0
Oi
0
o
N
0
o
O
0
N
O
0
v
0
o
O
$
W
0
v
0
o
m
M
0
a
0
o
0
n
0
<
0
o
0
0
v
0
o
0
.n
R
/- ca
My
A
N
n
N
N
n
O
N
N
my
m
n
O
N
O
v
N
O
N
tp
N
N
n
O
N
y
N
O
O
M
N
n
O
O
A
O
O
A
O
O
A
O
O
n
O
O
'-
n
N
y
�
'
�
m
N
w
N
m
O
N
O
O
O
N
N
m
N
m
O
<
O
N
N
m
V
N
O
W
N
O
N
N
c0
m
N
O
W
N
O
M
N
m
N
M
O
N
O
m
m
M
N
�
�
N
cV
cV
m
tG
N
N
tM
x
,0
q
w
0
<O
o
o
o
m
a
m
M
O
n
o
n
N
o
0
o
o
0
0
N
n
0
O
o
0
0
O
o
0
o
N
n
0
r
N
o
0
o
N
o
0
o
N
A
o
n
N
o
O
o
c7
o
o
o
W
N
r
0
n
N
at
o
0
o
m
c7
o
c
o
A
N
n
0
n
m
n
4
d
m
d
m
g
m
d
m
y
�'
m
m
a
m
m
ul
a
c
a
c
m
ul
a
c
c
m
c
•
�
e
c
m
�
c
c
m
n
v
u
_y
c
m
4
qq
m
a
ry
m
4
m
LL
M
n
A
n
O
ro
O
O
W
O
w
O
W
O
O
O
O
N
N
N
0 P I NI
w ^ e 8 S
> M
y1 ,v°j O
C D
C
4
0
g I o
0
of O N ^
4L N 001 N a°G
Lq N N
d ry
J
N •0D
\ N
m
H � �
G ° M tD
.y M
� N 8 b 001 P N
5 pp
O0 0 ••• I� pO �t+p1
O 1/0) n S O O� N S S S 1011 .-i O o
1;,l V $ ^ P T b ^
C N N
f0 =
.E Y! n CL
FD
y a m a 4 EL° ; S 5 Yn E c m r
eE w n z g o U r N
W C7 = Q w 0 in v< CC 8„ g e m qyp g 8 p
N s ® � E � f � ]p � a y .SO a y � 3
,� c c y, lni lai fqr y
12j'
c U E a .Inn d g E Y w t
AT
o o d` a m
LL NO P P P P P P P P P 0• P P P P P P P P P P P ON' T T ? T P V T C ? P T P ? P T Q
a
sssssssssssss
0 Q
Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z
U N a ' 'S '' a s a a t a 0 0 0 0 iv '01 U, 0,
•
N
S
1011
P
P
S
1fl
S
.per•,
M
O
u°i
O
V
b
01n
m
ITI
P
WP
nl
C
d
ep
pO
O
N
,O
P N
P
O
O
10+1
•N-�
O
N
O
P
M
I
phi
O
��
0 P I NI
w ^ e 8 S
> M
y1 ,v°j O
C D
C
4
0
g I o
0
of O N ^
4L N 001 N a°G
Lq N N
d ry
J
N •0D
\ N
m
H � �
G ° M tD
.y M
� N 8 b 001 P N
5 pp
O0 0 ••• I� pO �t+p1
O 1/0) n S O O� N S S S 1011 .-i O o
1;,l V $ ^ P T b ^
C N N
f0 =
.E Y! n CL
FD
y a m a 4 EL° ; S 5 Yn E c m r
eE w n z g o U r N
W C7 = Q w 0 in v< CC 8„ g e m qyp g 8 p
N s ® � E � f � ]p � a y .SO a y � 3
,� c c y, lni lai fqr y
12j'
c U E a .Inn d g E Y w t
AT
o o d` a m
LL NO P P P P P P P P P 0• P P P P P P P P P P P ON' T T ? T P V T C ? P T P ? P T Q
a
sssssssssssss
0 Q
Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z
U N a ' 'S '' a s a a t a 0 0 0 0 iv '01 U, 0,
8
IIId'� 111111 ''111 11111I951I
y
O
S 00
Oo
Oo
W
O
1
Ul
S
S^
o^
o$
S
�
g
o
S
J
0
LU
41
O
O
O
aD
,O
O
S
E
O
O
O
O
O
O
S
O
S
O
S
O
O
o
IA
00
O
O
o
n
S
O
N
a
nJJ
w
W
E
G
0
1�
pO
N Of
1°l/
f+O1
o
N
O
oO
CG
N
N
O
O
O
N
1Olf
IOA
1O/1
1011
N
pO
ttP�
,O
g
a
o
V)
Of�
.N
F
1\
N
d3
�o
L
iL
E
v
J3
a°
w
p
y
1011
O
�pp
1(O�
La
a
c
�
M
s
0
C.
.y[q1
A
N
] Q
d
LU
V
1p
J
UL
IL
�-
W
CO
IIId'� 111111 ''111 11111I951I
y
O
S 00
Oo
Oo
W
O
1
Ul
S
S^
o^
o$
S
�
g
o
S
J
0
LU
41
O
O
O
aD
,O
O
S
E
O
O
O
O
O
O
S
O
S
O
S
O
O
o
IA
00
O
O
o
n
S
O
N
a
nJJ
w
W
E
G
0
1�
pO
N Of
1°l/
f+O1
N
N
O
oO
CG
N
N
O
O
O
N
1Olf
IOA
1O/1
1011
N
pO
ttP�
,O
1!1
o
V)
Of�
F
1\
N
d3
�o
L
iL
E
v
J3
a°
w
p
y
1011
O
pO
1(O�
La
a
IIId'� 111111 ''111 11111I951I
I'I1��11 =1111111^ 111111111I1111111111� ^1!'0
I I i I �!�: '.1111111E I° '111 111111 III
O
O
------------------
W
O
1
Ul
Q
�
E
I'I1��11 =1111111^ 111111111I1111111111� ^1!'0
I I i I �!�: '.1111111E I° '111 111111 III
O
O
------------------
W
O
Ul
Q
�
E
J
LU
41
��ppa
O
g$
E
S
O
S
E
O
O
O
O
O
S
O
S
O
S
O
M
O
O
O
n
S
O
N
a
O
w
W
E
CC
0
1�
pO
N Of
1°l/
f+O1
N
N
O
oO
CG
N
N
O
O
O
N
1Olf
IOA
1O/1
1011
N
,?
o
V)
F
1\
d3
�o
L
iL
E
v
J3
a°
w
p
y
1011
O
pO
1(O�
La
c
�
M
s
0
C.
.y[q1
A
N
] Q
d
LU
V
1p
J
UL
IL
�-
W
CO
NNJ
O
I'I1��11 =1111111^ 111111111I1111111111� ^1!'0
I I i I �!�: '.1111111E I° '111 111111 III
.s
0
O
O
O
W
O
Ul
Q
�
E
J
LU
41
��ppa
O
g$
E
S
O
S
E
O
O
O
O
O
S
O
S
O
S
O
M
O
O
O
n
S
O
N
a
O
w
W
E
CC
0
1�
pO
N Of
1°l/
f+O1
N
N
O
oO
CG
N
N
O
O
O
N
1Olf
IOA
1O/1
1011
N
,?
o
V)
F
1\
d3
�o
L
iL
E
v
J3
a°
w
p
y
1011
O
pO
1(O�
La
c
�
M
s
0
C.
.y[q1
A
N
] Q
d
LU
V
1p
J
UL
IL
�-
W
CO
.s
0
�
H
W
Ul
Q
�
E
J
LU
41
g$
E
s`
E
.a
E
N=
Q
O
�Q5
W
N
a
S
w
W
E
CC
0
a
s
,?
o
V)
6
o
d3
�o
L
iL
E
v
J3
a°
w
p
y
W
La
c
�
s
0
C.
.y[q1
A
N
] Q
d
LU
V
1p
J
UL
IL
�-
W
75
U
NNJ
O
cl
Z
R Intel
n
p
OJ
] C7
C7
C7
7
d
W
n
t7
C7
l7
UW'
LLO
N
a
0
O
Z
co
W
Q
O
O
O
O
O
O
O
O
U
"o
yO4
00
O
O
S
O Q
�
H
W
Ul
Q
�
E
J
a
�
a
a
a
a
S
,?
o
V)
�o
L
iL
E
J3
a°
w
p
y
La
�
s
0
.y[q1
A
N
] Q
d
6
1p
J
UL
IL
�-
W
75
U
NNJ
] C7
C7
C7
U'
C7
C7
(7
t7
C7
l7
UW'
M
Hi
x
d
0
V
c
C
c
{L
IL
lL
IL
LM
O
LL
LL
c�
0
c)
c
O
O
O
O
O
O
N
N
O
O
O
O
n
a s
O
N
O
O
O
O
O
N
M
N
N
N
L°
M
O
O
O
O
O
O
O
N
J
Ln
10
'I
O
c
CD
O
O
N
t!1
O
N
O
O
V)
M
c
C
I�
O
N
I°n
I
Ln
N
)
M�
O
U
.4
ILn
I�il
co
°o
�
v
14
O
U
u
lE
o°o
w
V 10
H y
Q
O
0
o
00
o
°o
O
°o
o
°o
m
'i
O
O
O
M
M
A
~
O
O
O C.
ON
N
ti
N
K
o
0
0
o
0
0
H
O
O
o
0
0
N
to
Ln
N
^
n
O
O
O
O
O
In
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
r%
O
O O
O
O
N
yR
O
w
O
O
C.
O
O
O
0
—
M
ti
O
Ln
N
O
9
N
n
c0
N
O
�
C
m
u
N
OO
Q
°
o
V
GYEi
a
J
=
o
a
a
{
a�i
IL
}�
A
U
f
aYi
n
x
W
y
u
u
rn
c
n
c
y
E
'gin
W
y
'C'
O
N
b
Y
m
E
m
m
c
°7
M
li
m'
aS
E
`�
°'
�
B
v
E T�
m
O
of
N
10
N
t
O.
to
W
W
d
c
LO
C
aF l4
ce
U-
E
O
N
V
�--
z
0.
d
"
m
u
v
a
n
z
LD
u=1
f
:3
a°
E
O
V
'�°
°
E
n
.1
y
N
v
O
=
.1
y
v
m
E
F
6
C
v
m
m
to
Q
as
V
m
W
a
a)
_
w=
Yd
V
a10
E`-
Y
=
a=
>
a
_
a=
o
a=
a
d-9
H
v=
a
Y
N
N
M
M
M
U.
N
a
o
d
O
Z
O
N
to
tp
O
O
O
O
O
O
O
O
O
O
O
O
O
O
N
O
.Q
Y
O
aa
O
O
pc
O
LL
4
Z
Z
Z
Z
Z
Z
Z
V
N
a
a
G
G
U�
o
0(D
Q
Hi
LO
V
N
d
c
p
c
c
O
C
p
c
c
L
LL
LL
LL
LL
LL
{A
N
lL
LL
li
C
m
C
f`O
C
(
C
C
O
O
O
O
O
O
d
O
O
O
O
l!1
N
N
L1 L
A a
N
Ln
O N
N
W
v
vi
rn
°
R
°
o
a
n
o
0
J
Y
N
O
O
IL
N
N Co
N
c
L
�
N
CD
in
tOn
N
N
V
d
In
O O
` m
rl
O
Ln
O
I
Q
O
O
O
O
O
O
O
O
O
O
O
O
V
N
N
~
O
O
000
000
471
tMA
d
a
Ln
�O
x
O
O
O
O
O
O
,
O
q
LO
N
f�
I
O
w
101O1
�)
O
O
O
O
O
O
O
O
O
O
O
Co
O
Co
O
O
O
O
O
O
O
O
O
O
O
O
O
o
O
0
O
0
O
0
O
0
O
0
O
0
O
O
o
O
LQ
n
t
N
O
n
O,
O
O
N
0
l!1
N
Ln
'V'
N
.�
m
~
Ln
ti
Oi
to
i,
O
O
E
E
d
O
a,
>
d
aci
CL
CL
a
a
o
LL
m
U
v
a�
u
=
u
rn
c
E
U)
N
O
w
p
T
CL
L°
N
14
N
N
O
d
C
N
N
O
o
��//
Iii
•^
O
LL
L°
N
w
Of
C
O.
p
T
t
07
>
Y
p
Cp
p
H
m
b
Ln
!Q
Ll
2
N
N
d
H
Z
H
d
d
a+
F
°
S
CX
12
°
`2
c
y
o
L
J
y
N
m
m
m
LU
06
`_
m
c
d
L°
c
m
z
m
Y
W
:Q
V
d
F-
¢
a
Q
..
cn
0
¢
d
a
s
`�
U
o
Y
Z
N
N_
N
In
O
Ln
N
N
N
LL
N
a`
O
\
z
N
O
n
lA
11
O
O
O
O
M
O
M
O
M
O
%0
O
O
O
O
O
O
O
co
O
O
N
V
O
N
°
�O
��
LL
u-
z
z
z
z
z
z
z
LO
0
V
N
T01
_
9
�
v
v
c
v
v
v
LL
LL
LL
LL
LL
LL
LL
LL
LL
c
c
c
c
LL
LL
LL
LL
LL
L�
N
fL0
t`0
N
N
•i
41
N
C)
G/
N
N
%a
Ol
N
N
c
N
t`O
0)
t`
N
i0
N
i
C
U
U
U
U
c
0c1
c
N
c
N
N
N
v
v
N
N
N
y
w
d
C
O
O
O
O
O
O
O
O
O
O
O
O
'p
00
LO
O
O
O
C.
O
N
O
O
O
O
O
O
O
O
O
O
O
O
O
N
Na
M
N
n
%D
00
N
V'
V'
.-r
M
M
M
N
LD
n
L
O
N
_
N
M
M
Lp
V
f
n
`
M
O
O
O
O
_
N
O
J
Ln
O
t11
Y
N
6
N
l
OI
N
N
u
IV
O
Cl
h o
°o
A m
O
� ul
O
F- h
��
.-L
Q
O
O
O
O
O O
O
O
N W
O
C
M
O
N
00
00
41
M
Ln
ti
ti
x
H
o
O O°
O
°o
o
°o
ti
o°
,y
^
o
°
Ln
N
O
O
O O
O
O O
O
O
O
O O
O
O
O
O
O
O
O
O O
O
O
O
O
10
o
O O
O
O O
O
O
O
O O
O C
O
O
O
O
O
L!1
O
n
O
O
O
O O
O
O
O
y�
O
00
00
M
LD
O
N n
O
O O
O
O
O
Ci
O
V
ti
LD
O
O
O
O
O
Ln
L!1
O O
O
p
ry
p
~
t0
00
O
00
O
N
LA
N
M
M
M
N LD
Ln
n
Lfl
M
L°O
.N-r
N
N
•--1
T
N
O
N
0
y
E
a
�`
N
+
J
>
d
c
c
c
.-.
O1
a
v
c
v
c
v
E
°J
c
Ld
y`
w
o
w
aEi
`0
a
v
c
LL
E
�.
Cl
a
m=
tii
A
c
v
>
N
y�
fY
y
C
d
E
v
7
T
'O
O
v1/1�
°1
co
a°i
?�
E
E
o
o
a
g
a`
lU
v
•i
o
tX
v
E
u
3
m
c
i
m
:°
°c'
n.
E
=
c°
u
T
C
(((AAA
ro
c
v
n
7
v
Q1
°�
`
pplf
`6
ra0
u
n�.
�..
u
U
m
j
w'
'O
C
C
_p,
Q
y
i
d
�O
{.
li
t
O
U
d
rn
N
CJ
�J
H
.2
OT1
N
W
�/
j
O
O
7
Q
T
C
C
C
d
°'
7
C
N
N
Q
V
=
E
E
rr
T
C
j
10
i�j/i
•�`1
O
LL
m
G
m
i^
C
m
W
m
o
'o
f
'°
i
a)
E
01
C
C
m
p,
.x
o
u
w't
E
7
O
w
E
U
O
a)
N
O1
°
°
m
(n
-0
°
a+
�,
y
EL
o
t
m
in
v
°�>
E
a�
a�
m°
u
E
F-
Z
a
m
(.J
c
d
o,
C
y��j
m
Cl
r-Cy
L
�)
V
yay�
i7
E
d
E Epp
Vn
i.�
tj
i
y
Q
Q
y
V
V
.r-'
O
0)
N
U
W
fl.
o
c
'c
c
U
E
Y
V
~
u
LRS
E
o-Cr
>
(0
€
'�
F-
;,j
12
V
a
H
Ln
r`0
c
c
aEi
m
c
a
c
c
E
m
m
c
a
-2
m
Y
v
o
B
y
Y
Ln
Ln
a
¢
tZ
¢
Ln
¢
a
U
rZ
a
`�
Ln
Ln
Lu
Lu
C7
U
N
p
=
.
4.
M
N
M
O
M
O
.-r
N
..�
N
N
O
1!1
O
N
N
N
U.
N
a`
Z
LO
O
C
O
w
ti
N
O
O
O
•�
O CD
V'
O
M
rq
o
M
O
v
O
Ln
O
M
O
.�
N
M
V'
LA
LO
O
O
O
O
O
O
O
0
O
O
O
O
O
O
O
O
O
Or
'O
i
r
O
O
O
O
r
r
r
r
r
r
r
r
r
O
O
O
Y
Y
Y
Y
Y
y
Q:
Li
Z
Z
Z
Z
Z
Z
Z
Z
Z
r
Z
r
Z
r
Z
r
Z
Z
a
a
a
a
a
t-
to
t-
►�-
(D�
z
0
r-
V
d
C_
V
c
c
c
U
Y.
li
li
{A
O
p
io
v
Ta
d
fa
>
v
C7
C7 D
c
d
o0
o
00
0
00
0
L7
O
o°o
0
0
V_
IA
O
O
W
O
u l
O
IA
Q
O
O
O
O
N
N
W
000
a
d
f
1x0
O
O
O
O
N
a
L
C9
0
00
00
o
O
0
0
0
0
0
0
IR
ao
c
.
o
.A
2
in
o
u
d
c
m
c
c_
a
1O
�
N
2
�
L
O
N
\
N
d
rl
N
O
L
�
►-
a
d
Y
.w
�P±
o
a+
c
CL
J
�+
■ �
C!
N
`r/1
N
J
C
�
LLJ
fl.
°
a
;o
L
7
LY
m
M
f-
r$
m
v
V
Y
o
rn
00
gM
or.4
r1l
LL
N
a`
O0
N
=
N
�n
F�y
O
O
O
N
°
w
z
z
V
r-
Five Year Capital Improvement Projects Listing 2008/2009 through 2012/2013
Lake and Aquatic Resource Projects
Project ID No.: I Project No.:J Project Title Estimated Total I Status
LKE -0001
4246
Lake Department Headquarters & Maintenance Yard
$ 300,000
LKE -0002
4237
Boat Launch Improvements
$ 7,612,000
LKE -0005
4269
Shoreline Safety Plan
$ 200,000
LKE -0006
4282
Diffused Aeration System
$ 325,000
LKE -0007
4273
Wetlands & Riparian Enhancement Project
$ 855,000
Total Lake and Aquatic Resource Projects $ 9,292,000
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.: LKE -0001
Project Number: 4246
Project Type: Lake Department Headquarters & Maintenance Yard
Description: Establish permanent Lake Department Headquarters & Maintenance Yard to coincide with LERA Campground and
Boat Launch Improvements.
Location: LERA Campground at 32040 Riverside Drive
Funding Source
105 - Concessions
Agreement
Destination RV
PITD Actual
Costs &
Encumbrances
at 3 -31 -08
$ -
Budget Avail.
at 3 -31 -08
$ 45,000
FY 2008 -2009
$ 255,000
FY 2009-
2010
FY 2010-
2011
FY 2011-
2012
FY 2012.
2013
Total
$ 300,000
Env. Permit
-
5,000
5,000
R/W
_
-
Admin
10,000
10,000
Construction Cost
1 235,0001
235,000
Continqencv
1 20,0001
20,000
Other
-
Total Funding
is -
$ 45,0001$
255,000
$ -
$ -
Is -
$ -
$ 300,000d-
Project Costs
Design
$ -
$ 30,000
$ 30,000
Env. Permit
-
5,000
5,000
R/W
_
-
Admin
10,000
10,000
Construction Cost
1 235,0001
235,000
Continqencv
1 20,0001
20,000
Other
-
Total Project Costs
$ -
$ 45,000
$ 255,000
$ -
$ -
$ -
$ -
$ 300,000
10
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.: LKE -0002
Project Number: 4237
Project Type: Boat Launch Improvements
Description: Rehabilitate the boat launch at the Lake Elsinore Recreation Area (LERA) Campground per the Feasibility
Report by Noble Consultants, Inc.
Location: LERA Campground at 32040 Riverside Drive
Funding Source
PITD Actual
Costs &
Encumbrances
at 3 -31 -08
Budget Avail.
at 3 -31 -08
FY 2008 -2009
FY 2009-
2010
FY 2010-
2011
FY 2011-
2012
FY 2012 -
2013
Total
105 - CA Dept
Boating & Waterway
$ 980,499
$ 1,519,501
$ 500,000
$3,000,000
105 - General Fund
-
175,000
1,000,000
1,000,000
105 - Proceeds from
Financing
-
1,186,000
1,186,000
221 - Parks
-
914,000
60,000
914,000
118 - DIF Fund
-
2,128,501
500,000
1,000,000
500,000
105 - Unspecified
-
1,012,000
1,012,000
Other
-
-
Total Funding
$ 980,499
$ 2,433,501
$ 3,198,000
$ -
$ -Is
-
$1,000,000
$7,612,000
Project Costs
Design
$ 450,000
$ -
$ 450,000
Env. Permit
75,000
175,000
250,000
R/W
-
Admin
-
130,000
60,000
190,000
Construction Cost
455,499
2,128,501
2,526,000
1,000,000
I 6,110,000
Contingency
-
612,000
612,000
Other
-
-
Total Project Costs
$ 980,499
$ 2,433,501
$ 3,198,000
$ -
$ -Is
-
$1,000,000
$7,612,000
11
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.: LKE -0005
Project Number: 4269
Project Type: Shoreline Safety Plan
Description: Implement recommendations from Shoreline Safety Assessment to channel visitors to controlled access points to
communicate safety information.
Location: Shoreline Property
Funding Source
PITD Actual
Costs &
Encumbrances
at 3-31-08
Budget Avail.
at 3-31-08
FY 2008-
2009
FY 2009 -
2010
FY 2010-
2011
FY 2011-
2012
FY 2012 -
2013
Total
105 - General Fund
$ 86,539
$ 13,461
$ 100,000
118 - DIF Fund
47,674
52,326
100,000
R/W
-
Admin
-
Construction Cost
134,213
50,787
185,000
Contingency
-
Other
Total Funding
$ 134,213
$ 65,787
$ -
$ -
$ -
$ -
$ -
$ 200,000
Project Costs
Design
$ -
$ 15,000
$ 15,000
Env. Permit
-
R/W
-
Admin
-
Construction Cost
134,213
50,787
185,000
Contingency
-
Other
Total Project Costs
$ 134,2131$
65,787
$ -
$ -
$ -
$ -
$ -
$ 200,000
12
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.: LKE -0006
Project Number: 4282
Project Type: Diffused Aeration System
Description: Capital Improvement Project funding allocation to EVMWD to construct LESJWA's designed
Diffused Aeration System in the Lake. The City of Lake Elsinore portion is $325,000.
Location: Lake Elsinore
Funding Source
PITD Actual
Costs &
Encumbrances
at 3 -31 -08
Budget Avail.
at 3 -31-08
FY 2008-
2009
FY 2009-
2010
FY 2010-
2011
FY 2011-
2012
FY 2012 -
2013
Total
105 - General Fund
$ 325,000
$ 325,000
Env. Permit
-
-
R/W
-
-
Admin
-
-
Construction Cost
325,000
325,000
Contingency
-
-
Other
-
Total Funding
$ 325,000
$ -
$ -
$ -
$ -
$ -
$ -
$ 325,000
Project Costs
Design
$ -
-
Env. Permit
-
-
R/W
-
-
Admin
-
-
Construction Cost
325,000
325,000
Contingency
-
-
Other
-
Total Project Costs
$ 325,000
$ -
$ -
$ -
$ -
$ -
$ -
$ 325,000
13
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.: LKE -0007
Project Number: 4273
Project Type: Wetlands & Riparian Enhancement Project
Description: Construct three (3) one acre ponds and enhance 2,000 linear feet of existing channels for the
establishment and propagation of sport fish, beneficial zooplankton and aquatic vegetation, as well
as provide public access trails and interpretive signage
Location: Existing Back -basin wetlands area.
Funding Source
PITD Actual
Costs &
Encumbrance
s at 3 -31 -08
Budget
Avail. at 3 -31-
08
FY 2008-
2009
FY 2009-
2010
FY 2010-
2011
FY 2011-
2012
FY 2012 -
2013
Total
105 - Riparian &
Riverine Habitat
Grant Project #RR -33
$ -
$ 250,000
$ 50,000
$ 300,000
105 - Prop -40
Consolidated Grants
SWRCB Grant No.
06 -179 -558 -0
77,586
477,414
555,000
R/W
-
-
Admin
6,345
98,655
105,000
Construction Cost
57,187
492,8131
1 550,000
Contingency
-
30,000
50,000
80,000
Other
-
$ 100,000
100,000
Total Funding
1 $ 77,5861
$ 727,414
1 $ 50,000
1 $ -
$ -
$ -
$ -
$ 855,000
Project Costs
Design
$ -
$ -
Env. Permit
14,054
5,946
20,000
R/W
-
-
Admin
6,345
98,655
105,000
Construction Cost
57,187
492,8131
1 550,000
Contingency
-
30,000
50,000
80,000
Other
-
$ 100,000
100,000
Total Project Costs
$ 77,586
$ 727,414
$ 50,000
$ -
$ -
$ -
$ -
$ 855,000
14
Five Year Capital Improvement Projects Listing 2008/2009 through 2012/2013
Park and Recreation Capital Projects
Project ID No.: I Project No.: I Project Title Estimated Total I Status
PRK - 0005
4284
Senior Center Expansion Annex Building
$ 38,000
PRK - 0006
4287
Lake Community Center Renovation
$ 178,500
PRK - 0007
4310
Senior Center Expansion
$ 26,000
PRK - 0014
4292
Tuscany Hills Park Ball Field Light Replacement
$ 68,000
PRK-0017
-
Machado Park Restroom Replacement
$ 120,000
PRK - 0018
-
McVicker Park Play Equipment Replacement
$ 170,000
PRK - 0019
-
Summerlake Park Play Equipment Replacement
$ 140,000
PRK - 0020
-
Serenity Park Restroom.
$ 120,000
PRK - 0021
-
Lincoln Park Restroom replacement.
$ 120,000
PRK - 0022
-
Parks - Parking Lot Maintenance
$ 80,000
Total Park and Recreation Capital Projects $ 1,060,500
15
Ongoing
Ongoing
Ongoing
Ongoing
New
New
New
New
New
New
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.: PRK - 0006
Project Number: 4287
Project Type: Lake Community Center Renovation
Description:
Expand Lobby by relocating glass front doors and removing ticket booth. Also office renovation.
Location: Lake Community Center — 310 W. Graham.
Funding Source
PITD Actual
Costs &
Encumbrances
at 3 -31-08
Budget
Avail. at 3
31 -08
FY 2008-
2009
FY 2009-
2010
FY 2010-
2011
FY 2011-
2012
FY 2012 -
2013
Total
105 - General Fund
$ 34,483
$ 51,517
$ 20,000
$106,000
150 - CDBG
-
57,500
57,500
221 - Park Fee
-
15,000
15,000
Admin
-
18,000
18,000
Construction Cost
34,483
9,517
92,500
136,500
Contingency
-
4,000
4,000
Other
-
Total Funding
$ 34,483
$ 51,517
$ -
$ 92,500
$ -
$ -
$ -
$178,500
Project Costs
Design
$ -
$ 20,000
$ 20,000
Env. Permit
-
R/W
-
Admin
-
18,000
18,000
Construction Cost
34,483
9,517
92,500
136,500
Contingency
-
4,000
4,000
Other
-
Total Project Costs
$ 34,483
$ 51,517
$ -
$ 92,500
$ -
$ -
$ -
$178,500
17
City of Lake Elsinore
FY 2008/09- 2012113 Capital Improvement Program
Project Description
Project ID No.: PRK - 0007
Project Number: 4310
Project Type: Senior Center Expansion
Description:
Expansion of Senior Center Main Building.
Location: 420 Lakeshore — adjacent to Lake Point Park.
Funding Source
PITD Actual
Costs &
Encumbrances
at 3 -31 -08
Budget
Avail. at
3 -31 -08
FY 2008-
2009
FY 2009-
2010
FY 2010-
2011
FY 2011-
2012
FY 2012 -
2013
Total
105 - General Fund
-
$ 26,000
$ (26,000)
$ 26,000
$ 26,000
Env. Permit
R/W
Admin
Construction Cost
Contingency
Other
Total Funding
$ -
$ 26,000
$ (26,000)
$ -
$ -
$ 26,000
$ -
$ 26,000
Project Costs
Design
-
$ 26,000
$ (26,000)
$ 26,000
26,000
Env. Permit
R/W
Admin
Construction Cost
Contingency
Other
Total Project Costs
$ -
$ 26,000
$ (26,000)
$ -
$ -
$ 26,000
$ -
$ 26,000
PITD= Project Inception to Date
18
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.: PRK - 0014
Project Number: 4292
Project Type: Tuscany Hills Park Ball Field Light Replacement
Description: Replace all ball field light fixtures with new more efficient lights that are shielded to minimize
spillage and improve lighting on the field. Current system is estimated to be operating at 70%
level due to age.
Location: Corner of Summerhill Drive and La Strada
Funding Source
221 - Parks
PITD Actual
Costs &
Encumbrances
at 3 -31 -08
$ -
Budget
Avail. at
3 -31 -08
$ 68,000
FY 2008-
2009
FY 2009-
2010
FY 2010 -
2011
FY 2011-
2012
FY 2012 -
2013
Total
$ 68,000
Design
$ _
Env. Permit
_
R/W
Admin
-
4,500
4,500
Construction Cost
-
57,500
57,500
Contingency
-
6,000
6,000
Total Funding
$ -
$ 68,000
Project Costs
Design
$ _
Env. Permit
_
R/W
Admin
-
4,500
4,500
Construction Cost
-
57,500
57,500
Contingency
-
6,000
6,000
Other
Total Project Costs
$ -
$ 68,000
$ -
$ -
$ -
$ -
$ -
$ 68,000
19
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.: PRK - 0018
Project Number:
Project Type: McVicker Park Play Equipment Replacement
Description: Replace outdated non - complying system with new structure. Project to include demolition of
old system and installation of 100% resilient surfacing.
Location: McVicker Park
Funding Source
150 - CDBG Fund
105 - General Fund
PITD Actual
Costs &
Encumbrances
at 3 -31 -08
$ -
-
Budget
Avail. at
3 -31 -08
FY 2008-
2009
$100,000
FY 2009-
2010
FY 2010-
2011
FY 2011-
2012
70,000
FY 2012 -
2013
Total
$ 100,000
70,000
Design
Env. Permit
-
R/W
Admin
Construction Cost
Contingency
-
100,000
70,000
170,000
_
Other
Total Funding
$ -
$ -
$100,000
$ -
$ -
$70,-0001
$ -
$ 170,000
Project Costs
Design
Env. Permit
-
R/W
Admin
Construction Cost
Contingency
-
100,000
70,000
170,000
_
Other
Total Project Costs
$
$100,000
$ -
$ -
$70,000
$ -
$ 170,000
21
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.: PRK - 0020
Project Number:
Project Type: Serenity Park Restroom.
Description: Construct new restroom facility.
Location: Serenity Park
Funding Source
PITD Actual
Costs &
Encumbrances
at 3 -31 -08
Budget
Avail. at
3 -31 -08
FY 2008-
2009
FY 2009-
2010
FY 2010-
2011
FY 2011-
2012
FY 2012 -
2013
Total
150 - CDBG
221 - Park Fee
$ -
-
$ 80,000
40,000
$ 80,000
40,000
R/W
_
Admin
Construction Cost
Contingency
Other
-
-
106,000
10,000
106,000
10,000
Total Project Costs
$ -
$ -
$120,000
$ -
$ -
$ -
$ -
$ 120,000
Total Funding
$ -
$ -
$120,000
$ -
$ -
$ -
$ -
$ 120,000
Project Costs
Design
Env. Permit
$ -
$ 4,000
$ 4,000
R/W
_
Admin
Construction Cost
Contingency
Other
-
-
106,000
10,000
106,000
10,000
Total Project Costs
$ -
$ -
$120,000
$ -
$ -
$ -
$ -
$ 120,000
23
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.: PRK - 0022
Project Number:
Project Type: Parks - Parking Lot Maintenance
Description:
Slurry seal and striping of parking lots at Summerhill, McVicker and Tuscany Hills.
Location: Various Park Locations
Funding Source
PITD Actual
Costs &
Encumbrances
at 3 -31 -08
Budget
Avail. at
3 -31 -08
FY 2008-
2009
FY 2009-
2010
FY 2010-
2011
FY 2011-
2012
FY 2012 -
2013
Total
105 - General Fund
$
$
$80,000
$ 80,000
Env. Permit
R/W
Admin
Construction Cost
-
80,000
80,000
Contingency
Other
Total Funding
$ -
$ -
$ -
$ -
$ -1$80,000
$80,000
$ -
$ 80,000
Project Costs
Design
Env. Permit
R/W
Admin
Construction Cost
-
80,000
80,000
Contingency
Other
Total Project Costs
$ -
$ -
$ -
$ -
$ -
$80,000
$ -
$ 80,000
PITD= Project Inception to Date
25
Five Year Capital Improvement Projects Listing 2008/2009 through 2012/2013
Street Maintenance Capital Projects
Project ID I Project No.: I Project Title I Estimated Total Status
STR -0002
4024
Annual Curb, Gutter and Sidewalk Repair Program
$ 500,000
STR -0004
PMP
Pavement Management Program
$ 5,000,000
STR -0007
4128
Annual Traffic Striping Maintenance
$ 500,000
STR -0019
4261
Railroad Canyon Road Slope Repair
$ 465,000
STR -0022
4289
Roadway Construction- Sunswe t Drive
$ 75,000
STR -0025
4290
Roadway Re- construction - Dexter Avenue: Lowes to Camino Del Norte
$ 370,000
ISTR-00271
4311
Pine Street-Realignment & Paving
$ 80,000
ISTR-00281
4323
Malaga Road Median Modification
$ 55,000
Total Street Maintenance Capital Projectsl $ 7,045,000
PXI
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
City of Lake Elsinore
FY 2008/09 - 2012/13 Capital Improvement Program
Project Description
Project ID No.: STR -0002
Project Number: 4024
Project Type: Annual Curb, Gutter and Sidewalk Repair Program
Description: Repair or replace damaged curbs, gutters and sidewalks at various locations throughout the City. This is an
annual project designed to maintain the existing facilities. The total expenditure does not include the current
year amounts.
Location: Various locations throughout the City.
Funding Source
PITD Actual
Costs &
Encumbrances
at 3 -31 -08
Budget
Avail.
3 -31 -08
FY 2008-
2009
FY 2009-
2010
FY 2010-
2011
FY 2011-
2012
FY 2012 -
2013
Total
110 - Gas Tax
$ 20,000
-
$ 20,000
$ 20,000
$ 20,000
$ 20,000
$ 100,000
112 - Measure A
80,000
-
80,000
80,000
80,000
80,000
400,000
R/W
-
-
Admin
3,000
3,000
3,000
3,000
3,000
15,000
Construction Cost
96,000
-
96,000
96,000
96,000
96,000
480,000
Contin enc
-
-
Other
-
Total Funding
I $ 100,000
1 $ -
$ 100,000
1 $ 100,000
1 $ 100,000
1 $ 100,000
1 $ -
$ 500,000
Project Costs
Design
$
$ -
Env. Permit
1,000
-
$ 1,000
$ 1,000
$ 1,000
$ 1,000
5,000
R/W
-
-
Admin
3,000
3,000
3,000
3,000
3,000
15,000
Construction Cost
96,000
-
96,000
96,000
96,000
96,000
480,000
Contin enc
-
-
Other
-
Total Project Costs
$ 100,000
$ -
$ 100,000
$ 100,000
$ 100,000
$ 100,000
$ -
$ 500,000
28
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.: STR -0004
Project Number: PMP
Project Type: Pavement Management Program
Description: As a part of the GASB 34 requirements, a street inventory was developed and surveys for rating the condition of
the streets have been conducted annually. The data collected has been incorporated into the City's Micro -Paver
Database. This database provides Staff a systematic approach to pavement maintenance and this project
provides funding for the maintenance through asphalt overlays and slurry seal projects.
A portion of this program in the annual amount of $100,000 is earmarked to asphalt unpaved roads.
Location: City -Wide
Funding Source
PITD Actual
Costs &
Encumbrances
at 3 -31 -08
Budget
Avail.
3 -31 -08
FY 2008-
2009
FY 2009-
2010
FY 2010-
2011
FY 2011-
2012
FY 2012 -
2013
Total
112 - Measure A
$ 800,000
$ -
$ 800,000
$ 800,000
$ 800,000
$ 800,000
$4,000,000
112 - Dirt St. Pave.
Prog.
93,345
106,655
200,000
200,000
200,000
200,000
1,000,000
R/W
-
Admin
3,957
16,043
20,000
20,000
20,000
20,000
100,000
Construction Cost
889,388
5,612
895,000
895,000
895,000
895,000
4,475,000
Contingency
-
40,000
40,000
40,000
40,000
40,000
200,000
Other
-
-
Total Funding
$ 893,345
$ 106,655
$ 1,000,000
$1,000,000
$ 1,000,000
$1,000,000
$ -
$5,000,000
Project Costs
Design
$ -
$ 45,000
$ 45,000
$ 45,000
$ 45,000
$ 45,000
$ 225,000
Env. Permit
-
R/W
-
Admin
3,957
16,043
20,000
20,000
20,000
20,000
100,000
Construction Cost
889,388
5,612
895,000
895,000
895,000
895,000
4,475,000
Contingency
-
40,000
40,000
40,000
40,000
40,000
200,000
Other
-
-
Total Project Cos
$ 893,345
$ 106,655
$ 1,000,000
$1,000,000
$ 1,000,000
$1,000,000
$ -
$5,000,000
29
City of Lake Elsinore
FY 2008/09 - 2012/13 Capital Improvement Program
Project Description
Project ID No.: STR -0007
Project Number: 4128
Project Type: Annual Traffic Striping Maintenance
Description: Refresh traffic striping and traffic legends at various locations throughout the City. This is an annual project
intended to maintain the City -wide traffic striping.
A portion of this program in the annual amount of $100,000 is earmarked to asphalt unpaved roads.
Location: Various Locations throughout the City.
Funding Source
PITD Actual
Costs &
Encumbrances
at 3 -31 -08
Budget
Avail.
3 -31-08
FY 2008-
2009
FY 2009-
2010
FY 2010-
2011
FY 2011-
2012
FY 2012 -
2013
Total
110 - Gas Tax
$ 7,000
$ -
$ 7,000
$ 7,000
$ 7,000
$ 7,000
$ 35,000
112 - Measure A
93,000
-
93,000
93,000
93,000
93,000
465,000
R/W
-
-
Admin
5,000
5,000
5,000
5,000
5,000
25,000
Construction Cost
84,000
84,000
84,000
84,000
84,000
420,000
Contingency
6,0001
6,000
6,000
6,000
6,000
30,000
Other
-
Total Funding
$ 100,000
$ -
$ 100,000
$ 100,000
$ 100,000
$ 100,000
$ -
$ 500,000
Project Costs
Design
$ 5,000
$ 5,000
$ 5,000
$ 5,000
$ 5,000
$ 25,000
Env. Permit
-
R/W
-
-
Admin
5,000
5,000
5,000
5,000
5,000
25,000
Construction Cost
84,000
84,000
84,000
84,000
84,000
420,000
Contingency
6,0001
6,000
6,000
6,000
6,000
30,000
Other
-
Total Project Costs
$ 100,000
$ -
$ 100,0001$
100,0001
$ 100,000
$ 100,000
$ -
$ 500,000
C
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.: STR -0019
Project Number: 4261
Project Type: Railroad Canyon Road Slope Repair
Description: Provide for slope repairs along Railroad Canyon Road. Preliminary design was questioned by Staff
and an alternate Geotechnical Engineer was ultimately used.
Location: Railroad Canyon Road
Funding Source
PITD Actual
Costs &
Encumbrances
at 3 -31 -08
Budget
Avail.
3 -31 -08
FY 2008-
2009
FY 2009-
2010
FY 2010-
2011
FY 2011-
2012
FY 2012 -
2013
Total
254 - Railroad
Canyon Road Benefit
$ 270,370
$ 194,630
$ 465,000
Env. Permit
R/W
-
-
Admin
10,000
10,000
Construction Cost
255,370
164,630
420,000
Contingency
-
30,000
30,000
Other
-
Total Funding
$ 270,370
$ 194,630
$ -
$ -
$ -
$ -
$ -
$ 465,000
Project Costs
Design
$ 5,000
$ 5,000
Env. Permit
R/W
-
-
Admin
10,000
10,000
Construction Cost
255,370
164,630
420,000
Contingency
-
30,000
30,000
Other
-
Total Project Costs
$ 270,370
$ 194,630
$ -
$ -
$ -
$ -
$ -
$ 465,000
31
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.: STR -0025
Project Number: 4290
Project Type: Roadway Re- construction - Dexter Avenue: Lowes to Camino Del Norte
Description: Reconstruct Dexter Avenue from Lowes Driveway to Camino Del Norte
Location: Dexter Avenue from Lowes Driveway to Camino Del Norte
Funding Source
PITD Actual
Costs &
Encumbrances
at 3 -31 -08
Budget
Avail.
3 -31 -08
FY 2008-
2009
FY 2009-
2010
FY 2010-
2011
FY 2011-
2012
FY 2012 -
2013
Total
110 - Gas Tax
$ 4,433
$365,567
$ 370,000
Env. Permit
-
-
R/W
-
-
Admin
4,433
11,167
15,600
Construction Cost
-
295,000
295,000
Contingency
-
29,400
29,400
Other
-
-
Total Funding
$ 4,433
$365,567
$ -
$ -
$ -
$ -
$ -
$ 370,000
Project Costs
Design
$ -
$ 30,000
$ 30,000
Env. Permit
-
-
R/W
-
-
Admin
4,433
11,167
15,600
Construction Cost
-
295,000
295,000
Contingency
-
29,400
29,400
Other
-
-
Total Project Costs
$ 4,433
$365,567
$ -
$ -
$ -
$ -
$ -
$ 370,000
PITD= Project Inception to Date
33
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.: STR -0028
Project Number: 4323
Project Type: Malaga Road Median Modification
Description: To construct two left turn pockets by putting an opening in the existing median to enhance access
into the easterly driveway into stadium parking lots "A" and "C.
Location: Malaga Road between Diamond Drive and the Diamond Stadium
Funding Source
PITD Actual
Costs &
Encumbrances
at 3 -31 -08
Budget
Avail.
3 -31 -08
FY 2008-
2009
FY 2009-
2010
FY 2010-
2011
FY 2011-
2012
FY 2012 -
2013
Total
605 - Public Impry
Trust Fund
$ 3,360
$ 51,640
$ 55,000
Env. Permit
-
-
R/W
-
-
Admin
-
Construction Cost
3,360
51,640
55,000
Contingency
-
Other
-
-
Total Funding
$ 3,360
$ 51,640
$ -
$ -
$ -
$ -
$ -
$ 55,000
Project Costs
Design
$ -
$ -
Env. Permit
-
-
R/W
-
-
Admin
-
Construction Cost
3,360
51,640
55,000
Contingency
-
Other
-
-
Total Project Costs
$ 3,360
$ 51,640
$ -
$ -
$ -
$ -
$ -
$ 55,000
PITD= Project Inception to Date
35
Five Year Capital Improvement Projects Listing 2008/2009 through 2012/2013
Traffic Capital Projects
Project ID I Project No.:J Project Title Estimated Total I Status
TRF -0011
4227
1 -15 /Railroad Canyon Road Project Report
$ 550,000
TRF -0012
4252
SR- 74/1 -15 Interchange Interim Improvements
$ 3,070,354
TRF -0014
4262
SR- 74/1 -15 Project Report
$ 750,000
TRF -0015
4227
1 -15/ Railroad Canyon Road Interchange Improvements
$ 35,000,000
TRF -0016
4252
SR- 74/1- 15Interchange TUMF
$ 32,200,000
TRF -0017
-
Traffic Signal Coordination
$ 50,000
TRF -0018
-
Traffic Signal Upgrade
$ 50,000
TRF -0019
-
Traffic Signal Management
$ 50,000
Total Traffic Capital Projectsl $ 71,720,354
37
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
New
New
New
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.: TRF -0011
Project Number: 4227
Project Type: 1 -15 /Railroad Canyon Road Project Report
Description: Develop a Project Report pursuant to Caltrans Local Assistance procedures. This report will identify
the mitigating project for the 1 -15 /Railroad Canyon Road interchange improvement project.
Location: Intersection of Railroad Canyon Road and Interstate 15.
Funding Source
PITD Actual
Costs &
Encumbrance
s at 3 -31 -08
Budget
Avail. At
3 -31-08
FY 2008-
2009
FY 2009-
2010
FY 2010-
2011
FY 2011-
2012
FY 2012 -
2013
Total
205 - T.I.F.
$ 327,780
$ 222,220
$ 550,000
Env. Permit
-
"
R1W
_
-
Admin
4,873
45,127
50,000
Construction Cost
-
Contingency
-
"
Other
-
-
Total Funding
$ 327,780
$222,2201$
-
$ -
1 $ -is
-
$ -
$ 550,000
Project Costs
Design
$ 322,907
$177,093
$ 500,000
Env. Permit
-
"
R1W
_
-
Admin
4,873
45,127
50,000
Construction Cost
-
Contingency
-
"
Other
-
-
Total Project Costs
$ 327,780
$ 222,220
$ -
$ -
$ -
$ -
$ -
$ 550,000
38
City of Lake Elsinore
FY 2008/09 - 2012/13 Capital Improvement Program
Project Description
Project ID No.: TRF -0012
Project Number: 4252
Project Type: SR- 74/1 -15 Interchange Interim Improvements
Description: Design and construct roadway widening on State Route 74 between Dexter Avenue and the Southbound
on /off ramps.
Location: Intersection of State Route 74 (Central Avenue) and Interstate 15.
Funding Source
PITD Actual
Costs &
Encumbrance
s at 3 -31 -08
Budget
Avail. At
3 -31 -08
FY 2008-
2009
FY 2009-
2010
FY 2010-
2011
FY 2011-
2012
FY 2012 -
2013
Total
105 - Developer Fair S
$ 197
$ 90,157
$ 90,354
115 - Traffic Safe
-
50,000
50,000
110 - Gas Tax
24,346
96,654
121,000
112 - Measure A
7,916
91,084
99,000
105 - T.E.A.
-
310,000
310,000
205 - T.I.F.
50,0001
1,044,802
1
1
1,094,802
105 - TUMF
1,305,198
-
I
1
1,305,198
Total Funding
$ 1,387,657
$ 1,682,697
1 $ -
1 $ -
$ -
$ -
$ -
$ 3,070,354
Project Costs
Design
$ -
$ 90,354
$ 90,354
Env. Permit
-
15,000
15,000
R/W
1,355,198
-
1,355,198
Admin
32,459
27,541
60,000
Construction Cost
-
1,369,802
1,369,802
Contingency
-
180,000
180,000
Other
-
-
Total Project Costs
$ 1,387,657
$ 1,682,697
$ -
$ -
$ -
$ -
$ -
$ 3,070,354
39
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.: TRF -0014
Project Number: 4262
Project Type: SR- 74/1 -15 Project Report
Description: Develop a Project Report pursuant to Caltrans Local Assistance procedures. This report will identify
the mitigating project for the 1 -15 /State Route -74 interchange improvement project.
Location: Intersection of State Route 74 and Interstate 15.
Funding Source
PITD Actual
Costs &
Encumbrance
s at 3 -31 -08
Budget
Avall. At
3 -31 -08
FY 2008-
2009
FY 2009-
2010
FY 2010-
2011
FY 2011-
2012
FY 2012 -
2013
Total
105 - TUMF
$ 716,619
$ 33,381
$ 750,000
Env. Permit
-
-
R/W
-
-
Admin
11,797
11,797
Construction Cost
-
-
Contingency
-
Other
-
-
Total Funding
$ 716,619
$ 33,381
$ -
$ -
$ -
$ -
$ -1$750,000
Project Costs
Design
$ 704,822
$ 33,381
$ 738,203
Env. Permit
-
-
R/W
-
-
Admin
11,797
11,797
Construction Cost
-
-
Contingency
-
Other
-
-
Total Project Costs
$ 716,619
$ 33,381
$ -
$ -
$ -
$ -
$ -
$ 750,000
40
City of Lake Elsinore
FY 2008/09 - 2012/13 Capital Improvement Program
Project Description
Project ID No.: TRF -0015
Project Number: 4227
Project Type: 1 -15/ Railroad Canyon Road Interchange Improvements
Description: Develop a design and program for the construction of 1 -15 /Railroad Canyon Road interchange reconfiguration.
Location: Intersection of Railroad Canyon Road and Interstate 15.
Funding Source
PITD Actual
Costs &
Encumbrances
at 3 -31 -08
Budget
Avail. At
3 -31 -08
FY 2008-
2009
FY 2009 -2010
FY 2010-
2011
FY 2011-
2012
FY 2012 -
2013
Total
105 - TUMF
$ -
$ 500,000
$17,000,000
$ 4,500,000
$ 22,000,000
105 - Federal Funds
-
8,000,000
8,000,000
112 - Measure A
-
10,000,000
5,000,000
5,000,000
Admin
-
75,000
25,000
100,000
Construction Cost
-
I
1
14,925,000
9,475,000
1 24,400,000
Contingency
-
-
Other
-
-
Total Funding
$ -
$ -
$ 500,000
$25,000,000
$ 9,500,000
$ -
$ -
$ 35,000,000
Project Costs
Design
$ -
$ 500,000
$ 500,000
Env. Permit
-
R/W
-
10,000,000
10,000,000
Admin
-
75,000
25,000
100,000
Construction Cost
-
I
1
14,925,000
9,475,000
1 24,400,000
Contingency
-
-
Other
-
-
Total Project Costs
$ -
$ -
$ 500,000
$25,000,000
$ 9,500,000
$ -
$ -
$ 35,000,000
41
City of Lake Elsinore
FY 2008/09 - 2012/13 Capital Improvement Program
Project Description
Project ID No.: TRF -0016
Project Number: 4252
Project Type: SR- 74/1 -15 Interchange (TUMF)
Description: Develop a design and program for the construction of the interchange at SR- 74/1 -15.
Location: Intersection of State Route 74 and Interstate 15.
Funding Source
PITD Actual
Costs &
Encumbrance
s at 3 -31 -08
Budget
Avail.
At
3 -31 -08
FY 2008
2009
FY 2009-
2010
FY 2010 -2011
FY 2011 -2012
FY 2012
2013
Total
105 - TUMF
$
$ 1,000,000
$15,000,000
$ 16,200,000
$ 32,200,000
Env. Permit
-
"
RAN
-
-
Admin
$ 75,000
$ 25,000
100,000
Construction Cost
14,925,000
16,175,000
31,100,000
Contingency
"
Other
-
"
Total Funding
$ -
$ -
$ -
$1,000,0001$15,000,000
$15,000,000
$16,200,000
$ -
$ 32,200,000
Project Costs
Design
$ -
$1,000,000
$ 1,000,000
Env. Permit
-
"
RAN
-
-
Admin
$ 75,000
$ 25,000
100,000
Construction Cost
14,925,000
16,175,000
31,100,000
Contingency
"
Other
-
"
Total Project Costs
$ -
$ -
$ -
$1,000,000
$15,000,000
$16,200,000
$ -
$ 32,200,000
42
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.: TRF -0018
Project Number:
Project Type: Traffic Signal Upgrade
Description: Replace existing video detection with updated system.
Location: Mill at Auto Center Dr.; Lakeshore at Chaney St.; Lincoln at Machado
Funding Source
PITD Actual
Costs &
Encumbrance
s at 3 -31 -08
Budget
Avail. At
3 -31 -08
FY 2008-
2009
FY 2009-
2010
FY 2010-
2011
FY 2011-
2012
FY 2012 -
2013
Total
606 - Mobile Source
Air Pollution Fund
$ -
50,000
$ 50,000
Env. Permit
-
"
RNV
-
-
Admin
-
"
Construction Cost
-
Contingency
-
"
Other
-
-
Total Funding
$ -
$ -
$ 50,000
$ -
$ -
$ -
$ -
$ 50,000
Project Costs
Design
$ -
50,000
$ 50,000
Env. Permit
-
"
RNV
-
-
Admin
-
"
Construction Cost
-
Contingency
-
"
Other
-
-
Total Project Costs
$ -
$ -
$ 50,000
$ -
$ -
$ -
$ -
$ 50,000
44
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.: TRF -0019
Project Number:
Project Type: Traffic Signal Management
Description: Optimize signal timing plans at various traffic signals in the City.
Location: City Wide
Funding Source
PITD Actual
Costs &
Encumbrance
s at 3 -31 -08
Budget
Avail-At
3 -31 -08
FY 2008-
2009
FY 2009-
2010
FY 2010 -
2011
FY 2011-
2012
FY 2012 -
2013
Total
606 - Mobile Source
Air Pollution Fund
$ -
50,000
$ 50,000
Env. Permit
-
"
R/W
-
-
Admin
-
-
Construction Cost
-
"
Contingency
-
"
Other
Total Funding
$ -
$ -
$ 50,000
$ -
$ -
$ -
$ -
$ 50,000
Project Costs
Design
$ -
50,000
$ 50,000
Env. Permit
-
"
R/W
-
-
Admin
-
-
Construction Cost
-
"
Contingency
-
"
Other
Total Project Costs
$ -
$ -
$ 50,000
$ -
$ -
$ -
$ -
$ 50,000
45
Five Year Capital Improvement Projects Listing 200812009 through 2012/2013
General City Capital Projects
Project ID No.: I Project No.:J Project Title I Estimated Total I Status
GEN - 0001
4209
Annual Library Book Purchase and Building Fund Contribution
$ 270,000
GEN - 0003
4253
General Plan Update
$ 725,008
GEN - 0004
4250
Palm Tree Preservation Program
$ 100,000
GEN - 0014
4301
Community Dialing Information System IVR
$ 40,000
GEN - 0016
4281
Branding Project
$ 222,619
GEN - 0017
4270
Rosetta Canyon Fire Station & Park - Phase 1
$ 6,918,000
GEN - 0018
4277
Downtown Master Plan & Civic Center Project
$ 287,387
GEN - 0023
4303
Chamber of Commerce Buildin Improvements
$ 45,000
GEN - 0025
4276
Land Acquisition
$ 100,000
GEN - 0027
4305
Web Site Replacement Project
$ 85,000
GEN - 0030
4317
General Law Enforcement Capital Items
$ 30,000
GEN - 0031
4318
Fire Services Capital Items
$ 413,200
GEN - 0032
4319
Community Development Department Capital Items
$ 17,000
GEN - 0033
4320
Public Works Department Capital Items
$ 324,200
GEN - 0034
4321
1 Parks and Recreation Department Capital Items
$ 1,338,500
GEN - 0035
4322
Lake & Aquatic Resources Department Capital Items
$ 105,600
GEN - 0036
4314
Terra Cotta Middle School Gymnasium with LEUSD
$ 750,000
GEN - 0038
-
Emergency Operations Center
$ 375,000
GEN - 0039
-
Document Management System (DMS) Phase II
$ 30,000
GEN - 0040
-
Security Camera System -City Yard
$ 30,000
GEN - 0041
-
Security Camera System -City Hall Public Parking Lot
$ 35,000
GEN - 0042
-
E -Gov Initiative Phase II Technology Purchases
$ 25,000
GEN - 0043
-
Information Technology Security and Disaster Recovery Project
$ 60,000
GEN - 0044
-
Enterprise GIS Migration
$ 75,000
GEN - 0045
-
Graffiti Tracking and Surveillance Project
$ 35,000
GEN - 0046
-
Cultural Center Technology Upgrades
$ 60,000
Total General City Capital Projectsl $ 12,496,514
47
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
New
New
New
New
New
New
New
New
New
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.: GEN - 0001
Project Number: 4209
Project Type: Annual Library Book Purchase and Building Fund Contribution
Description: Provide for the purchase of additional library books and materials on an annual basis.
Book purchase will be split between two library sights. A portion of the library monies will
be put towards construction of a new library.
Location: Various Locations
Funding Source
PITD Actual
Costs &
Encumbranc
es at 3 -31 -08
Budget
Avail. at
3 -31 -08
FY 2008
2009
FY 2009
2010
FY 2010
2011
FY 2011
2012
FY 2012
2013
Total
231 - Library Fund
Book Purchase
$ 20,000
$20,000
$20,000
$20,000
$20,000
$100,000
231 - Library Fund
Building Fund
-
50,000
30,000
30,000
30,000
30,000
170,000
Admin
-
-
Construction Cost
-
Contingency
-
-
Other
$ 20,000
$ 50,000
$50,000
$50,000
$50,000
$50,000
270,000
Total Project Costs
$ 20,000
$ 50,000
$50,000
1 $50,000
$50,000
$50,000
$ -
$270,000
Total Funding
1 $ 20,000
$ 50,000
$50,000
$50,000
$50,000
$50,000
$ -
$270,000
Project Costs
Design
-
$
Env. Permit
-
-
RM
_
-
Admin
-
-
Construction Cost
-
Contingency
-
-
Other
$ 20,000
$ 50,000
$50,000
$50,000
$50,000
$50,000
270,000
Total Project Costs
$ 20,000
$ 50,000
$50,000
1 $50,000
$50,000
$50,000
$ -
$270,000
48
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.: GEN - 0003
Project Number: 4253
Project Type: General Plan Update
Description: This project provides for the study and update of the City's General Plan. The update will
include all elements of the General Plan.
Location: City Wide
Funding Source
PITD Actual
Costs &
Encumbranc
es at 3 -31 -08
Budget
Avail. at
3 -31 -08
FY 2008 -
2009
FY 2009 -
2010
FY 2010 -
2011
FY 2011 -
2012
FY 2012 -
2013
Total
105 - General Fund
$ 725,008
$ 725,008
Env. Permit
-
-
R/W
-
-
Admin
-
-
Construction Cost
-
Contingency
-
-
6iunding
$ 725,008
$ -
725,008
Total Project Costs
$ 725,008
$ -
$ -
$ -
$ -
$ -
$ -
$ 725,008
Project Costs
Design
-
$ -
Env. Permit
-
-
R/W
-
-
Admin
-
-
Construction Cost
-
Contingency
-
-
Other
$ 725,008
$ -
725,008
Total Project Costs
$ 725,008
$ -
$ -
$ -
$ -
$ -
$ -
$ 725,008
49
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.: GEN - 0004
Project Number: 4250
Project Type: Palm Tree Preservation Program
Description: Palm trees have been identified as a valuable natural resource in the City and this project
will provide for the preservation of these trees throughout the City.
Location: City Wide
Funding Source
221 - Parks
PITD Actual
Costs &
Encumbranc
es at 3 -31-08
$0
Budget
Avail. at
3 -31 -08
$20,000
FY 2008
2009
$20,000
FY 2009
2010
$20,0001
FY 2010
2011
$20,000
FY 2011
2012
$20,000
FY 2012
2013
Total
$100,000
Env. Permit
-
_
RM
Admin
-
$ 500
$ 500
$ 500
$ 500
$ 500
2,500
Construction Cost
Contingency
-
Other
-
19,500
19,500
19,500
19,500
19,500
97,500
Total Funding
$ -
$ 20,000
$20,000
$20,000
$20,000
$20,000
$ -
$100,000
Project Costs
Design
-
$
Env. Permit
-
_
RM
Admin
-
$ 500
$ 500
$ 500
$ 500
$ 500
2,500
Construction Cost
Contingency
-
Other
-
19,500
19,500
19,500
19,500
19,500
97,500
Total Project Costs
$ -
$ 20,000
$20,000
$20,000
$20,000
$20,000
$ -
$100,000
50
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.: GEN - 0014
Project Number: 4301
Project Type: Community Dialing Information System (IVR)
Description: IVR (Integrated Voice Response) technology allows citizens and customers to
access the City's computer system via telephone, automating transactional services
such as permit status, fees, inspection requests or scheduling, business licenses,
etc. IVR can also be used to DIAL OUT to any number of community telephone
numbers, such as to provide construction alerts or emergency /flood hazard
warnings, for example. An e- government and business process improvements
initiative, per the IT strategic plan.
Location: City Hall
Funding Source
105 - Grant Eligible
PITD Actual
Costs &
Encumbranc
es at 3 -31 -08
$ -
Budget
Avail. at
3 -31 -08
$ 40,000
FY 2008
-2009
FY 2009
-2010
FY 2010
- 2011
FY 2011
- 2012
FY 2012
-2013
Total
$40,000
Design
Env. Permit
-
R/W
Admin
-
$ 40,000
40,000
Construction Cost
-
_
Total Funding
$ -
$ 40,000
$ -
$
$40,000
Project Costs
_
Design
Env. Permit
-
R/W
Admin
-
$ 40,000
40,000
Construction Cost
-
_
Contingency
-
Other
Total Project
$ -
$ -
$ -
_
$40,000
*Grant funding may be available for all or match amounts.
51
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.:
GEN - 0017
Project Number:
4270
Project Type:
Rosetta Canyon Fire Station & Park - Phase I
Description:
This project includes the design and construction of a 7,700 sf. fire station and the design only of a
$ 310,675
15,500 sf. community center in the Rosetta Canyon development (not construction of community
Costs &
center).
Location: Rosetta Canyon Park site close to State Hwy. 74 and Rosetta Canyon Dr.
Project Costs
Design
PITD Actual
$ 310,675
Env. Permit
Costs &
Budget
R/W
Encumbranc
Avail. at
FY 2008 -
FY 2009
FY 2010
FY 2011
FY 2012
Funding Source
105 - General Fund 1
es at 3 -31 -08
$ -
3 -31-08
$ 1,478,000
2009
($650,000)
2010
2011
2012
2013
Total
$ 828,000
232 - Fire Facility Impact Fees
343,100
256,900
179,875
600,000
105 - Developer Agreement
795,535
404,465
1,350,000
620,100
2,550,000
Fees
Other
204,325
117 - Community Center
-
112,600
47,400
$1,004,300
$ -
$ -
$ -
160,000
Impact Fees
221 - Park Impact Fees
-
2,780,000
2,780,000
Total Funding
$ 795,535
$ 5,118,165
$1,004,300
$ -
$ -
$ -
$ -
$ 6,918,000
Project Costs
Design
310,675
$ 310,675
Env. Permit
-
R/W
Admin
13,549
65,051
78,600
Construction Cost
471,3111
5,053,114
179,875
1 5,704,300
Contingency
-
620,100
620,100
Other
204,325
204,325
Total Project Costs
$ 795,535
$ 5,118,165
$1,004,300
$ -
$ -
$ -
$ -
$ 6,918,000
53
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.: GEN - 0023
Project Number: 4303
Project Type: Chamber of Commerce Building Improvements
Description:
Chamber Improvements include the replacing the damaged handicap ramp and replace
roof material and eves.
Location: Lake Elsinore Valley Chamber of Commerce, 132 West Graham Avenue
Funding Source
PITD Actual
Costs &
Encumbranc
es at 3 -31 -08
Budget
Avail. at
3 -31 -08
FY 2008 -
2009
FY 2009
-2010
FY 2010
-2011
FY 2011
2012
FY 2012
2013
Total
105 - General Fund
$ -
$ 45,000
$(45,000)
$45,000
$45,000
Env. Permit
-
-
R/W
-
-
Admin
-
1,000
1,000
Construction Cost
-
38,000
38,000
Contingency
-
3,000
3,000
Other
-
Total Funding
$ -
$ 45,000
$(45,000)
$ -
$ -
$45,000
$ -
$45,000
Project Costs
Design
-
$ 3,000
$3,000
Env. Permit
-
-
R/W
-
-
Admin
-
1,000
1,000
Construction Cost
-
38,000
38,000
Contingency
-
3,000
3,000
Other
-
Total Project Costs
$ -
$ 45,000
$ -
$ -
$ -
$ -
$ -
$451000
55
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.: GEN - 0025
Project Number: 4276
Project Type: Land Acquisition
Description: Start of an annual program of allocating funding for the purchase of property around the lake.
Location: Various parcels around the lake edge
Funding Source
PITD Actual
Costs &
Encumbranc
es at 3 -31 -08
Budget
Avail. at
3 -31 -08
FY 2008 -
2009
FY 2009 -
2010
FY 2010 -
2011
FY 2011 -
2012
FY 2012 -
2013
Total
105 - General Fund
$ 78,400
$ 421,600
$ 400,000
$100,000
Env. Permit
-
-
R/W/ Land
78,400
$ 421,600
$ 400,000
100,000
Admin
-
-
Construction Cost
-
Contingency
-
-
Other
-
Total Funding
$ 78,400
$ 421,600
$ (400,000)
$ -
$ -
$ -
$ -
$ 100,000
Project Costs
Design
-
$0
Env. Permit
-
-
R/W/ Land
78,400
$ 421,600
$ 400,000
100,000
Admin
-
-
Construction Cost
-
Contingency
-
-
Other
-
Total Project Costs
$ 78,400
$ 421,600
$ (400,000)
$ -
$ -
$ -
$ -
$ 100,000
PITD= Project Inception to Date
F1✓
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.:
GEN - 0027
Project Number:
4305
Project Type:
Web Site Replacement Project
Description:
Replacement of City's Web site is an IT Strategic Plan recommendation. Project includes
Total
hardware and security for Web hosting, Content Management System (CMS), database
$ 78,540
architecture, content repurposing, reporting metrics, testing and initial maintenance. RFP
pending.
Location: Citywide
Funding Source
PITD Actual
Costs &
Encumbranc
es at 3 -31 -08
Budget
Avail. at
3 -31-08
FY 2008
2009
FY 2009
2010
FY 2010
2011
FY 2011
2012
FY 2012
2013
Total
105 - General Fund
$ 78,540
$ 6,460
$85,000
Env. Permit
-
-
R/W
-
-
Admin
-
-
Construction Cost
-
Contingency
-
-
Other
78,540
$ 6,460
85,000
Total Funding
$ 78,540
$ 6,460
$
$ -
$ -
$ -
$ -
$85,000
Project Costs
Design
-
$ -
Env. Permit
-
-
R/W
-
-
Admin
-
-
Construction Cost
-
Contingency
-
-
Other
78,540
$ 6,460
85,000
Total Project Costs
$ 78,540
$ 6,460
$ -
$ -
$ -
$ -
$ -
$85,000
57
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.: GEN - 0031
Project Number: 4318
Project Type: Fire Services Capital Items
Description: Capital for the Fire Services Department. In FY 08 -09, the capital item budget will be for new
equipment for new station for $400,000 , to be split between the City and the County for
$200,000 each. The 07 -08 costs relate to automation of gates at McVicker Fire Station.
Location: Fire Department
Funding Source
PITD Actual
Costs &
Encumbranc
es at 3 -31 -08
Budget
Avail. at
3 -31 -08
FY 2008 -
2009
FY 2009 -
2010
FY 2010 -
2011
FY 2011 -
2012
FY 2012
2013
Total
105 - General Fund
$ 13,023
$ 177
$200,000
$213,200
105 - County
Contibution
-
200,000
200,000
R/W
-
-
Admin
-
'
Construction Cost
-
'
Contingency
-
-
Other
$ 13,023
$ 177
$400,000
413,200
Total Funding
$ 13,023
$ 177
$400,000
$ -
$ -
$ -
$ -
$413,200
Project Costs
Design
-
$0
Env. Permit
-
R/W
-
-
Admin
-
'
Construction Cost
-
'
Contingency
-
-
Other
$ 13,023
$ 177
$400,000
413,200
Total Project Costs
$ 13,023
$ 177
$400,000
$ -
$ -
$ -
$ -
$413,200
59
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.: GEN - 0033
Project Number: 4320
Project Type: Public Works Department Capital Items
Description: Capital removed from the Public Works Department operating budget. The capital item budget
included $182,000 for vehicle replacement (100 -4451- 439.40 -40) and $52,200 for Weed
Abatement equipment (100 - 4340 - 432.40 -50). For fiscal year 2008/2009 and forward, $45,000
is allocated as a pool to be used for replacement as needed by the department.
Location: Public Works Yard
Funding Source
PITD Actual
Costs &
Encumbranc
es at 3 -31 -08
Budget
Avail. at
3 -31 -08
FY 2008 -
2009
FY 2009 -
2010
FY 2010 -
2011
FY 2011 -
2012
FY 2012
2013
Total
105 - General Fund
$ 111,540
$122,660
$ 45,000
$ 45,000
$324,200
Env. Permit
-
-
R/W
-
-
Admin
-
-
Construction Cost
-
Contingency
-
-
Other
$ 111,540
$122,660
$ -
$ -
$ 45,000
$ 45,000
324,200
Total Funding
$ 111,540
$122,660
$ -
$ -
$ 45,000
$ 45,000
$ -
$324,200
Project Costs
Design
-
$0
Env. Permit
-
-
R/W
-
-
Admin
-
-
Construction Cost
-
Contingency
-
-
Other
$ 111,540
$122,660
$ -
$ -
$ 45,000
$ 45,000
324,200
Total Project Costs
$ 111,540
$122,660
$ -
$ -
$ 45,000
$ 45,000
$ -
$324,200
61
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.:
GEN - 0035
Project Number:
4322
Project Type:
Lake & Aquatic Resources Department Capital Items
Description:
Capital removed from the Lake & Aquatic Resources Department operating budget. The
Total
capital item budget included $16,700 for the Lake Destratification System machinery &
$ -
equipment and $5,000 for the Lake Administration machinery & equipment in FY 07 -08 only.
$ 16,700
Also $17,100 for the Speed baot Limit Ordinance
Location: Lake Operations
Funding Source
PITD Actual
Costs &
Encumbranc
es at 3 -31 -08
Budget
Avail. at
3 -31 -08
FY 2008 -
2009
FY 2009 -
2010
FY 2010 -
2011
FY 2011 -
2012
FY 2012
2013
Total
105 - General Fund
$ -
$ 38,800
$ 16,700
$ 16,700
$ 16,700
$ 16,700
$105,600
Env. Permit
-
-
RM/
-
-
Admin
-
-
Construction Cost
-
-
[Contingency
-
-
Other
$ -
$ 38,800
$ 16,700
$ 16,700
$ 16,700
$ 16,700
105,600
Total Funding
$ -
$ 38,800
$ 16,700
$ 16,700
$ 16,700
$ 16,700
$ -
$105,600
Project Costs
Design
-
$0
Env. Permit
-
-
RM/
-
-
Admin
-
-
Construction Cost
-
-
[Contingency
-
-
Other
$ -
$ 38,800
$ 16,700
$ 16,700
$ 16,700
$ 16,700
105,600
Total Project Costs
$ -
$ 38,800
$ 16,700
$ 16,700
$ 16,700
$ 16,700
$ -
$105,600
63
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.: GEN - 0038
Project Number:
Project Type: Emergency Operations Center
Description: Purchase equipment for a new and permanent Emergency Operations Center (EOC). 33% of
funding is non - required matching and 67% is Federal Funding -DOJ.
Location: City Emergency Operations Center
Funding Source
PITD Actual
Costs &
Encumbranc
es at 3 -31 -08
Budget
Avail. at
3 -31 -08
FY 2008 -
2009
FY 2009 -
2010
FY 2010 -
2011
FY 2011 -
2012
FY 2012
2013
Total
105 - General Fund
$ -
$125,000
$125,000
105 - Fed Funds DOJ
-
250,000
250,000
Admin
$ -
$
$ -
Construction Cost
-
375,000
375,000
Contingency
-
Other
-
Total Project Costs
$ -
$ -
$ 375,000
$ -
$ -
$ -
$ -
$375,000
Total Funding
$ -
$ -
$375,000
$ -
$ -
Is -
$ -
$375,000
Project Costs
Design
Env. Permit
-
-
R/W
-
Admin
$ -
$
$ -
Construction Cost
-
375,000
375,000
Contingency
-
Other
-
Total Project Costs
$ -
$ -
$ 375,000
$ -
$ -
$ -
$ -
$375,000
65
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.:
GEN - 0040
Project Number:
FY 2008 -
2009
Project Type:
Security Camera System -City Yard
Description:
Installation of security camera system at the City Yard.
Location:
City Yard
Funding Source
PITD Actual
Costs &
Encumbranc
es at 3 -31 -08
Budget
Avail. at
3 -31 -08
FY 2008 -
2009
FY 2009 -
2010
FY 2010 -
2011
FY 2011 -
2012
FY 2012
2013
Total
105 - General Fund
$ -
$ 30,000
$30,000
Env. Permit
-
-
R/W
-
-
Admin
-
-
Construction Cost
-
Contingency
-
Other
$ -
$ 30,000
30,000
Total Funding
1 $ -
$ -
$ -
$ -
$ -
$ 30,000
$ -
$30,000
Project Costs
Design
-
$0
Env. Permit
-
-
R/W
-
-
Admin
-
-
Construction Cost
-
Contingency
-
Other
$ -
$ 30,000
30,000
Total Project Costs
$ -
$ -
$ -
$ -
$ -
$ 30,000
$ -
$30,000
67
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.: GEN - 0042
Project Number:
Project Type: E -Gov Initiative Phase II Technology Purchases
Description: Online e- government service purchases with 3rd party vendors that integrate with City
Enterprise Systems to provide citizens with timely information.
Location: City Wide
Funding Source
PITD Actual
Costs &
Encumbranc
es at 3 -31 -08
Budget
Avail. at
3 -31 -08
FY 2008 -
2009
FY 2009 -
2010
FY 2010 -
2011
FY 2011 -
2012
FY 2012
2013
Total
105 - General Fund
$ -
$ 25,000
$25,000
Env. Permit
-
-
R/W
-
-
Admin
Construction Cost
Contin enc
-
-
Other
$
$ 25,000
25,000
Total Funding
$ -
$ -
$ -
$ -
$ -
$ 25,00#1S
-
$25,000
Project Costs
Design
$0
Env. Permit
-
-
R/W
-
-
Admin
Construction Cost
Contin enc
-
-
Other
$
$ 25,000
25,000
Total Project Costs
$ -
$ -
$ -
$ -
$ -
$ 25,000
$ -
$25,000
.•
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.: GEN - 0044
Project Number:
Project Type: Enterprise GIS Migration
Description: Equipment, software, data, and consulting purchases to migrate the City's GIS system to an
enterprise multi -user system. Upgrades will allow citizens access to online GIS information.
Location: City Wide
Funding Source
PITD Actual
Costs &
Encumbranc
es at 3 -31 -08
Budget
Avail. at
3 -31 -08
FY 2008 -
2009
FY 2009 -
2010
FY 2010 -
2011
FY 2011 -
2012
FY 2012
2013
Total
105 - General Fund
$ -
$ 75,000
$75,000
Env. Permit
-
R/W
-
-
Admin
-
-
Construction Cost
-
Contingency
-
Other
$ -
$ 75,000
75,000
Total Funding
$ -
$ -
$ -
$ -
$ -
$ 75,000
$ -
$75,000
Project Costs
Design
-
$0
Env. Permit
-
R/W
-
-
Admin
-
-
Construction Cost
-
Contingency
-
Other
$ -
$ 75,000
75,000
Total Project Costs
$ -
$ -
$ -
$ -
$ -
$ 75,000
$ -
$75,000
71
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.: GEN - 0046
Project Number:
Project Type: Cultural Center Technology Upgrades
Description: Integrated audio - visual system upgrades including new video projection system, streaming
video, sound board, networked office copier /printer /scanner, wireless hotspot, and related
network upgrades. Construction of cabinets, cabling, power, and mounts.
Location: City Wide
Funding Source
PITD Actual
Costs &
Encumbrance
s at 3 -31 -08
Budget
Avail. at
3 -31 -08
FY 2008 -
2009
FY 2009 -
2010
FY 2010 -
2011
FY 2011 -
2012
FY 2012
2013
Total
105 - General Fund
$ -
$ 60,000
$60,000
Env. Permit
-
-
R/W
-
-
Admin
-
-
Construction Cost
-
Contingency
-
-
Other
$ -
$ 60,000
60,000
Total Funding
$ -
$ -
$ -
$ -
$ -
$ 60,000
$ -1$60,000.
$60,000
Project Costs
Design
-
-
Env. Permit
-
-
R/W
-
-
Admin
-
-
Construction Cost
-
Contingency
-
-
Other
$ -
$ 60,000
60,000
Total Project Costs
$ -
$ -
$ -
$ -
$ -
$ 60,000
$ -
$60,000
73
Five Year Capital Improvement Projects Listing 2008/2009 through 2012/2013
Drainage Projects
Project ID Nol Project No.:J Project Title Estimated Total I Status
DRN - 0002
4295
Arro o Del Torro Drainage Improvement
$ 65,000
DRN - 0003
4296
3rd Street Interim Drainage Improvement
$ 16,000
DRN - 0004
4297
Drainage Improvement/ Roadway Reconstruction: Fraser Drive
$ 210,000
DRN - 0005
4224
Drainage Master Plan Update
$ 278,000
DRN - 0006
-
Drainage Improvements
$ 350,000
Total Drainage Projects $ 919,000
75
Ongoing
Ongoing
Ongoing
Ongoing
New
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.: DRN - 0002
Project Number: 4295
Project Type: Arroyo Del Torro Drainage Improvement
Description: Contribute City's share of the master planned storm drain system from the Arroyo Del Torro Channel near 1 -15
extending beyond the cemetery extending to the outflow channel near Riverside Drive and Collier Avenue. This
is a Riverside County Flood Control Project.
Location: From 1 -15 behind the cemetery to Collier Avenue extending to the outflow channel.
Funding Source
211 - Storm Drain
PITD Actual
Costs &
Encumbrances
at 3 -31 -08
$ -
Budget Avail.
at 3 -31 -08
$65,000
FY 2008-
2009
FY 2009-
2010
FY 2010-
2011
FY 2011-
2012
FY 2012 -
2013
1
Total
65,000
Design
-
Env. Permit
-
R/W
_
-
Admin
-
Construction Cost
-
$65,000
65,000
Contingency
-
Total Funding
$ -
$ 65,0001$
-
$ -
$ -
$ -
$ -
$ 65,000
Project Costs
Design
-
Env. Permit
-
R/W
_
-
Admin
-
Construction Cost
-
$65,000
65,000
Contingency
-
Other
Total Project Costs
$ -
$ 65,000
$ -
$ -
$ -
$ -Is
76
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.: DRN - 0003
Project Number: 4296
Project Type: 3rd Street Interim Drainage Improvement
Description: Construct drainage improvements to covey nuisance water to the 3rd Street Drainage Channel.
Location: West end of 3rd Street at Pasadena Street
Funding Source
PITD Actual
Costs &
Encumbrances
at 3 -31 -08
Budget Avail.
at 3 -31 -08
FY 2008-
2009
FY 2009-
2010
FY 2010-
2011
FY 2011-
2012
FY 2012 -
2013
Total
201 - Street Im r.
$ -
$ 16,000
$ 16,000
Env. Permit
-
-
R/W
-
-
Admin
-
1,100
1,100
Construction Cost
-
13,000
13,000
Contingency
-
1,300
1,300
Other
-
Total Funding
Is -
$ 16,000
$ -
$ -
$ -
$ -
$ -
$ 16,000
Project Costs
Design
-
$ 600
600
Env. Permit
-
-
R/W
-
-
Admin
-
1,100
1,100
Construction Cost
-
13,000
13,000
Contingency
-
1,300
1,300
Other
-
Total Project Costs
$ -
$ 16,000
$ -
$ -
$ -
$ -
$ -
$ 16,000
77
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
Project ID No.: DRN - 0005
Project Number: 4224
Project Type: Drainage Master Plan Update
Description: To develop an updated Drainage Master Plan and Storm Drain development impact fees for the City of Lake
Elsinore.
Funding Source
PITD Actual
Costs &
Encumbrances
at 3 -31 -08
Budget Avail.
at 3 -31 -08
FY 2008-
2009
FY 2009-
2010
FY 2010-
2011
FY 2011-
2012
FY 2012 -
2013
Total
110 - Gas Tax
$ 419
1
$ 419
211 -Storm Drain
258,939
18,255
277,194
105 - General Fund
356
356
112 - Measure A
31
18,255
31
Construction Cost
-
-
Contin en
-
-
Other
252,841
252,841
Total Funding
$ 259,7451
$ 18,255
$ -
$ -
$ -
Is -
$ -
$ 278,000
Project Costs
Design
-
-
Env. Permit
-
PJW
_
-
Admin
6,904
18,255
25,159
Construction Cost
-
-
Contin en
-
-
Other
252,841
252,841
Total Project Costs
$ 259,7451$
18,255
1 $ -
$ -
$ -
$ -
$ -
$ 278,000
PITD= Project Inception to Date
79
COMPLETED, DELETED, OR HELD PROJECTS
81
Five Year Capital Improvement Projects Listing 2008/2009 through 2012/2013
Park and Recreation Capital Projects - Completed /Deleted /Held
Project ID No.: JProject No.: Project Title I Estimated Total I Status
PRK - 0001
4248
Park & Trails Master Plan
$ 51,200
PRK - 0004
4275
City Park Play Equipment Re lacement
$ 94,460
PRK - 0010
4283
Construction of Park Security Gates
$ 18,000
PRK - 0013
4291
Lake point Park Conversion Project
$ 124,000
PRK - 0015
4293
Lake oint Park Play Equipment Re lacement
$ 193,122
PRK - 0016
4294
Tuscany Hills Park Play Equipment Re lacement
$ 119,418
Total Park and Recreation Capital Projects— 600,200
83
Completed
Completed
Completed
Held
Completed
Completed
Five Year Capital Improvement Projects Listing 2008/2009 through 2012/2013
General City Capital Projects - Completed /Deleted /Held
Project ID No.: I Project No.: Project Title Estimated Total I Status
GEN - 0002
4286/4298
IT Renovation/ Server Racks (Formerly GEN -0013
$ 30,000
GEN - 0010
4299
Click2Gov Server Purchase
$ 10,000
GEN - 0011
4300
Document Management System (DMS) Pilot
$ 25,000
GEN - 0015
4302
HTE /GIS Integration aka Looking Glass TM
$ 40,000
GEN - 0019
4272
City Yard Locker Room /Restroom Expansion
$ 28,030
GEN - 0024
4304
Alberhill Ranch Community Center
$ 5,370,000
GEN - 0028
4306
Digital Surveillance Pilot Project (anti-graffiti)
$ 25,000
GEN - 0037
4313
Storage Area Network Upgrade SANS
$ 50,000
Total General City Capital Projects- 5,578,030
85
Completed
Deleted
Completed
Deleted
Held
Unfunded
Completed
Completed
Five Year Capital Improvement Unfunded Projects Listing 2013/2014 through 2017/2018
Lake and Aquatic Resource Projects
Project ID No.: I Project Title Estimated Total
U.LKE.0001
Elm Grove Beach Rehabilitation -Phase II
$ 1,250,000
U.LKE.0002
Lake Master Plan Update
$ 150,000
U.LKE.0005
Dredge Inlet Channel
$ 4,375,000
Total Lake and Aquatic Resource Projects I $ 5,775,000
87
City of Lake Elsinore
FY 2008/09- 2017/18 Capital Improvement Program
Project Description
(FY 2013/14 - 2017/18)
Unfunded
Project ID No.: U.LKE.0001
Project Number:
Project Type: Elm Grove Beach Rehabilitation -Phase II
Description: Rehabilitate Elm Grove Beach including parking, street, storm drain, landscape and park amenities.
Location: Elm Grove Beach
Funding Source
FY 2013/2014
FY 2014/2015
2015/2016
2016/2017
201712018
Total
Design
$ 1,250,000
$ 1,250,000
Env. Permit
$ -
R1W
-
Admin
-
Construction Cost
1,250,000
1,250,000
Contingency
-
Other
-
Total Funding
$ -
$ -
$ -
$ -
$ 1,250,000
$ -
$ 1,250,000
Project Costs
Design
-
Env. Permit
$ -
R1W
-
Admin
-
Construction Cost
1,250,000
1,250,000
Contingency
-
Other
-
Total Project Costs
$ -
$ -
$ -
$ -
$ 1,250,000
$ -
$ 1,250,000
88
City of Lake Elsinore
FY 2008/09- 2017/18 Capital Improvement Program
Project Description
(FY 2013/14- 2017/18)
Unfunded
Project ID No.: U.LKE.0002
Project Number:
Project Type: Lake Master Plan Update
Description: Update Lake Elsinore Master Plan.
Location: Lake Wide
Funding Source
FY 2013/2014
FY 2014/2015
2015/2016
FY 2016/2017
FY 2017/2018
Total
Design
$ 150,000
$ 150,000
Env. Permit
'
R/W
-
Admin
$ 150,000
$ 150,000
Construction Cost
-
Contingency
'
Other
-
Total Funding
$ -
$ 150,000
$ -
$ -
$ -
$ -
$ 150,000
Project Costs
Design
'
Env. Permit
'
R/W
-
Admin
$ 150,000
$ 150,000
Construction Cost
-
Contingency
'
Other
-
Total Project Costs
$ -
$ 150,000
$ -
$ -
$ -
$ -
$ 150,000
89
City of Lake Elsinore
FY 2008/09- 2017/18 Capital Improvement Program
Project Description
(FY 2013/14- 2017/18)
Unfunded
Project ID No.: U.LKE.0005
Project Number:
Project Type: Dredge Inlet Channel
Description: Remove silt build -up from storm run -off from the inlet channel to reestablish uniform depth.
Location: Inlet Channel between the San Jacinto River and the main lake.
Funding Source
FY 2013/2014
FY 2014/2015
2015/2016
FY 2016/2017
FY 2017/2018
Total
Design
$ 4,375,000
$ 4,375,000
Env. Permit
300,000
300,000
RM
-
Admin
15,000
15,000
Construction Cost
3,600,000
3,600,000
Contingency
310,000
310,000
Other
-
Total Funding
$ -
$ 4,375,000
$ -
$ -
$ -
$ -
$ 4,375,000
Project Costs
Design
$ 150,000
$ 150,000
Env. Permit
300,000
300,000
RM
-
Admin
15,000
15,000
Construction Cost
3,600,000
3,600,000
Contingency
310,000
310,000
Other
-
Total Project Costs
$ -
$ 4,375,000
$ -
$ -
$ -
$ -
$ 4,375,000
90
Five Year Capital Improvement Unfunded Projects Listing 2013/2014 through 2017/2018
Park and Recreation Unfunded Capital Projects
Project ID No.: I Project Title I Estimated Total
Total Park and Recreation Capital Projectsl $ 8,710,000
91
U.PRK.0001
City Park Expansion
$ 955,000
U.PRK.0002
Outlet Channel, Phase 1
$ 550,000
U.PRK.0005
Strengthen Lake point Park Jetty Wall
$ 50,000
U.PRK.0006
Lake point Park Playground Equipment Re lacement
$ 20,000
U.PRK.0008
Machado Park Restroom replacement.
$ 500,000
U.PRK.0009
Lake point Park Parking Lot Paving
$ 265,000
U.PRK.0011
Swick - Matich Park Improvements
$ 1,000,000
U.PRK.0012
Alberhill Ranch Community Center
$ 5,370,000
Total Park and Recreation Capital Projectsl $ 8,710,000
91
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
(FY 2013/14- 2017/18)
Unfunded
Project ID No.: U.PRK.0001
Project Number:
Project Type: City Park Expansion
Description: Expand City Park.
Location: Library Street and Main Street
Funding Source
FY 2013-
2014
FY 2014-
2015
FY 2015-
2016
FY 2016-
2017
FY 2017 -
2018
Total
Design
$ 955,000
$ 955,000
Env. Permit
5,000
5,000
R/W
5,000
5,000
Admin
25,000
25,000
Construction Cost
800,000
800,000
Contingency
70,000
70,000
Other
g$9
Total Funding
$ 955,000
$ -
$ -
$ -
$ -
00
Project Costs
Design
$ 50,000
$ 50,000
Env. Permit
5,000
5,000
R/W
5,000
5,000
Admin
25,000
25,000
Construction Cost
800,000
800,000
Contingency
70,000
70,000
Other
-
Total Project Costs
$ 955,000
$ -
$ -
$ -
$ -
$ 955,000
92
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
(FY 2013/14- 2017/18)
Unfunded
Project ID No.: U.PRK.0002
Project Number:
Project Type: Outlet Channel, Phase I
Description: Construct multi -use trail along the outflow channel between Lakeshore Drive and Limited
Avenue.
Location: Lakeshore Drive and Limited Avenue at the entrance to the outflow channel.
Funding Source
2014
2015
2016
2017
2018
Total
Design
$ 550,000
$ 550,000
Env. Permit
5,000
5,000
RM
-
Admin
15,000
15,000
Construction Cost
450,000
450,000
Contingency
35,000
35,000
Other
-
Total Funding
$ 550,000
$ -
$ -
$ -
$ -
$ 550,000
Project Costs
Design
$ 45,000
$ 45,000
Env. Permit
5,000
5,000
RM
-
Admin
15,000
15,000
Construction Cost
450,000
450,000
Contingency
35,000
35,000
Other
-
Total Project Costs
$ 550,000
$ -
$ -
$ -
$ -
$ 550,000
93
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
(FY 2013/14 - 2017/18)
Unfunded
Project ID No.: U.PRK.0005
Project Number:
Project Type: Strengthen Lakepoint Park Jetty Wall
Description: The existing jetty wall requires strengthening and the existing rip -wrap needs to be
grouted into place for stability.
Location: Along inflow channel adjacent to Lakepoint Park
Funding Source
2014
2015
2016
2017
2018
Total
Design
$ 50,000
$ 50,000
Env. Permit
5,000
5,000
R/W
-
Admin
2,000
2,000
Construction Cost
37,000
37,000
Contingency
4,000
4,000
Other
-
Total Funding
$ 50,000
$ -
$ -
$ -
$ -
$ 50,000
Project Costs
Design
$ 2,000
$ 2,000
Env. Permit
5,000
5,000
R/W
-
Admin
2,000
2,000
Construction Cost
37,000
37,000
Contingency
4,000
4,000
Other
-
Total Project Costs
$ 50,000
$ -
$ -
$ -
$ -
$ 50,000
94
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
(FY 2013114- 2017/18)
Unfunded
Project ID No.: U.PRK.0006
Project Number:
Project Type: Lakepoint Park Playground Equipment Replacement
Description: The existing playground equipment is outdated and needs to be replaced with new
equipment.
Location: Lakepoint Park
Funding Source
FY 2013-
2014
FY 2014-
2015
FY 2015-
2016
FY 2016-
2017
FY 2017 -
2018
Total
Design
$ 20,000
$ 20,000
Env. Permit
-
R/W
-
Admin
-
Construction Cost
20,000
20,000
Contingency
Other
-
Total Funding
$ 20,000
$ -
$ -
$ -Is
-
$ 20,000
Project Costs
Design
$ -
Env. Permit
-
R/W
-
Admin
-
Construction Cost
20,000
20,000
Contingency
Other
-
Total Project Costs
$ 20,000
$ -
$ -
$ -
$ -
$ 20,000
95
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
(FY 2013/14- 2017/18)
Unfunded
Project ID No.: U.PRK.0008
Project Number:
Project Type: Machado Park Restroom replacement.
Description: Construct new restroom facility to replace the outdated building.
Location: Machado Park
Funding Source
2014
2015
2016
2017
2018
Total
Design
$ 500,000
$ 500,000
Env. Permit
5,000
5,000
RMI
-
Admin
20,000
20,000
Construction Cost
400,000
400,000
Contingency
30,000
.30,000
Other
Total Funding
$ 500,000
$ -
$ -
$ -
$ -
$ 500,000
Project Costs
Design
$ 45,000
$ 45,000
Env. Permit
5,000
5,000
RMI
-
Admin
20,000
20,000
Construction Cost
400,000
400,000
Contingency
30,000
.30,000
Other
Total Project Costs
$ 500,000
$ -
$ -
$ -
$ -
$ 500,000
K*1
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
(FY 2013/14- 2017/18)
Unfunded
Project ID No.: U.PRK.0009
Project Number:
Project Type: Lakepoint Park Parking Lot Paving
Description: Pave the existing gravel parking lot at Lake Point Park.
Location: Lakepoint Park
Funding Source
2014
$ 265,000
2015
2016
2017
2018
Total
$ 265,000
Design
$ 10,000
$ 10,000
Env. Permit
5,000
RfW
5,000
Admin
8,000
Construction Cost
220,000
8,000
Contingency
22,000
220,000
Total Funding
$ 265,000
$ -
$ -
$ -
$ -
$ 265,000
Project Costs
Design
$ 10,000
$ 10,000
Env. Permit
5,000
RfW
5,000
Admin
8,000
Construction Cost
220,000
8,000
Contingency
22,000
220,000
Other
22,000
Total Project Costs
$ 265,000
$
$ 265,000
97
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
(FY 2013/14- 2017118)
Unfunded
Project ID No.: U.PRK.0011
Project Number:
Project Type: Swick - Matich Park Improvements
Description: Swick - Matich Park Improvements: Installation of new state -of- the -art ball field lighting
system, relocation of the ball field switch gear closer to the building, removal of the
existing cracked concrete bleachers, excavation of the embankment and construction of
a crib wall, redesign and installation of the irrigation system, construction of a small tot
lot, install sidewalks throughout and landscape the entire site to include a new park
monument siqn.
Location: Swick - Matich Park at Limited Avenue and Poe Street.
Funding Source
2014
2015
2016
2017
2018
Total
Design
$ 1,000,000
$ 1,000,000
Env. Permit
5,000
5,000
R/W
30,000
30,000
Admin
830,000
830,000
Construction Cost
75,000
75,000
Contingency
-
Other
Total Funding
$ 1,000,000
$ -
$ -
$ -
$ -
$ 1,000,000
Project Costs
Design
$ 60,000
$ 60,000
Env. Permit
5,000
5,000
R/W
30,000
30,000
Admin
830,000
830,000
Construction Cost
75,000
75,000
Contingency
-
Other
Total Project Costs
$ 1,000,000
$ -
$ -
$ -
$ -
$ 1,000,000
.;
City of Lake Elsinore
2008 -2013 Capital Improvement Program
Project Description
(FY 2013114-2017/18)
Unfunded
Project ID No.: U.PRK.0012
Project Number:
Project Type: Alberhill Ranch Community Center
Description: Approximately 20,000 sf. Community Center.
Location: Alberhill Ranch Sports Park along Lake Street and Nicholes
FY 2013- FY 2014- FY 2015- FY 2016- FY 2017 -
Funding Source 2014 2015 2016 2017 2018 Total
$ 2,500,000 $ 2,870,000 $ 5,370,000
Total Funding $ 2,500,000 $ 2,870,000 $ - $ - $ - $ 5,370,000
Project Costs
$ 260,000
Design
$ 260,000
Env. Permit
R/W
Admin
91,000
91,000
Construction Cost
2,240,000
2,242,000
4,482,000
Contingency
537,000
537,000
Other
Total Project Costs
$ 2,500,000
$ 2,870,000
$ -
$ -
$ -
$ 5,370,000
..
Five Year Capital Improvement Unfunded Projects Listing 201312014 through 2017/2018
Unfunded Street Maintenance Capital Projects
+ Title
Estimated Total
I
[Project D No.: Project Tine
Total Street Maintenance Capital Projects [-$ 19,523,000
101
Lakeshore Drive Widening and Street Li htin
$ 4,218,000
U.STR.0001
U.STR.0003
Camino Del Norte Roadway Connection.
$ 5,230,000
U.STR.0004
Graham Avenue Reconstruction.
$ 310,000
U.STR.0005
Ellis Street Reconstruction
$ 205,000
U.STR.0006
Nichols Road Improvements.
$ 1,200,000
U.STR.0007
Reid Street Improvements
$ 634,000
U.STR.0010
Gunnerson Avenue Roadway Reconstruction.
$ 1,385,000
U.STR.0011
Oakview Wa /Beechwood Lane Street Repair and Drainage Improvement.
$ 374,000
U.STR.0012
Larson Road Overlay.
$ 300,000
U.STR.0014
Grand Avenue Overlay
$ 1,125,000
U.STR.0015
Lakeshore Drive Overlay.
$ 1,480,000
U.STR.0016
Drainage Improvements at Limited and Spring.
$ 50,000
U.STR.0018
Railroad Canyon Road Westbound Lane Extension
$ 301,000
U.STR.0019
Right-of-way acquisition and roadway construction for eastbound Machado Stre
$ 78,000
U.STR.0021
Roadway Paving-Diamond Drive
$ 727,000
U.STR.0023
Roadway Pavin -Kello Street
$ 790,000
U.STR.0024
Roadway Re- construction -Lake Crest Drive
$ 100,000
U.STR.0026
Collier Avenue Median Landscaping
$ 355,000
U.STR.0027
Lakeshore Drive- Graham Avenue to Chaney Street Bike Path
$ 101,000
U.STR.0028
Elm Street Paving
$ 150,000
U.STR.0029
Survey Monuments
$ 150,000
U.STR.0030
Under round Street Light Wiring
$ 260,000
Total Street Maintenance Capital Projects [-$ 19,523,000
101
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
(FY 2013/14- 2017/18)
Unfunded
Project ID No.: U.STR.0001
Project Number:
Project Type: Lakeshore Drive Widening and Street Lighting
Description: Widen Lakeshore Drive to provide a raised median island with landscaping and place the
historic street lights along the alignment.
Location: Lakeshore Drive, Mohr Street to Iowa Street.
Funding Source
FY 2013 -2014
FY 2014 -2015
FY 2015 -2016
FY 2016 -2017
FY 2017 -2018
Total
Design
$ 618,000
$ 2,000,000
$ 1,600,000
$ 4,218,000
Env. Permit
300,000
300,000
RM
2,000,000
2,000,000
Admin
30,000
30,000
Construction Cost
1,600,000
1,600,000
Contingency
160,000
160,000
Other
-
Total Funding
$ 618,000
$ 2,000,000
$ 1,600,000
$ -
$ -
$ 4,218,000
Project Costs
Design
$ 128,000
$ 128,000
Env. Permit
300,000
300,000
RM
2,000,000
2,000,000
Admin
30,000
30,000
Construction Cost
1,600,000
1,600,000
Contingency
160,000
160,000
Other
-
Total Project Costs
$ 618,000
$ 2,000,000
$ 1,600,000
$ -
$ -
$ 4,218,000
102
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
(FY 2013/14- 2017/18)
Unfunded
Project ID No.: U.STR.0003
Project Number:
Project Type: Camino Del Norte Roadway Connection.
Description: Construct roadway connection between Main Street and the Franklin Street Bridge to
provide an alternate route to 1 -15.
Location: Camino Del Norte from Main Street to Franklin Street.
Funding Source
FY 2013 -2014
FY 2014 -2015
FY 2015 -2016
FY 2016 -2017
FY 2017 -2018
Total
Design
$ 2,980,000
$ 2,250,000
$ 5,230,000
Env. Permit
300,000
300,000
RNV
-
Admin
2,000,000
2,000,000
Construction Cost
2,250,000
2,250,000
Contingency
200,000
200,000
Other
200,000
200,000
Total Funding
$ 2,980,000
$ 2,250,000
$ -
$ -
$ -
$ 5,230,000
Project Costs
Design
$ 280,000
$ 280,000
Env. Permit
300,000
300,000
RNV
-
Admin
2,000,000
2,000,000
Construction Cost
2,250,000
2,250,000
Contingency
200,000
200,000
Other
200,000
200,000
Total Project Costs
$ 2,980,000
$ 2,250,000
$ -
$ -
$ -
$ 5,230,000
103
City of Lake Elsinore
FY 2008/09 - 2012/13 Capital Improvement Program
Project Description
(FY 2013/14- 2017/18)
Unfunded
Project ID No.: U.STR.0004
Project Number:
Project Type: Graham Avenue Reconstruction.
Description: Reconstruct the Graham Avenue Roadway between Main Street and Chestnut Street
including curb and gutter.
Location: Graham Avenue between Main Street and Chestnut Street
Funding Source
FY 2013 -2014
FY 2014 -2015
FY 2015 -2016
FY 2016 -2017
FY 2017 -2018
Total
Design
$ 60,000
$ 250,000
$ 310,000
Env. Permit
5,000
5,000
RAN
-
Admin
10,000
10,000
Construction Cost
250,000
250,000
Contingency
25,000
25,000
Other
-
Total Funding
$ 60,000
$ 250,000
$ -
$ -
$ -
$ 310,000
Project Costs
Design
$ 20,000
$ 20,000
Env. Permit
5,000
5,000
RAN
-
Admin
10,000
10,000
Construction Cost
250,000
250,000
Contingency
25,000
25,000
Other
-
Total Project Costs
$ 60,000
$ 250,000
$ -
$ -
$ -
$ 310,000
104
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
(FY 2013114 - 2017/18)
Unfunded
Project ID No.: U.STR.0005
Project Number:
Project Type: Ellis Street Reconstruction
Description: Reconstruct the Ellis Street Roadway between Heald Avenue and Flint Street, including
curb and gutter.
Location: Ellis Street from Heald Avenue to Flint Street.
Funding Source
FY 2013 -2014
FY 2014 -2015
FY 2015 -2016
FY 2016 -2017
FY 2017 -2018
Total
Design
$ 205,000
$ 205,000
Env. Permit
5,000
5,000
R1W
-
Admin
10,000
10,000
Construction Cost
160,000
160,000
Contingency
15,000
15,000
Other
-
Total Funding
1 $ 205,000
$ -
1 $ -
$ -
$ -
$ 205,000
Project Costs
Design
$ 15,000
$ 15,000
Env. Permit
5,000
5,000
R1W
-
Admin
10,000
10,000
Construction Cost
160,000
160,000
Contingency
15,000
15,000
Other
-
Total Project Costs
$ 205,000
$ -
$ -
$ -
$ -
$ 205,000
105
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
(FY 2013/14- 2017/18)
Unfunded
Project ID No.: U.STR.0006
Project Number:
Project Type: Nichols Road Improvements.
Description: Construct a two lane roadway with intersection enhancements for left turn pockets.
Roadway shall include two (2) twelve foot lanes and a five (5) foot shoulder on each side.
Location: Nichols Road from 1 -15 to El Toro Road.
Funding Source
FY 2013 -2014
FY 2014 -2015
FY 2015 -2016
FY 2016 -2017
FY 2017 -2018
Total
Design
$ 430,000
$ 770,000
$ 1,200,000
Env. Permit
300,000
300,000
RM
-
Admin
30,000
30,000
Construction Cost
700,000
700,000
Contingency
70,000
70,000
Other
-
Total Funding
$ 430,000
$ 770,000
$ -
$ -
$ -
$ 1,200,000
Project Costs
Design
$ 100,000
$ 100,000
Env. Permit
300,000
300,000
RM
-
Admin
30,000
30,000
Construction Cost
700,000
700,000
Contingency
70,000
70,000
Other
-
Total Project Costs
$ 430,000
$ 770,000
$ -
$ -
$ -
$ 1,200,000
106
City of Lake Elsinore
FY 2008/09 - 2012/13 Capital Improvement Program
Project Description
(FY 2013/14- 2017/18)
Unfunded
Project ID No.: U.STR.0007
Project Number:
Project Type: Reid Street Improvements
Description: Construct a two lane roadway including two 12 -foot lanes and a 5 -foot graded shoulder on
each side.
Location: Reid Street from Strickland Avenue to Dempsey Avenue.
Funding Source
FY 2013 -2014
FY 2014 -2015
FY 2015 -2016
FY 2016 -2017
FY 2017 -2018
Total
Design
$ 234,000
$ 400,000
$ 634,000
Env. Permit
150,000
150,000
R/W
-
Admin
20,000
20,000
Construction Cost
400,000
400,000
Contingency
40,000
40,000
Other
-
Total Funding
$ 234,000
$ 400,000
$ -
$ -
$ -
$ 634,000
Project Costs
Design
$ 24,000
$ 24,000
Env. Permit
150,000
150,000
R/W
-
Admin
20,000
20,000
Construction Cost
400,000
400,000
Contingency
40,000
40,000
Other
-
Total Project Costs
1 $ 234,000
$ 400,000
1 $ -
$ -
$ -
$ 634,000
107
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
(FY 2013/14- 2017/18)
Unfunded
Project ID No.: U.STR.0010
Project Number:
Project Type: Gunnerson Avenue Roadway Reconstruction.
Description: Reconstruct Gunnerson Street including minor drainage improvements.
Location: Gunnerson Avenue from Lakeshore Drive to Riverside Drive.
Funding Source
FY 2013 -2014
FY 2014 -2015
FY 2015 -2016
FY 2016 -2017
FY 2017 -2018
Total
Design
$ 265,000
$ 1,120,000
$ 1,385,000
Env. Permit
5,000
5,000
R/W
-
Admin
35,000
35,000
Construction Cost
1,120,000
1,120,000
Contingency
110,000
110,000
Other
-
Total Funding
$ 265,000
$ 1,120,000
$ -
$ -
$ -
$ 1,385,000
Project Costs
Design
$ 115,000
$ 115,000
Env. Permit
5,000
5,000
R/W
-
Admin
35,000
35,000
Construction Cost
1,120,000
1,120,000
Contingency
110,000
110,000
Other
-
Total Project Costs
$ 265,000
$ 1,120,000
$ -
$ -
$ -
$ 1,385,000
108
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
(FY 2013/14- 2017/18)
Unfunded
Project ID No.: U.STR.0011
Project Number:
Project Type: Oakview Way /Beechwood Lane Street Repair and Drainage Improvement.
Description: Reconstruct Oakview Way /Beechwood Lane including minor drainage improvements.
Location: Oakview Way /Beechwood Lane
Funding Source
FY 2013 -2014
FY 2014 -2015
FY 2015 -2016
FY 2016 -2017
FY 2017 -2018
Total
Design
$ 374,000
$ 374,000
Env. Permit
5,000
5,000
RM
-
Admin
15,000
15,000
Construction Cost
300,000
300,000
Contingency
30,000
30,000
Other
-
Total Funding
$ 374,000
$ -
$ -
$ -
$ -
$ 374,000
Project Costs
Design
$ 24,000
$ 24,000
Env. Permit
5,000
5,000
RM
-
Admin
15,000
15,000
Construction Cost
300,000
300,000
Contingency
30,000
30,000
Other
-
Total Project Costs
$ 374,000
1 $ -
$ -
$ -
$ -
$ 374,000
109
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
(FY 2013/14- 2017/18)
Unfunded
Project ID No.: U.STR.0012
Project Number:
Project Type: Larson Road Overlay.
Description: Replace existing pavement and provide new asphalt pavement and drainage
improvements.
Location: Larson Road from Machado Street to a distance 1,100 -feet east of Machado Street.
Funding Source
FY 2013 -2014
FY 2014 -2015
FY 2015 -2016
FY 2016 -2017
FY 2017 -2018
Total
Design
$ 300,000
$ 300,000
Env. Permit
5,000
5,000
R/W
5,000
5,000
Admin
12,000
12,000
Construction Cost
230,000
230,000
Contingency
23,000
23,000
Other
-
Total Funding
$ 300,000
$ -
$ -
$ -
$ -
$ 300,000
Project Costs
Design
$ 25,000
$ 25,000
Env. Permit
5,000
5,000
R/W
5,000
5,000
Admin
12,000
12,000
Construction Cost
230,000
230,000
Contingency
23,000
23,000
Other
-
Total Project Costs
$ 300,000
$ -
$ -
$ -
$ -
$ 300,000
110
City of Lake Elsinore
FY 2008/09 - 2012/13 Capital Improvement Program
Project Description
(FY 2013/14 - 2017/18)
Unfunded
Project ID No.: U.STR.0014
Project Number:
Project Type: Grand Avenue Overlay
Description: Replace existing pavement and provide new asphalt pavement and traffic striping.
Location: Grand Avenue from Machado Street to Riverside Drive.
Funding Source
FY 2013 -2014
FY 2014 -2015
FY 2015 -2016
FY 2016 -2017
FY 2017 -2018
Total
Design
$ 1,125,000
$ 1,125,000
Env. Permit
5,000
5,000
R/W
-
Admin
55,000
55,000
Construction Cost
895,000
895,000
Contingency
90,000
90,000
Other
-
Total Funding
$ 1,125,000
1 $ -
$ -
$ -
$ -
$ 1,125,000
Project Costs
Design
$ 80,000
$ 80,000
Env. Permit
5,000
5,000
R/W
-
Admin
55,000
55,000
Construction Cost
895,000
895,000
Contingency
90,000
90,000
Other
-
Total Project Costs
$ 1,125,000
$ -
$ -
$ -
$ -
$ 1,125,000
111
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
(FY 2013114 - 2017/18)
Unfunded
Project ID No.: U.STR.0015
Project Number:
Project Type: Lakeshore Drive Overlay.
Description: Replace existing pavement and provide new asphalt pavement and traffic striping.
Location: Lakeshore Drive from Machado Street to Riverside Drive.
Funding Source
FY 2013 -2014
FY 2014 -2015
FY 2015 -2016
FY 2016 -2017
FY 2017 -2018
Total
Design
$ 160,000
$ 1,320,000
$ 1,480,000
Env. Permit
5,000
5,000
R/W
-
Admin
70,000
70,000
Construction Cost
1,200,000
1,200,000
Contingency
120,000
120,000
Other
-
Total Funding
$ 160,000t—$717,320,000
$ 1,320,000
$ -
$ -
$ -
$ 1,480,000
Project Costs
Design
$ 85,000
$ 85,000
Env. Permit
5,000
5,000
R/W
-
Admin
70,000
70,000
Construction Cost
1,200,000
1,200,000
Contingency
120,000
120,000
Other
-
Total Project Costs
$ 160,000
$ 1,320,000
$ -
$ -
$ -
$ 1,480,000
112
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
(FY 2013/14- 2017/18)
Unfunded
Project ID No.: U.STR.0016
Project Number:
Project Type: Drainage Improvements at Limited and Spring.
Description: Construct drainage improvements at the corner of Limited Avenue and Spring Street to
address ponding issues at this location.
Location: Northeast and northwest corner of Limited Avenue and Spring Street.
Funding Source
FY 2013 -2014
FY 2014 -2015
FY 2015 -2016
FY 2016 -2017
FY 2017 -2018
Total
Design
$ 50,000
$ 50,000
Env. Permit
1,000
1,000
R/W
-
Admin
1,500
1,500
Construction Cost
40,000
40,000
Contingency
4,000
4,000
Other
-
Total Funding
$ 50,000
$ -
$ -
$ -
$ -
$ 50,000
Project Costs
Design
$ 3,500
$ 3,500
Env. Permit
1,000
1,000
R/W
-
Admin
1,500
1,500
Construction Cost
40,000
40,000
Contingency
4,000
4,000
Other
-
Total Project Costs
$ 50,000
$ -
$ -
$ -
$ -
$ 50,000
113
City of Lake Elsinore
FY 2008/09 - 2012/13 Capital Improvement Program
Project Description
(FY 2013/14- 2017/18)
Unfunded
Project ID No.: U.STR.0018
Project Number:
Project Type: Railroad Canyon Road Westbound Lane Extension
Description: Extend the number three (3) lane on westbound Railroad Canyon Road to complete the
missing segment.
Location: Westbound Railroad Canyon Road between Grape Street and Canyon Estates Drive
Funding Source
FY 2013 -2014
FY 2014 -2015
FY 2015 -2016
FY 2016 -2017
FY 2017 -2018
Total
Design
$ 301,000
$ 301,000
Env. Permit
-
R/W
-
Admin
14,800
14,800
Construction Cost
242,000
242,000
Contingency
24,200
24,200
Other
-
Total Funding
$ 301,000
$ -
$ -
$ -
$ -
$ 301,000
Project Costs
Design
$ 20,000
$ 20,000
Env. Permit
-
R/W
-
Admin
14,800
14,800
Construction Cost
242,000
242,000
Contingency
24,200
24,200
Other
-
Total Project Costs
$ 301,000
$ -
$ -
$ -
$ -
$ 301,000
114
City of Lake Elsinore
FY 2008/09 - 2012/13 Capital Improvement Program
Project Description
(FY 2013/14 - 2017118)
Unfunded
Project ID No.: U.STR.0019
Project Number:
Project Type: Right -of -way acquisition and roadway construction for eastbound Machado Street
Description: Acquire right -of -way and complete roadway construction on eastbound Machado Street
Location: Eastbound Machado Street near LeHarve Avenue
Funding Source
FY 2013 -2014
FY 2014 -2015
FY 2015 -2016
FY 2016 -2017
FY 2017 -2018
Total
Design
$ 78,000
$ 78,000
Env. Permit
-
R/W
30,000
30,000
Admin
3,000
3,000
Construction Cost
40,000
40,000
Contingency
2,000
2,000
Other
-
Total Funding
$ 78,000
$ -
$ -
$ -
$ -
$ 78,000
Project Costs
Design
$ 3,000
$ 3,000
Env. Permit
-
R/W
30,000
30,000
Admin
3,000
3,000
Construction Cost
40,000
40,000
Contingency
2,000
2,000
Other
-
Total Project Costs
$ 78,000
$ -
$ -
$ -
$ -
$ 78,000
115
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
(FY 2013/14- 2017118)
Unfunded
Project ID No.: U.STR.0021
Project Number:
Project Type: Roadway Paving- Diamond Drive
Description: Repair and overlay Diamond Drive from Pete Lier Drive to Malaga Road.
Location: Diamond Drive from Pete Lehr Drive to Malaga Road
Funding Source
FY 2013 -2014
FY 2014 -2015
FY 2015 -2016
FY 2016 -2017
FY 2017 -2018
Total
Design
$ 727,000
$ 727,000
Env. Permit
-
R/W
-
Admin
13,400
13,400
Construction Cost
636,000
636,000
Contingency
63,600
63,600
Other
-
Total Funding
$ 727,000
$ -
$ -
$ -
$ -
$ 727,000
Project Costs
Design
$ 14,000
$ 14,000
Env. Permit
-
R/W
-
Admin
13,400
13,400
Construction Cost
636,000
636,000
Contingency
63,600
63,600
Other
-
Total Project Costs
$ 727,000
$ -
$ -
$ -
$ -
$ 727,000
116
City of Lake Elsinore
FY 2008/09 - 2012/13 Capital Improvement Program
Project Description
(FY 2013/14- 2017/18)
Unfunded
Project ID No.: U.STR.0023
Project Number:
Project Type: Roadway Paving - Kellog Street
Description: Pave Kellog Street between Graham Avenue and Flint Street.
Location: Kellog Street between Graham Avenue and Flint Street
Funding Source
FY 2013 -2014
FY 2014 -2015
FY 2015 -2016
FY 2016 -2017
FY 2017 -2018
Total
Design
$ 790,000
$ 790,000
Env. Permit
-
R/W
-
Admin
10,000
10,000
Construction Cost
698,000
698,000
Contingency
70,000
70,000
Other
-
Total Funding
$ 790,000
1 $ -is
-
$ -
$ -
$ 790,000
Project Costs
Design
$ 12,000
$ 12,000
Env. Permit
-
R/W
-
Admin
10,000
10,000
Construction Cost
698,000
698,000
Contingency
70,000
70,000
Other
-
Total Project Costs
1 $ 790,000
$ -
1 $ -
1 $ -
1 $ -
I $ 790,000
117
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
(FY 2013114- 2017/18)
Unfunded
Project ID No.: U.STR.0024
Project Number:
Project Type: Roadway Re- construction -Lake Crest Drive
Description: Reconstruct Lake Crest Drive from the Cul -de -sac to Dolly Drive
Location: Lake Crest Drive from Cul -de -sac to Dolly Drive
Funding Source
FY 2013 -2014
FY 2014 -2015
FY 2015 -2016
FY 2016 -2017
FY 2017 -2018
Total
Design
$ 100,000
$ 100,000
Env. Permit
-
R/W
-
Admin
6,000
6,000
Construction Cost
81,000
81,000
Contingency
8,500
8,500
Other
-
Total Funding
$ 100,000
$ -
$ -
$ -
$ -
$ 100,000
Project Costs
Design
$ 4,500
$ 4,500
Env. Permit
-
R/W
-
Admin
6,000
6,000
Construction Cost
81,000
81,000
Contingency
8,500
8,500
Other
-
Total Project Costs
$ 100,000
$ -
$ -
$ -
$ -
$ 100,000
118
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
(FY 2013114- 2017/18)
Unfunded
Project ID No.: U.STR.0026
Project Number:
Project Type: Collier Avenue Median Landscaping
Description: Install landscaping and irrigation in the medians along Collier Avenue adjacent to the outlet
mall.
Location: Collier Avenue between Nichols Road and Riverside Drive.
Funding Source
FY 2013 -2014
FY 2014 -2015
FY 2015 -2016
FY 2016 -2017
FY 2017 -2018
Total
Design
$ 355,000
$ 355,000
Env. Permit
5,000
5,000
RNV
-
Admin
13,000
13,000
Construction Cost
285,000
285,000
Contingency
27,000
27,000
Other
-
ITotal Funding
$ 355,000
$ -
$ -
$ -
$ -
$ 355,000
Project Costs
Design
$ 25,000
$ 25,000
Env. Permit
5,000
5,000
RNV
-
Admin
13,000
13,000
Construction Cost
285,000
285,000
Contingency
27,000
27,000
Other
-
Total Project Costs
1 $ 355,000
1 $ -
$ -
$ -
$ -
$ 355,000
119
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
(FY 2013/14- 2017/18)
Unfunded
Project ID No.: U.STR.0027
Project Number:
Project Type: Lakeshore Drive - Graham Avenue to Chaney Street Bike Path
Description: Extend Class II Bike Path on Lakeshore Drive from Graham Avenue to Chaney Street
Location: Lakeshore Drive from Graham Avenue to Chaney Street
Funding Source
FY 2013 -2014
FY 2014 -2015
FY 2015 -2016
FY 2016 -2017
FY 2017 -2018
Total
Design
$ 101,000
$ 101,000
Env. Permit
-
R/W
-
Admin
8,000
8,000
Construction Cost
79,000
79,000
Contingency
7,900
7,900
Other
-
Total Funding
$ 101,000
$ -
$ -
$ -
$ -
$ 101,000
Project Costs
Design
$ 6,100
$ 6,100
Env. Permit
-
R/W
-
Admin
8,000
8,000
Construction Cost
79,000
79,000
Contingency
7,900
7,900
Other
-
Total Project Costs
$ 101,000
$ -
$ -
$ -
$ -
$ 101,000
120
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
(FY 2013/14- 2017/18)
Unfunded
Project ID No.: U.STR.0028
Project Number:
Project Type: Elm Street Paving
Description: Place asphalt paving on Elm Street.
Location: Elm Street: Lakeshore Dr. to end of street.
Funding Source
FY 2013 -2014
FY 2014 -2015
FY 2015 -2016
FY 2016 -2017
FY 2017 -2018
Total
Design
$ 150,000
$ 150,000
Env. Permit
10,000
10,000
R1W
-
Admin
8,000
8,000
Construction Cost
100,000
100,000
Contingency
10,000
10,000
Other
-
Total Funding
$ 150,000
$
$ -
$ -
$ -
$ 150,000
Project Costs
Design
$ 22,000
$ 22,000
Env. Permit
10,000
10,000
R1W
-
Admin
8,000
8,000
Construction Cost
100,000
100,000
Contingency
10,000
10,000
Other
-
Total Project Costs
$ 150,000
$ -
$ -
$ -
$ -
$ 150,000
121
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
(FY 2013114- 2017/18)
Unfunded
Project ID No.: U.STR.0030
Project Number:
Project Type: Underground Street Light Wiring
Description: To place electrical wires underground for Main Street.
Location: Main Street: 1/15 to Graham.
Funding Source
FY 2013 -2014
FY 2014 -2015
FY 2015 -2016
FY 2016 -2017
FY 2017 -2018
Total
Design
$ 260,000
$ 260,000
Env. Permit
-
R/W
-
Admin
12,000
12,000
Construction Cost
180,000
180,000
Contingency
18,000
18,000
Other
'
Total Funding
$ 260,000
$ -
$ -
$ -
$ -
$ 260,000
Project Costs
Design
$ 50,000
$ 50,000
Env. Permit
-
R/W
-
Admin
12,000
12,000
Construction Cost
180,000
180,000
Contingency
18,000
18,000
Other
'
Total Project Costs
$ 260,000
$ -
$ -
$ -
$ -
$ 260,000
123
Five Year Capital Improvement Unfunded Projects Listing 2013/2014 through 2017/2018
Traffic Unfunded Capital Projects
Project ID Nn • Project Title Estimated Total
U.TRF.0001
Traffic Signal
Installation, Main St. at Lakeshore Dr.
$
210,000
U.TRF.0002
Terra Cotta Road Street Closure.
$
100,000
U.TRF.0003
Traffic Signal
Installation, Main St. at Graham Ave.
$
225,000
U.TRF.0004
Traffic Signal
Installation, Grand Ave. at Macy St.
$
240,000
U.TRF.0005
Traffic Signal
Installation, Grand Ave. at Riverside Dr.
$
250,000
U.TRF.0006
Traffic Signal
Installation, Summerhill Ave. at La Strada
$
240,000
U.TRF.0007
Traffic Signal
Installation, Spring St. at Graham Ave.
$
225,000
U.TRF.0008
JTraffic Signal
Installation, Gunnerson Ave. at Riverside St.
$
225,000
U.TRF.0009
ITraffic Safety for Schools
$
50,000
Total Unfunded Traffic Capital Projectsi $ 1,765,000
125
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
(FY 2013/14 - 2017/18)
Unfunded
Project ID No.: U.TRF.0001
Project Number:
Project Type: Traffic Signal Installation, Main St. at Lakeshore Dr.
Description: Install a traffic signal at the intersection of Main Street and Lakeshore Drive. A traffic
signal warrant study has been conducted and a signal is warranted at this location.
Location: Main Street and Lakeshore Drive.
Funding Source
FY 2013-
2014
FY 2014-
2015
FY 2015-
2016
FY 2016-
2017
FY 2017 -
2018
Total
Design
$ 210,000
$ 210,000
Env. Permit
5,000
5,000
R/W
-
Admin
5,000
5,000
Construction Cost
170,000
170,000
Contingency
20,000
20,000
Other
-
Total Funding
$ 210,000
$ -
$ -
$ -
$ -
$ 210,000
Project Costs
Design
$ 10,000
$ 10,000
Env. Permit
5,000
5,000
R/W
-
Admin
5,000
5,000
Construction Cost
170,000
170,000
Contingency
20,000
20,000
Other
-
Total Project Costs
$ 210,000--1—$
-
$ -
$ -
$ -
$ 210,000
126
City of Lake Elsinore
FY 2008109- 2012/13 Capital Improvement Program
Project Description
(FY 2013/14 - 2017/18)
Unfunded
Project ID No.: U.TRF.0002
Project Number:
Project Type: Terra Cotta Road Street Closure.
Description: Close Terra Cotta Road at the intersection with Lakeshore Drive to provide alternative
circulation with improved sight distance.
Location: Intersection of Terra Cotta (south) and Lakeshore Drive.
Funding Source
FY 2013-
2014
FY 2014-
2015
FY 2015-
2016
FY 2016-
2017
FY 2017 -
2018
Total
Design
$ 100,000
$ 100,000
Env. Permit
5,000
5,000
RM
30,000
30,000
Admin
5,000
5,000
Construction Cost
45,000
45,000
Contingency
5,000
5,000
Other
-
Total Funding
$ 100,000
$ -
$ -
$ -
$ -
$ 100,000
Project Costs
Design
$ 10,000
$ 10,000
Env. Permit
5,000
5,000
RM
30,000
30,000
Admin
5,000
5,000
Construction Cost
45,000
45,000
Contingency
5,000
5,000
Other
-
Total Project Costs
$ 100,000
$ -
$ -
$ -
$ -
$ 100,000
127
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
(FY 2013/14- 2017/18)
Unfunded
Project ID No.: U.TRF.0003
Project Number:
Project Type: Traffic Signal Installation, Main St. at Graham Ave.
Description: Install a traffic signal at the intersection of Main Street and Graham Avenue.
Location: Intersection of Main Street and Graham Avenue.
Funding Source
FY 2013-
2014
FY 2014-
2015
FY 2015-
2016
FY 2016-
2017
FY 2017 -
2018
Total
Design
$ 225,000
$ 225,000
Env. Permit
5,000
5,000
R/W
-
Admin
5,000
5,000
Construction Cost
170,000
170,000
Contingency
20,000
20,000
Other
-
Total Funding
$ 225,000
$ -
$ -
$ -
$ -
$ 225,000
Project Costs
Design
$ 25,000
$ 25,000
Env. Permit
5,000
5,000
R/W
-
Admin
5,000
5,000
Construction Cost
170,000
170,000
Contingency
20,000
20,000
Other
-
Total Project Costs
1 $ 225,000
$ -
1 $ -
$ -
$ -
1 $ 225,000
128
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
(FY 2013/14- 2017/18)
Unfunded
Project ID No.: U.TRF.0004
Project Number:
Project Type: Traffic Signal Installation, Grand Ave. at Macy St.
Description: Install a traffic signal at the intersection of Grand Avenue and Macy Street.
Location: Intersection of Grand Avenue and Macy Street.
Funding Source
FY 2013-
2014
FY 2014-
2015
FY 2015-
2016
FY 2016-
2017
FY 2017 -
2018
Total
Design
$ 240,000
$ 240,000
Env. Permit
5,000
5,000
R/W
-
Admin
5,000
5,000
Construction Cost
185,000
185,000
Contingency
20,000
20,000
Other
I
I
I
I
I
I -
Total Funding
$ 240,000
$ -
$ -
$ -
$ -
$ 240,000
Project Costs
Design
$ 25,000
$ 25,000
Env. Permit
5,000
5,000
R/W
-
Admin
5,000
5,000
Construction Cost
185,000
185,000
Contingency
20,000
20,000
Other
I
I
I
I
I
I -
Total Project Costs
1 $ 240,000
$ -
$ -
1 $ -
1 $ -
1 $ 240,000
129
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
(FY 2013/14 - 2017/18)
Unfunded
Project ID No.: U.TRF.0005
Project Number:
Project Type: Traffic Signal Installation, Grand Ave. at Riverside Dr.
Description: Install a traffic signal at the intersection of Grand Avenue and Riverside Drive.
Location: Intersection of Grand Avenue and Riverside Drive.
Funding Source
FY 2013-
2014
FY 2014-
2015
FY 2015-
2016
FY 2016-
2017
FY 2017 -
2018
Total
Design
$ 250,000
$ 250,000
Env. Permit
5,000
5,000
R/W
-
Admin
5,000
5,000
Construction Cost
200,000
200,000
Contingency
15,000
15,000
Other
10,000
10,000
Total Funding
$ 250,000
$ -
$ -
$ -
$ -
$ 250,000
Project Costs
Design
$ 15,000
$ 15,000
Env. Permit
5,000
5,000
R/W
-
Admin
5,000
5,000
Construction Cost
200,000
200,000
Contingency
15,000
15,000
Other
10,000
10,000
Total Project Costs
$ 250,000
$ -
$ -
$ -
$ -
$ 250,000
130
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
(FY 2013/14 - 2017/18)
Unfunded
Project ID No.: U.TRF.0006
Project Number:
Project Type: Traffic Signal Installation, Summerhill Ave. at La Strada
Description: Install a traffic signal at the intersection of Summerhill Drive and La Strada.
Location: Intersection of Summerhill Drive and La Strada.
Funding Source
FY 2013-
2014
FY 2014-
2015
FY 2015-
2016
FY 2016-
2017
FY 2017 -
2018
Total
Design
$ 240,000
$ 240,000
Env. Permit
5,000
5,000
R/W
-
Admin
5,000
5,000
Construction Cost
185,000
185,000
Contingency
20,000
20,000
Other
-
Total Funding
$ 240,000
$ -
$ -
$ -
$ -
$ 240,000
Project Costs
Design
$ 25,000
$ 25,000
Env. Permit
5,000
5,000
R/W
-
Admin
5,000
5,000
Construction Cost
185,000
185,000
Contingency
20,000
20,000
Other
-
Total Project Costs
1 $ 240,000
$ -
$ -
$ -
$ -
$ 240,000
131
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
(FY 2013/14- 2017/18)
Unfunded
Project ID No.: U.TRF.0007
Project Number:
Project Type: Traffic Signal Installation, Spring St. at Graham Ave.
Description: Install a traffic signal at the intersection of Spring Street and Graham Avenue.
Location: Intersection of Spring Street and Graham Avenue.
Funding Source
FY 2013-
2014
FY 2014-
2015
FY 2015-
2016
FY 2016-
2017
FY 2017 -
2018
Total
Design
$ 225,000
$ 225,000
Env. Permit
5,000
5,000
RNV
-
Admin
5,000
5,000
Construction Cost
170,000
170,000
Contingency
20,000
20,000
Other
-
Total Funding
$ 225,000
$ -
$ -
$ -
$ -
$ 225,000
Project Costs
Design
$ 25,000
$ 25,000
Env. Permit
5,000
5,000
RNV
-
Admin
5,000
5,000
Construction Cost
170,000
170,000
Contingency
20,000
20,000
Other
-
Total Project Costs
1 $ 225,000
$ -
$ -
1 $ -
1 $ -
$ 225,000
132
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
(FY 2013/14- 2017/18)
Unfunded
Project ID No.: U.TRF.0008
Project Number:
Project Type: Traffic Signal Installation, Gunnerson Ave. at Riverside St.
Description: Install a traffic signal at the intersection of Gunnerson Street and Riverside Drive.
Location: Intersection of Gunnerson Street and Riverside Drive.
Funding Source
FY 2013-
2014
FY 2014-
2015
FY 2015-
2016
FY 2016-
2017
FY 2017 -
2018
Total
Design
$ 225,000
$ 225,000
Env. Permit
5,000
5,000
R/W
-
Admin
5,000
5,000
Construction Cost
170,000
170,000
Contingency
20,000
20,000
Other
-
Total Funding
$ 225,000
$ -
$ -
$ -
$ -
$ 225,000
Project Costs
Design
$ 25,000
$ 25,000
Env. Permit
5,000
5,000
R/W
-
Admin
5,000
5,000
Construction Cost
170,000
170,000
Contingency
20,000
20,000
Other
-
Total Project Costs Is
225,000—r$
-
$ -
$ -
$ -
$ 225,000
133
Five Year Capital Improvement Unfunded Projects Listing 2013/2014 through 2017/2018
Unfunded Drainage Projects
Project ID No.1 Project Title Estimated Total
U.DRN.0002
Mill Street/Avenue 6 Storm Drain Improvements.
$ 395,000
U.DRN.0003
Library Street Drainage Improvement
$ 75,000
U.DRN.0005
Drainage improvement at East Hill Street
$ 198,000
U.DRN.0006
Drainage improvement adjacent to the elementary school on Mill Street near Avenue 6
$ 605,000
U.DRN.0007
Drainage imp rovement on Lakeshore Drive between San Jacinto River Bridge and High Street
$ 605,000
Total Unfunded Drainage Projects 1,878,000
135
City of Lake Elsinore
FY 2008/09- 2012113 Capital Improvement Program
Project Description
(FY 2013/14- 2017/18)
Unfunded
Project ID No.: U.DRN.0002
Project Number:
Project Type: Mill Street/Avenue 6 Storm Drain Improvements.
Description: Construct improved drainage facility to promote the conveyance of storm waters through
the area.
Location: Between Mill Street and Park Way east of Avenue 6.
Funding Source
2014
2014/2015
2015/2016
2016/2017
2017/2018
Total
Design
$ 395,000
$ 395,000
Env. Permit
5,000
5,000
R/W
-
Admin
15,000
15,000
Construction Cost
300,000
300,000
Contingency
30,000
30,000
Other
-
Total Funding
$ 395,000
$ -
$ -
$ -
$ -
$ 395,000
Project Costs
Design
$ 45,000
$ 45,000
Env. Permit
5,000
5,000
R/W
-
Admin
15,000
15,000
Construction Cost
300,000
300,000
Contingency
30,000
30,000
Other
-
Total Project Costs
$ 395,000
1 $ -
$ -
$ -
$ -
$ 395,000
136
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
(FY 2013/14- 2017/18)
Unfunded
Project ID No.: U.DRN.0003
Project Number:
Project Type: Library Street Drainage Improvement
Description: Construct drainage improvements to direct storm water such that it remains within the
public right -of -way.
Location: Library Street between Main Street and Spring Street.
Funding Source
2014
2014/2015
2015/2016
2016/2017
2017/2018
Total
Design
$ 75,000
$ 75,000
Env. Permit
5,000
5,000
RNV
-
Admin
5,000
5,000
Construction Cost
45,000
45,000
Contingency
5,000
5,000
Other
-
Total Funding
$ 75,000
$ -
$ -
$ -
$ -
$ 75,000
Project Costs
Design
$ 15,000
$ 15,000
Env. Permit
5,000
5,000
RNV
-
Admin
5,000
5,000
Construction Cost
45,000
45,000
Contingency
5,000
5,000
Other
-
Total Project Costs
$ 75,000
$ -
$ -
$ -
$ -
$ 75,000
137
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
(FY 2013/14- 2017/18)
Unfunded
Project ID No.: U.DRN.0005
Project Number:
Project Type: Drainage improvement at East Hill Street
Description: Repair roadway slope such that water is conveyed to the storm drain inlet.
Location: East Hill Street at Franklin Avenue
Funding Source
2014
201412015
2015/2016
2016/2017
2017/2018
Total
105 - Misc. Gen. Proj.
$ 198,000
$ 198,000
Env. Permit
-
R/W
-
Admin
7,600
7,600
Construction Cost
164,000
164,000
Contingency
16,400
16,400
Other
-
Total Funding
$ 198,000
$ -
$ -
$ -
$ -
$ 198,000
Project Costs
Design
$ 10,000
$ 10,000
Env. Permit
-
R/W
-
Admin
7,600
7,600
Construction Cost
164,000
164,000
Contingency
16,400
16,400
Other
-
Total Project Costs
$ 198,000
$ -
$ -
$ -
$ -
$ 198,000
138
City of Lake Elsinore
FY 2008/09- 2012/13 Capital Improvement Program
Project Description
(FY 2013/14- 2017/18)
Unfunded
Project ID No.: U.DRN.0006
Project Number:
Project Type: Drainage improvement adjacent to the elementary school on Mill Street near Avenue 6
Description: Repair drainage system in and along Mill Street behind the elementary school such that
water is conveyed to the public right -of -way.
Location: Mill Street near Avenue 6 behind the elementary school.
Funding Source
2014
2014/2015
2015/2016
2016/2017
2017/2018
Total
105 - Misc. Gen. Proj.
$ 605,000
$ 605,000
Env. Permit
5,600
5,600
R/W
20,000
20,000
Admin
18,000
18,000
Construction Cost
465,000
465,000
Contingency
46,400
46,400
Other
-
Total Funding
$ 605,000
$ -
$ -
$ -
$ -
$ 605,000
Project Costs
Design
$ 50,000
$ 50,000
Env. Permit
5,600
5,600
R/W
20,000
20,000
Admin
18,000
18,000
Construction Cost
465,000
465,000
Contingency
46,400
46,400
Other
-
Total Project Costs
$ 605,000
$ -
$ -
$ -
$ -
$ 605,000
139
CZ 1,
bul.nM 14611 laaJ3S punoJ6Ja u
P fl
0£00'i:I1S'fl
ZZ6
6Z6
sluawnuoW �(anJnS
6Z00'2�1S'n
OZ6
6ulAed 199AS wig
yled a�i18 3aaJlS � euey� of anuany wegeJO -anup aJOgsaNel
8Z00'�I1S'n
LZ00'2i1S -n
61,6
buldeospuel uelpaW anuany Jaglo0
9Z00'�as -n
211,
anlJO 3saJo oNe1- uo1lonJisuoo -a� �(emPeo8
tbZ00'81S'fl
L 6 [
laaJlS 60119>{- 6ulned Aempeo8
£Z00'N1S'fl
96 6
aA1Ja puowela- 6ulned AempeoN
6Z0081S'fl
9 6 6
IS opeyoeW punoglsea Jol -isuoo AempeoJ boe Aem- jo- jy618
61002i1S'fl
14 6
uolsu9lx3 auel punoglseM peon uoAueo pealle8
g 600'2i1S'fl
£6
6uudS pue pailwll le sluawanoJdwl a6euleJQ
g600'N1S'n
Z 6 6
'AelJanO anlJp aaoysa�lel
5 600'211S'n
6 6 6
�(elJanO anuany pueJO
tb6002aS'fl
066
-Aep8Ao peo�l uosJe 1
Z600'2i1S'(1
606
•dwl 96euleJp Jleda � iS auel poonnyoaa8 /�teM nnaln�leO
6 600'2ilS'fl
806
uoljonjjsuoo9H Aempeo� anuany uosJauunO
0600'H1S'n
L06
sluaivanoJdwl I99AS 13!921
L000'2i1S'fl
906
sluawanadwl peo�l sloyo!N
9000'2i1S'fl
906
uo13onJisuooa�l laaJlS s1113
9000'b1S'fl
tl06
•uoilonJlsuooa�tl anuany wegeaO
b000'2ilS'(1
£06
•uolloeuuoo AeMpeo�l alaoN laa oulwe:D
£000'2us -n
Z06
6u114611 laaJIS pue 6uluaplM anlJQ ejogsemel
6000'2 isn
1,01,
:s;oafioad /e;/deO ;uauaanoadwl jeegS
66
Jaluao Apunwwoo goue�l lllyjagly
86
sluawanoJdwl Ved yolleW -NoIMS
L6
6ulned 101 6u[NJed NJed lulode'el
96
•juawaoeldaJ wmisa�l NJed opeyoeW
96
luaweoeldaU;uewdlnb3 punoJ6Ae Id Ved iwoda�lel
V6
Hem Allaf Ved luloda� el u9y36uaJ3S
£6
Z6
i aseyd 'lauuego lagnO
uolsuedx3 Ved 40
66
E.
FM
.:
..
L8
Z 600'>i2Jd'(1
6 600'>i2Jd *n
6000'>Nd'n
8000'>121d'n
9000'>12ld'fl
9000'>i2ld *n
Z000'>i2ld'fl
6000'>i21d,n
:s;oafoad /e;/deO uo/;eaaoay pue )laed
1auue4O lalul a6paJ(l 5000'3)11'8
alepd8 ueld JalseW aNel Z000'3>11'n
II aseyd- uolle;lilgeya�l y0e98 anoJE) w13 6000'3>11'n
s ;oafoid sao nosea ogenby pue a)/ e1
s;ua;uUO to algel
WVME)O21d 1N3W3AOMdWI TdlldV3
3NONIS13 3MVI :10 Allo
sPafoad uaaal -6uo1
09 sluawanoadwl 96eu!eja 9000 - N2iO
6L elepdn ueld aalseVY 96eu!eJa 9000 - NWI
8L an!JQ aasead :uo!lonilsuooa�l Aempeo�l /Iuawanoidwl 96eu!eaQ t,000 - WIC
LL luaWanoidwl 96eu!ejQ w!jalul laailS pi£ £000 - N2K]
9L luawanoidwl 96euleaa gaol Iaa OAOJJV 2000 - NIJG
9L
:s;oaloid;endeO;uawanoadcu; oBeuieap
£L
sapejbdn Abolougoei aalua0 leinlln9
MO - N39
ZL
loafoad eouell!anjns pue 6u!iloeal !lL4eJO
5b00 - N3O
6L
uollej6!W SI0 es!jdj9lu3
bt,00 - N39
OL
loafoad tianooaH Jalses!Q pue A4!anoaS ABolougoal uo!lewjo;ul
£b00 - N3O
69
sesegoand A6010ug381 II asegd aA!le!l!ul no9-3
Zb00 - N3O
99
lob 6uXed o!Ignd IIeH Al!9-walsAS ejawe0 Al!moaS
6ti00 - N3O
L9
pie k Al!o- walsAS eaawe0 AlunoeS
Ob00 - N39
99
II asegd (SWa) welsAS luawa6eueNl luawnoOG
6£00 - N39
99
jal;ua0 suo!leaadp Aou96a9w3
8£00 - N3O
b9
((isn3-1 ql!m) wrnseuwA!D loogoS elpp!W elloo ejaal
9£00 - N39
£9
swell lel!deo luawliedaa saojnosa -1 o!lenby ig aNe-1
5£00 - N3O
Z9
swell lelldeo luawliedaa uolleajoaN pue s5IJed
t£00 - N39
69
swell lel!deo luawljedap sNjoM ollgnd
££00 - N39
09
swell lel!deo luewljedaa luawdolanaQ Al!unwwoo
Z£00 - N3O
69
swell lel!deo seomjeS aj!d
6£00 - N39
99
swell lel!deO luaweoao }u3 met le.aauaO
0£00 - N3O
L9
loafed luawaoeldaU al!S qaM
LZ00 - N90
99
uoll!s!nboy pue
9Z00 - N3O
99
sluawanoadwl bulppg aoaawwoo jo aagwego
£Z00 - N39
ti5
lo9fed'alu9O o!n!o V veld aalseyy unnoluMO(]
91,00 - N3O
£5
I asegd - )IJed 19 uo!lelS aa!d uoAueO ellasoU
L1,00 - N39
Z9
loafoad 6u!pueJ8
9600 - N3O
65
WAO walsAS uo!lewjo;ul 6ulle!d Al!unwwOO
t7600 - N3O
09
weaBoJd uo!lenJasaad aaal wled
t,000 - N39
6t'
elepdn Ueld leaauaO
£000 - N39
8t7
uo!lnq!aluoo pun-4 6u!pl!ng pue esegojnd � ooq tieaq!-1 lenuuy
1,000 - N3O
[Ai
s ;591053 ;o algel
WVME)OHd 1N3W3AOadWl "IVIldVO
3NONIS13 3MVI :10 AllO
:s ;oaload;e;!deo A;;O;eiauaO
vZ
000`OZ6 $
$
$
$
$
000`OZ6$
- $
- $
s;soO;oafoad le;ol
Jayl0
000,0E
000'06
-
oua ulluo0
000'906
000'906
-
;so0 uolloni;suo0
_
uiwpy
-
AAPA
000'0V
000`08 $
lelol
£60Z
-Z60Z Ad
Z60Z
-6602 Jld
6402
-0602 old
0602
-6002 Jld
000'0b
000`08 $
60OZ
-8002 Jlcl
80-6£-£
le 'lleAV
jeBpna
-
- $
80-4£-£ le
seoueagwn3u3
V s4so0
lenlov alld
;lwaad •nu3
000'b $
000't, $
- $
u lsaa
s;so0 ;aafo�d
000`OZ6 $
$
- $
- $
$
000`OZ6$
$
- $
Bulpund lelol
000'0V
000`08 $
lelol
£60Z
-Z60Z Ad
Z60Z
-6602 Jld
6402
-0602 old
0602
-6002 Jld
000'0b
000`08 $
60OZ
-8002 Jlcl
80-6£-£
le 'lleAV
jeBpna
-
- $
80-4£-£ le
seoueagwn3u3
V s4so0
lenlov alld
aa-� Ted - 6ZZ
0800 - 056
aoinog Bulpunj
Naed ulooul-1
Appoe; wooilsai mou;ona;suo0
•luawooeldaa wooa;sab Ved uloaul-1
6200 - >Qld
uol;duosao;oafad
weJBad;uawanojdwl lellde0 £6 /Z60Z-60 /8002 Jld
GJOUIS13 Wle-1 10 40
:uol ;eool
wol; posaa
:odA1 ;oafold
:jegwnN ;oafo.id
:'ON al;oafo,id
zz
000`Oti6 $
- $
000`09 $
- $
- $
000`08 $
- $
- $
s;soO;oafoad Ie}ol
-
Ja410
_
oua ulluoo
000`0vi,
000`09
000`08
-
lsoo uopwisuoo
_
u!wpy
-
AAM
000'09
000'09
_
;!woad 'nu3
$
000'09$
_ $
u !sad
18601
£60Z
-Z60Z AzI
Z60Z
-6602 AA
I, 1,0Z
-060Z AA
060Z
-6002 A=I
60OZ
-80OZ A=l
80-6£-£
;e •I!eny
la6png
80-6£-£ 3e
seoueagwnou3
I8 slsoa
IenjoV Mid
s4so3 ;aafoid
000`0in $
- $
000`09 $
- $
$
000'08$
- $
- $
6u!punzi Ie;ol
000'09
000'09
-
spunk !ejauaE) - g06
000'08 $
000'09$
- $
spun.1 JBao - Og 6
18601
£60Z
-Z60Z AzI
Z60Z
-6602 AA
I, 1,0Z
-060Z AA
060Z
-6002 A=I
60OZ
-80OZ A=l
80-6£-£
;e •I!eny
la6png
80-6£-£ 3e
seoueagwnou3
I8 slsoa
IenjoV Mid
aoanog Bu!pun:j
Ted aNepawwng
•bu!oejjns lua!!!sai %006 ;o uollepelsul pue walsAs
p!o jo uo!l!!owep apn!oui of loafad 'ainlonils mau yl!m welsAs bu!A!dwoo -uou palepino ooe!deu
luawaoe!daa luawd!nb3 Ae!d Ted aMepawwng
6600 - AtId
uo!lduos90 loafad
weJ6ad luai.uanadwi !el!deo £ 6/Z LOZ-60 /8002 AA
GJOUIS13 GNBI 10 40
:uo!leoo-j
uo!!aosaa
:edAl ;oafo.id
:aagwnN ;oafoad
: -ON al;oaroad
oz
000'OZ6 $
$
$
- $
- $
000`0Z6$
- $
- $
s ;soa;oafoad le;ol
_
-
Jayl0
000`06
000'01
-
oua ulluo3
000'906
000'906
-
;soo uoi;oru;suoo
_
-
ulwpy
-
-
M2l
_
000,0V
-
;iwJad -nu3
000'J7 $
000 $
- $
u lsaa
lelol
£602
-Z60Z Ad
Z60Z
-660Z Ad
6602
-060Z Ad
0602
-600Z Ad
60OZ
-90OZ Ad
80-6£-£
le'IleAV
;a6pn8
80 -6£-£ le
seouejgwnou3
V s;soa
Ienlov alld
s;soa ;oafoJd
000`oU $
- $
- $
- $
- $
000`026$
- $
- $
6ulpund le;ol
000'0b
000,0V
-
993 Ned - 2Z
000'08 $
000`08 $
$
0800 - 056
lelol
£602
-Z60Z Ad
Z60Z
-660Z Ad
6602
-060Z Ad
0602
-600Z Ad
60OZ
-90OZ Ad
80-6£-£
le'IleAV
;a6pn8
80 -6£-£ le
seouejgwnou3
V s;soa
Ienlov alld
ao.inog 6ulpund
Ved oPe4oeW
•6ulpllnq pa;ep ;no
ay; ooeldaj o; Allibel wooilsa.i mou ;oni;suoo
;uewaoelda�j woa ;sad flied opeyoeW
L 600 - Md
uol;duosaa ;oafad
weJ6ad luawanoidwl lel!deo £ 6R 60Z- 60/800Z A3
9Jouls13 a )le-I 10 14!0
:uol;eoo-1
moijasea
:adAl;oafoad
:aagwnN ;aa fo.id
:'ON al;oefoad
9L
000'8£ $
- $
000`8£ $
- $
- $
(000`8£) $
000'8£ $
- $
s;soO ;oafoad le;ol
-
-
JGglo
-
-
oua ui;uo0
-
-
;so0 uol;oni;suo0
-
-
ulwpy
-
-
MAI
-
-
;iwJad •nu3
NOV $
000'8£ $
000'8£ $
000'8£ $
- $
u lsaa
lejol
£LOZ
-ZLOZ A:l
ZLOZ
-L LOZ A:l
LLOZ
-OLOZ A:l
OLOZ
-600Z A=l
60OZ
-800Z Ad
80-6£-£
;e 'lleny
;eBpne
90-L£-£3e
seouejgwnou3
+g s;so0
len ;oy alld
s;so0;oefoJd
000'8£ $
- $
000'8£ $
- $
- $
(000'8£) $
000'8£ $
- $
Bulpunq le;ol
000'8£ $
000'8c$
(000'8£) $
000'8£ $
- $
pun.1 lejauaO - go[
lejol
£LOZ
-ZLOZ A:l
ZLOZ
-L LOZ A:l
LLOZ
-OLOZ A:l
OLOZ
-600Z A=l
60OZ
-800Z Ad
80-6£-£
;e 'lleny
;eBpne
90-L£-£3e
seouejgwnou3
+g s;so0
len ;oy alld
eoinogBulpunq
Ved;ulod ale-1 o;;uaoefpe — aJ04saW-1 OZy :uol ;eoo-I
•Bulpllnq xeuue ja;ua0 joluag jo uoisuedx3
::uo�Pjosap
Bulplln8 xeuuy uolsuedx3 Ja;ua0 MIMS :edA1 ;oafoJd
178Z17 :aagwnN ;oafojd
9000 ->Rld :'oN al ;oafo.id
uol;duosaa ;oafad
weJBad;uawanoidwl le;ldeO CUZWZ-60 /800Z Ad
GJouis13 aNe-1 10 40
v
C)
m
7rC
m
ni
A
Z
Z
o
`O.
O
0
CD
00
o+
o,
N
z
o
O
V
O
.0
N
N
�.
00
w
V
%
W
s
O
V
m
d
m
Ito
J
c
C
7
I
rr
7r
-V
0
J'
G)
rt
W
Y/
N
CD
3
3
M A
Z
-I
s
S
m
a
O
0
T
V�
�
o,
7
(D
3
�D
rn
M
a
^
M
�
rNr
N
Dpi
N
O
M
�
t
n~i
3
d
7
O
(D
Sri
�
m
V�
O
o°
0
0
0
m
-�
o°
o°
d
o°o
0
0
°
O
°O
O
d
C,
x
3
O
p
N
A
d
CC7
Cl
°O
N
°
°
a
Ln
o
°o
o
N
o°
n
°o
°o
cD
°o
p
n
O
°o
o°
tD
O
O
3
((D
((D
d
(D
(D
o
~
O
of
a
N
C
C
C
a
n
C
CL
m
4]
A
17g
aleG of uolldeoul loafoad =Gild
18£`183
- $
- $
- $
- $
- $
000`OOZ$
L8£`LB $
s ;so3 ;30foad le ;ol
18£'L8Z
000'OOZ$
L8£'L8 $
J9yl0
-
-
oua u!luoG
-
-
lsoG uollonilsuoG
-
-
u!wpy
-
M/b
-
000'00Z
-
I!wJad •AU3
- $
(000'OOZ)
000'OOZ
-
u lsaG
1e101
£60Z-
Z60Z lid
Z60Z-
6 60Z lid
6602-
0602 lid
0602-
60OZ lid
60OZ
- 80OZ lid
80-6£-£
;e 'I!eAy
;aBpnq
80-6£-£ ;e so
oueagwnau3
'8 s;so3
len)o`d Gild
s;S03 ;3afoJd
PaloaalG sy :uo!;eoo-I
'ola `Ajejq!,l `ao!}}p Isod 'IIeH fi1!0 Bu!pnloui s6u!pl!ng aaluaG o!A!G lenldeouoo
`InoAel `uo!leool Bulpnloui jap!suoo of sonss! leJanas aq 11p aaayl •al!s Ja;u90 o!A!G
e jol spaau ajnln; pue Bu!lslxe ay; alenlena II!M loefoid slyl •ueld loefo.rd Ja;uaG o!A!G
pue luawdolanapaZl yl!nn uo!lounfuoo ui ueldaalsew unno ;uMOp ajedaad of luellnsuoo aJ!H :uo!; ! osea
Ioafoad Ja;u90 o!A!G IR ueld JGISM unnoluMOG :adA 1 ;oafo.id
LLZV :aagwnN;oafo.id
MO - N30 :'ON al ;oafoad
uollduosaG loefoid
weaBoJd luawanojdwl lel!deG E 6/Z 6OZ-60/90OZ lid
GJOUISI3 a)le-1 10 40
000`OOZ$
18£'18 $
Bu!pund le;ol
000'00Z
000'00Z
-
WRI - £ 66
L8E'L8
(000'OOZ)
000'OOZ
L8£'L8
pun3 leaauaE) -go d
1e101
£60Z-
Z60Z lid
Z60Z-
6 60Z lid
6602-
0602 lid
0602-
60OZ lid
60OZ
- 80OZ lid
80-6£-£
;e 'I!eAy
;aBpnq
80-6£-£ ;e so
oueagwnau3
'8 s;so3
len)o`d Gild
ao.inogBu!pund
PaloaalG sy :uo!;eoo-I
'ola `Ajejq!,l `ao!}}p Isod 'IIeH fi1!0 Bu!pnloui s6u!pl!ng aaluaG o!A!G lenldeouoo
`InoAel `uo!leool Bulpnloui jap!suoo of sonss! leJanas aq 11p aaayl •al!s Ja;u90 o!A!G
e jol spaau ajnln; pue Bu!lslxe ay; alenlena II!M loefoid slyl •ueld loefo.rd Ja;uaG o!A!G
pue luawdolanapaZl yl!nn uo!lounfuoo ui ueldaalsew unno ;uMOp ajedaad of luellnsuoo aJ!H :uo!; ! osea
Ioafoad Ja;u90 o!A!G IR ueld JGISM unnoluMOG :adA 1 ;oafo.id
LLZV :aagwnN;oafo.id
MO - N30 :'ON al ;oafoad
uollduosaG loefoid
weaBoJd luawanojdwl lel!deG E 6/Z 6OZ-60/90OZ lid
GJOUISI3 a)le-1 10 40
Z9
669`ZZZ $
669`ZZZ
000`006$
000'006
- $
- $
- $
- $
-
005`6£ $
005'6£ $
666`66 $
666'66 $
s ;sop;oafoad le;ol
J9410
-
-
oua ulfuop
-
-
;sop uolloni}suop
-
ulwpy
_
MM
-
}lwaad -nu3
$
-
u lsaa
669`ZZZ $
000`006$
- $
005`6£ $
666`66 $
s ;sop ;oafojd
669`ZZZ $
000`006$
- $
- $
- $
- $
005`6£ $
666`66 $
Bulpund le ;ol
669`ZZZ $
000`006$
- $
005`6£ $
666`66 $
pun3 leaaua0 - g06
WWI
£60Z
- Z60Z A3
Z60Z
- 660Z Ad
6602
- 060Z A3
060Z
- 6002 Ad
6002
800Z Ad
80-6£ -£
le 'I!eAv
;aBpnB
80-6£-£ ;e so
ouejgwnou3
38 s ;sop
len;od Ulld
0ojnog Bulpun3
ap1M -A ;10 wol;eool
popnpul aie sfsoo;ueweoeldaa iayjo pue swjo;lun
`slassan pue salolyan Apo 6ulpuejq ao; s;soo awl; au0 •96eu61s;uawnuow pue a6eu61s
N ied pue 6ulppq '96eu61s 1eu61s 0!-4eil `sJopuJoo Jofew 6uole su61s Iaa.i ;s ;l;oj;aj `saauueq
;y611 ;aajas 10 uol ;ells }sw ay; y ;1M pueiq ue6ols pue o6ol Apo Mau ay; sluawaldwl;oefoid slyl :uol; l�osaa
;oafad 6ulpueJ8 :edAl;oafOid
68Zb :jagwnN;oafo,id
9600 - N30 :'ON UI;oOfoad
uolfdljosaa loafad
wea6oad ;uawanojdwl lefldep 86/Z 60Z-60/900Z A3
aaouls13 eNel ;o Apo
917
CV
000`09 $
- $
- $
- $
000`0S $
- $
- $
s;soD;oafojd le;ol
_
-
J941O
oua uguoO
;soO uo!;onilsuoO
u!wpy
_
-
AAAI
_
l!wJad -nu3
000'05 $
E60Z
-Z60Z Ad
Z60Z
-6602 Ad
6402
-0602 Ad
OLOZ
-60OZ Ad
000`05
90-LE-C
)V ,Reny
196pn8
- $
u !saa
s;soD ;oafoid
000`09 $
- $
- $
- $
- $
000`09 $
- $
- $
Bu!punj le)ol
000`05 $
leIol
E60Z
-Z60Z Ad
Z60Z
-6602 Ad
6402
-0602 Ad
OLOZ
-60OZ Ad
000`05
600Z
-800Z Ad
90-LE-C
)V ,Reny
196pn8
_ $
go- 6E-E ;e s
9oueagwnou3
g s;soo
lenpV slid
punk uo!lnllod a!y
aoinos el!golN - 909
ao.inog Bulpund
Il!4jawwng /adejO pue anuQ 9Jo4sa)le-i uaanlaq uoAueO pewl!e�:l wo!;eoo-1
'11!4jawwns
/adejO pue anuQ ajo4sa�le-1 ueeNeq uo�(ueO peoil!e� uo 6u!w!1 `uo!;eu!pJ000 leu6!s ap!nad :uol; laosaQ
uo!leupooO leu6!s 0!,4eil :adAl ;oafoid
:aagwnN ;oafoid
L WO-AU :'ON ai 3oafold
uogduosaQ loafoad
weJ6ad luawanoidwI lel!deO £6 /Z60Z-60 /900Z Ad
ajoulsl3 aMel jo Al!0
9£
� ' r � !
tE
a ;ea o; uol ;deoul ;ogfwd =alld
000'08 $
- $
- $
- $
- $
- $
506'8 $
960'LL $
s;s03108fo.id 1123 01
-
-
Ja410
-
-
oua ul;uoO
960' LL
560' LL
;soO uol;oni ;suoO
906'£
906'E
-
ulwpv
-
-
MRi
-
-
;lwJad •nud
000'9 $
000`9 $
- $
u lsap
112101
£LOZ
-ZLOZ A=l
ZLOZ
-LLOZ Ad
6602
-OLOZ A=l
OLOZ
-600Z Ad
600Z
-800Z Ad
80-6£-£
Ileny
;a6pn8
80-6£-£ ;12
seoueagwnau3
g s ;soo
lenjoV alld
s ;so3 ;oafoad
000'08 $
- $
- $
- $
- $
- $
506'8 $
960'LL $
Qu!pun=l 112j01
000'08 $
906'8 $
960' LL $
All - 90Z
112101
£LOZ
-ZLOZ A=l
ZLOZ
-LLOZ Ad
6602
-OLOZ A=l
OLOZ
-600Z Ad
600Z
-800Z Ad
80-6£-£
Ileny
;a6pn8
80-6£-£ ;12
seoueagwnau3
g s ;soo
lenjoV alld
aoano$ 6ulpun.1
'anUd aplsJanl-�l Beau antra 9J04s9ile_1 10 ;saM4Pou 'ease s;46laH gnlo Aijunoo a4; ul ;aai ;g quid :u011e30-1
-dew papJooa.J a4; 4 ;inn aoueP000e ul;aaJ;S quid 6ul ;oni;sumej
pue leua;ew a4 ; ;o 6ulsodslp ';uawaned 6ul ;slxa 94; 10 lenowaJ 94; sanlonul ;oefad a4; ;o adoos a41 :uolIF!
6ulned'9lu9wu6llea�A- 1994S quid :odAl ;oafo.id
L L£b :aagwnN ;oafoad
LZ00 -HIS :'0N t71 438foad
uol;duosap ;ogfwd
weJ601d ;uawanadwl le;ldeO £ L/Z LOZ-60 /900Z A-1
9JOUIS13 ailed ;o Al!O
ze
000'91 $
- $
- $
- $
- $
- $
1790'69 $
9£6`9 $
s;soO ;aafoad le;ol
_
-
iaglo
009'5
009`9
Aouabuiluoo
0017'95
0017'95
-
;soO uol;oni;suoO
000`£
000`£
-
ulwpy
M/a
_
-
;IwJad •nu3
000'06 $
1790`17 $
9£6'9 $
u lsad
le ;ol
£60Z
-Z60Z Ad
Z60Z
-660Z Ad
6602
-060Z Ad
060Z
-600Z Ad
600Z
-900Z Ad
80-6£-£
'11LIAV
;aBpns
80-6£-£ ;e
saoueagwnou3
+e s ;soO
len3oV dlld
s ;soO ;oafo.id
000'91 $
- $
- $
- $
- $
- $
1790'69 $
9£6`9 $
Bulpunq le ;ol
000'9L $
1790'69 $
9E6`9 $
;snit
^idwl ollgnd - 909
le ;ol
£60Z
-Z60Z Ad
Z60Z
-660Z Ad
6602
-060Z Ad
060Z
-600Z Ad
600Z
-900Z Ad
80-6£-£
'11LIAV
;aBpns
80-6£-£ ;e
saoueagwnou3
+e s ;soO
len3oV dlld
aoinog Bulpun.1
199J ;S ulooul-1 Beau anuQ;demsuns :uol;eoo-I
;uewBas pa ;on.gsuoo Almou eq; o;;uaw6as
Bul;slxa aq; wa; anu(i ;dE)msunS uaann;aq dull 6ulssu aq; Bul ;aldwoo dull bulssm aq;;oni;suoO :uol; ljosao
antra ;demsunS- uol;oni ;suoO Aempeo�j :edA1 ;oafoad
68217 :jegwnN ;aafoid
ZZ00-His oN dl ;oafo�d
uol;duosaQ ;oafad
weJBwd ;uawanadwl le;ldeO 6NZ60Z-60 /8002 A3
9Jouls13 aMel 10 40
68PvN — 1doogn
SID am15 /3 e)W7 /o A;r)
sts 4-3 spr�API
:svaunos vivo
900L lNdv
Sig •.°°maa -Yn
sav :H3swnN 1o3f OMd
:dg P—d-d
L000-211S :m3swnN a 03rONd
BONVN31NIVW JNIdlNlS oI:j=iV211 ivnNNV
eer
a �jm
—I O
O
_j
i
%...
61o•ajoulsja- a�ej-mmm
VZ t £ -VL9 496)
0£9Z6 bO 'aJouis13 aMel
•16 ule" 'S 0£l
aioulsl3 amel !O Apo
490=1 009'6 008'b 001'Z 0
I 1 1 1 1 1 1 I 1
...........1'
C9P@N eue/delelS
$19 eJou /s/3 eye7 /o-4YJ
SID •4—.1 apIMA/N
se -Wnos ejea
9002 'IydV
SID 8Jouls13 eMe7 :a3swnN ipwOkld
:40 Peed -d v000-His :imewm al i3wO 1d
:
a WV DOHd 1N3WaDVNVW 1N3W3AVd
a�m
N
-I o
o!
0
fJ.
:w
ti ...
6jo•ajoulsjq-Gl el•mmm
4Zl£-149 496)
0£5Z6 VO 'GJOUIS13 OMBI
'3S UIeW 'S Oct
OJOUIS13 WWI to Ain
199-4 009'6 009'4 004'Z 0
:
............
tjM
ZL
000`9£$
- $
000`8£ $
- $
- $
- $
- $
- $
s;soa ;oafoid Ie;ol
000`9£
000`5£ $
- $
Jay }p
'
-
oua ulluoa
'
-
is uollonilsuoa
'
-
ulwpy
-
-
MRi
'
-
I!uuad •nu3
'
000`5£ $
-
u lsaa
le3ol
£60Z
Z Ad
Z60Z
- 660Z Ad
6602
- 060Z Ad
0602
- 600Z Ad
60OZ
- 800Z Ad
80-6£-£
;e •l!eAV
IeBpng
80-6£-£ le so
ouejgwnou3
T s;soa
len;ov dlld
s;soa ;oafoJd
000`9£$
- $
000`9£ $
- $
- $
- $
- $
- $
Bu!pund le;ol
000`5£$
000`5£ $
- $
pund lejauaE) - go
le3ol
£60Z
Z Ad
Z60Z
- 660Z Ad
6602
- 060Z Ad
0602
- 600Z Ad
60OZ
- 800Z Ad
80-6£-£
;e •l!eAV
IeBpng
80-6£-£ le so
ouejgwnou3
T s;soa
len;ov dlld
eoinog Bu!pund
aplM Aj!a :uo!;eoo-I
'weiboid slsAleue
pue 6ulMoea; wsllepuen Ja)!oea; I;!-4ej6 }uawaldwl o} seseyoand ajemUos pue ;uawdlnb3 :uoi_ ;Tao
;oafwd eouelllanang pue 6uiNoejl gUjejE) :odAl;oafoJd
:aagwnN ;oafo.id
91700 - N30 :'oN Q!;oafoJd
uogduosaa Ioafad
wea6ad IuaWanoidwl lepdea E 4/Z lOZ- 60/8002 Ad
aaouls13 aMe-I jo Apo
OL
000`09$
- $
000`09 $
- $
- $
- $
- $
- $
s;soa;oefoad le;ol
000'09
000'09 $
- $
a9410
-
-
oua ul;uoo
-
-
;soo uoi ;on.i;suoo
-
-
ulwpy
-
-
M/d
'
-
liwJad •nu3
0$
000'09 $
-
u 6 lsaa
leJol
£60Z
Z60Z A3
Z60Z
- 660Z Ad
6602
- 060Z Ad
OLOZ
- 600Z Ad
60OZ
- 800Z Ad
80-6£-£
4e 'lleAV
;aBpnB
80-6£-£ ;e so
ouejgwn3u3
V s ;soa
Ien;oV alld
s;soa ;oafoad
000`09$
- $
000`09 $
- $
- $
- $
- $
- $
Bulpund le;ol
000'09$
000'09 $
- $
pun3 leaaua0 - g0�
leJol
£60Z
Z60Z A3
Z60Z
- 660Z Ad
6602
- 060Z Ad
OLOZ
- 600Z Ad
60OZ
- 800Z Ad
80-6£-£
4e 'lleAV
;aBpnB
80-6£-£ ;e so
ouejgwn3u3
V s ;soa
Ien;oV alld
aoinoS Bulpun3
aplM Apo
6ul }lnsuoo /6uluueld oi6a ;ea ;S A;unoeS pue iGanooa�j aa;seslp
pue 'walsAs dmpeq Ajejgll 'uolsuedxe anup paeq SNVS ';uaw99a6e lanai eoln.ies AJaAOoaJ
Ja;seslp 31H pie6unS a;owaa sepnloui ;eqj joefoid iGanooa�{ Ja;sesla pue A4unoeS ll Mau y
;oafad tianooa�l Ja;sesla pue AjpnoeS A6olougoal uol;ewaojul
Eti00 - N30
uol;dlaosaa ;oafad
wea6ad ;uawano idwl lel!deo E 6/Z LOZ-60 /80OZ Ad
9Joulsl3 a le-f jo Apo
:uol;eoo-1
: uo: l;�laosaa
:odAl ;oafo.id
:jagwnN ;oafo.id
:'ON al ;oafo,id
:•
000`9£$
- $
000`9£ $
- $
- $
- $
- $
- $
s;soO ;oafoid Ie;ol
000`5£
000'5£ $
- $
J0410
-
-
oua ul;uoO
-
-
;soO uogonilsuoO
-
-
ulwpy
-
-
MRi
-
-
llwaad •nu3
0$
000'5£ $
-
u Isaa
lejol
£60Z
Z60Z A3
Z60Z
- 660Z Ad
6W
- 060Z A3
0602
- 600Z Ad
600Z
- 800Z A3
80 -6£-£
;e •I!eAV
;96pn8
80-6£-£ le so
ouejgwnou3
+g s;soO
Ien;oH alld
s;soO ;oafoad
000`9£$
- $
000`9£ $
- $
- $
- $
- $
- $
Bu!pund le;ol
000'5£$
000'5£ $
- $
pun3 IejauaO -go
lejol
£60Z
Z60Z A3
Z60Z
- 660Z Ad
6W
- 060Z A3
0602
- 600Z Ad
600Z
- 800Z A3
80 -6£-£
;e •I!eAV
;96pn8
80-6£-£ le so
ouejgwnou3
+g s;soO
Ien;oH alld
ao.inog Bu!pun3
101 6uhlJed ollgnd IIeH AID :uo!leoo-1
;off BuWed ollgnd IIeH Al!o a4; ;e walsAs ejaweo Apinoas jo uol;elle;sul :uo!; uosaa
}off BuWed ollgnd IIeH /41O- w91sAg ejaweO Ajpnoag :edAl;oafoad
:jagwnN ;oafoJd
6tb00 - N30 :'ON al;oafo.id
uol;duosap ;oafo.id
weJ6ad luawanojdwl lelldeO MUOZ-60 /800Z A3
a.louls13 OW-1 10 40
..
000`0£$
- $
000`0£ $
- $
- $
- $
- $
- $
s;soO ;oafojd le;ol
000'0£
000'0£
- $
J9y ;0
-
-
oua ul;uoO
-
-
;soO uol;owlswo
-
-
ulwpy
"
-
MM
-
-
;IwJad •nu3
- $
000'0£$
-
u lsad
le ;ol
£60Z
Z60Z Ad
Z60Z
- 660Z Ad
6602
- 0 60Z Ad
060Z
- 600Z Ad
600Z
- 800Z Ad
80-6£-£
;e ,lleAV
;aBpnB
80-6£-£ ;e so
oueagwnou3
%g s;soO
len ;:)v alld
s;soO ;oafoad
000`0£$
- $
000`0£ $
- $
- $
- $
- $
- $
Bulpund le ;ol
000'0£$
000'0£$
- $
pund leaauaE) - g06
le ;ol
£60Z
Z60Z Ad
Z60Z
- 660Z Ad
6602
- 0 60Z Ad
060Z
- 600Z Ad
600Z
- 800Z Ad
80-6£-£
;e ,lleAV
;aBpnB
80-6£-£ ;e so
oueagwnou3
%g s;soO
len ;:)v alld
eoinog Bulpund
IIeH APO
*sepei6dn �jonn;au pa ;elan pue asyeoind jauueos ;ewjoj 96ael '6ulsueoll aaeNjos
ayoljase-1 lemi ppe sepnloul •(gWa) wa;sAS luewe6eueVgjuewn000 s,A;lo ay; ;o 11 aseyd
11 aseyd (SW(i) wa;sASjuawa6euelN ;uawnooCl
6E00 - N30
uol ;dlaosap ;oafoad
wea6ad;u9w9nadwl le;!deO £6/Z60Z-60 /8002 A3
9JOUIS13 aile'l 10 40
wol;eowl
:uol; !josaa
: edAl ;oafOid
:jagwnN ;oafoid
:'ON of ;oafoJd
179
000`09L$
- $
- $
- $
000'178£ $
000`£86$
000`£86$
- $
s ;soa;oafOJd Ie ;ol
-
Ja430
-
-
oua U! ;UO0
000'09L
000'178£
000'£86
000`£86
-
lsoo uo!lonJlsuoo
-
-
u!wpy
-
-
AAM
-
000,00Z
-
3!wJad •nu3
- $
000,1796$
000'£86 $
000'£86 $
-
u !saa
lelol
£60Z
Z60Z A3
Z60Z
- 660Z AA
6602
- 060Z Ad
060Z
- 60OZ Ad
6002
- 800Z Ad
80-6£-£
;e •IleAV
;aBpnB
80-6£-£ ;e so
oueagwnou3
T s;soa
leniov alld
s ;soa ;aa d
000`091$
- $
- $
- $
000,178c$
000`£86$
000'£86$
- $
Bulpun3 le;ol
000,00Z
000,00Z
-
d10 �Jed - 2Z
000`095$
000,1796$
000'£86 $
000'£86 $
- $
31a ' ;ua0 •woo - L 6 6
lelol
£60Z
Z60Z A3
Z60Z
- 660Z AA
6602
- 060Z Ad
060Z
- 60OZ Ad
6002
- 800Z Ad
80-6£-£
;e •IleAV
;aBpnB
80-6£-£ ;e so
oueagwnou3
T s;soa
leniov alld
oo.inog Bulpun3
Io04oS aIPP!W elloo eJJal :uol;eoo-1
'I0040S aIPP!W elloo eJJa I le
wn!seuwA6 a lowlsuoo o; louls!Q Ioo4oS pawun aJou!s13 aNej a43 4 ;!nn ;uaweeiBe d!4sJaulJed :uol;aQ
(aSfl3-1 yl!m) wn!seuwAE) Ioo4oS aIPP!W elloo eJJal :odAl;oafoad
176£17 :JagwnN ;oafojd
9£00 - N39 :'ON al ;oafoJd
uollduosaa ;oafOJd
weJBwd luawanoidwl lel!deo £ 6/Z 60Z-60/800Z Ad
9JOU!S13 aNel 10 40
Z9
009'8££' 6 $
- $
005' 6 6Z $
009,1,9Z $
000'00Z $
000'vgZ $
00s'S0ti$
000'9 $
s;soo ;OafOJd le ;ol
009'8EE' 6
005' 6 6Z $
009,1,9Z $
000'00Z $
000'175Z$
005'9017$
000'9 $
JaylO
"
-
Aoue6uguoo
-
-
;soo uoi;onJlsuoo
"
-
Uiwpy
_
M/d
"
000'006
000'056
000'00Z
000'05Z
000`00£
-
liwJad •nu3
0$
005' 6 6 6 $
005' 6 6 6 $
- $
000'17 $
005'906 $
000'9 $
u isap
le;ol
£60Z
Z60Z A=l
Z60Z
- 6602 A=l
6602
- 060Z yid
0602
- 60OZ Ad
60OZ
- 800Z Jld
80-6£-£
;e •ljeAV
496pn»
80-6£-£ ;e so
oueJgwnou3
'S s;soo
len ;oV alld
s;soo ;oaroad
005`8££`6 $
- $
009UZ $
009'69Z $
000'00Z $
000'ti5Z$
005'sOti$
000'9 $
Buipund le;ol
000'000`6
000'006
000'056
000'00Z
000'05Z
000`00£
-
WRI - g06
005'8£E $
005' 6 6 6 $
005' 6 6 6 $
- $
000'17 $
005'906 $
000'9 $
pund leJauao - 906
le;ol
£60Z
Z60Z A=l
Z60Z
- 6602 A=l
6602
- 060Z yid
0602
- 60OZ Ad
60OZ
- 800Z Jld
80-6£-£
;e •ljeAV
496pn»
80-6£-£ ;e so
oueJgwnou3
'S s;soo
len ;oV alld
aninog Buipund
suoileool /4lo snoiJen :uol;eoo-1
'(05-017'ZS17-EE1717-006);uawdinbe R tiaulyoew aoueualulelN s5lJBd JO; 000'ZZ$ PUB (0£-017'17617
-6171717-006) ;uewdmbe /amliwnj aoWo aoueualulelN Al►lioed Jo; 0017' 6 6$ '(6 6-017'17617-6171717-00 6) 6uiplinq
eoueueluleyq Alilioed Jo; 000'05$ '(0£- 017'LS17- 0£917-006) ;uawdlnbe /aJnliwn; Epgo Ja;ueo Jolues
ay; Jo; 000'9$ '(OZ- 017'L517- OES17-006) 6uippq Jalueo Joluas ay; Jo; 000'96$ '(OZ -017' 6S17-OZ517 -000
wowdinbe V Ajoulyoew Jalueo A4!unwwoo Jo; 050'9$ '(05-017'0517-06517 -006);uawdinbe ig fiJaulyoew
uoileJlsiuiwpy JOI 000'Z$ `(OZ-OZ'OSti -085v -006) Pun; le;ldeo wnipe }S Jol 000'00£$ Papniou! lebpnq
wall lepclao ayl •196pnq 6ui;eJado luawlJedao uoileaJoa� pue s�lJed ay; woJ; panowaJ lelideo :uol ;—Tea
swell lelideo luawlJedao uoileaJOa-�--i pue SMJed :adAl;oafOjd
6ZE17 :JagwnN;oarOJd
17£00 - N30 : "ON al;oafoJd
uoilduOSaa loaloJd
weJBOJd;uawanoJdwi le ;ideo E6260Z-60180OZ Ad
aJOUis13 ailed ;o 40
AN
000`16$
- $
- $
- $
- $
- $
000`16 $
- $
s ;soO ;oafo.id lelol
000'L l,
- $
000`2 6 $
J9410
'
-
AOUGIJUIJU00
'
-
;soO uoi;onilsuoO
'
-
ulwpy
-
-
M21
'
-
;!waad -nu3
' $
000`L6 $
-
u !sao
lelol
£60Z
Z60Z Ad
Z60Z
- 660Z Ad
6602
- 060Z Ad
060Z
- 600Z AA
6002
- 800Z Ad
80-6£-£
;e •I!eAV
;oBpnB
80-6£-£ ;e so
ouejgwnou3
'8 s;soO
Ien;ov Ulld
s;sO3 ;oafoad
000`L6$
- $
- $
- $
- $
- $
000`16 $
- $
Bu!pund lejol
000'26$
000`L6 $
- $
pun3 lejauaO - go!,
lelol
£60Z
Z60Z Ad
Z60Z
- 660Z Ad
6602
- 060Z Ad
060Z
- 600Z AA
6002
- 800Z Ad
80-6£-£
;e •I!eAV
;oBpnB
80-6£-£ ;e so
ouejgwnou3
'8 s;soO
Ien;ov Ulld
eoanog Bu!pun_q
;uewdolanaQ ApnwwoO :u014e30-1
'60-80 A3 PUe 80-LO A3 u! ;uaw:pedaa }uawdolanaa ApunwwoO ay; ao; le;!deO :uoi�1asaa
swell lel!deO }uawliedaQ;uewdolanaQ Af!unwwoO :edAl;oafoJd
66£17 :jagwnN;oafoJd
Z£00 - N30 :'ON Ul;oafoad
uo!;d!aosaa ;oafad
weJ6oad ;uawanoidwl Ie;!deO £ 6/Z 60Z- 60/800Z AJ
GJOUIS13 oNe-1 ;o Apo
E
000`0£$
- $
- $
- $
- $
- $
000`0£ $
- $
s ;so0 ;oafo.id le ;ol
000'0£
000'0£ $
J9410
-
-
oua ulluo0
-
-
lso0 uollonilsuo0
-
-
ulwpy
-
-
MRi
-
-
l!wJad •nu3
- $
000'0£ $
-
u !sad
lqol
£60Z
Z Ad
Z60Z
- 660Z Ad
6602
- 060Z Ad
0602
- 60OZ Ad
60OZ
- 800Z Ad
80-6£-£
le •IleAV
;eBpn8
80-6£-£ ;e so
ouejgwn3u3
'g s;so0
len3o`d alld
s 4so0 ;oafoad
000`0£$
- $
- $
- $
- $
- $
000`0£ $
- $
Bu!pund 1e3o1
000'0£$
000'0£ $
- $
pund lejaua0 - go l,
lqol
£60Z
Z Ad
Z60Z
- 660Z Ad
6602
- 060Z Ad
0602
- 60OZ Ad
60OZ
- 800Z Ad
80-6£-£
le •IleAV
;eBpn8
80-6£-£ ;e so
ouejgwn3u3
'g s;so0
len3o`d alld
aoinog 6ulpund
luawliedaa aollod :uol ;eoo-i
(09 -01,' 6Z6-6 6Zt-006) 000'0£$ le aloAojolow euo aol
seen la6pnq wel! lepcleo a41 -196pnq 6ulleiado luewljedaa aollod 94l wa; panowaj lepcle0 :uo!; !3osaa
swell lel!de0 lu9w90Jolu3 me-1 Ieaaua0 :edAl;oafoJd
L6Et, :jagwnN ;oafoad
0£00 - N39 :'ON ol;oafo.id
uollduosaQ loafwd
weJ6ad luawanoidwl lel!de0 £ 6/Z 60Z-60 /8002 Ad
9Jouls13 eMel jo Apo
MEN aue,deyels 6io•aioulsla- amel•mmm
Sig —1913 synio Ap 4Z L£-t4L9 4 96)
s1s 4 °"°o ear�"ro OE5Z6 ` O 'OJOuls13 a)lel
V;ua • ;s ule MI$ 0£L
900Z''11rdV
Sig �ur=1ae4n :N39wnN 103rOMd
AsP -ed-d 6000'�i21d,n :imewm al 1o3rOMd a�ouls13 a�le� ;p AID
ees
NOISNVdX3 NUVd A113
N
/ ( 1 0 OOL 09 0
� X131^ NIb1W Nd /
/ 7
/ o
11 � O/
y1
/
� / J
V321V loaf 021d
r
/�lslp�d &Oyd
i
aiourslY a! °7 <
y
V32:]V 103f'O�Id
zo
LbW byby
p
�--
wn�,n,�
r" '"'
� ,;
1►
,, ,�
„; �
���� -,
s103rMAd a=]aNnJNn
pa ;aldwoo
pa ;aldwoo
t'8
000'M4 $ s;oafoJd le;ldeo aoueua ;uleWjee.i ;g je;ol
000'0£L $
suol ;eool snouen- uol ;on.i ;suoo �1em9plSI
80£b
9Z00-2i1S
000 -09L $
el�anp ;a9JIS U!INUea�
ggZti
£100-His
sn ;e ;g jejo.L pa;ewl3s3 alU ;oafad :•oN;oafoad I of 3o9fad
piaH /pa;aiaa /pa;ajduaoa- s;oafoad le ;idea eoueua;uiew ;aaj ;g
86OVU0Z 46noJ44 600Z /800Z 6ui;sl-1 s;oafOid;uauaanoidwl le ;idea aeaA anid
'h:3
L8£`99b s;o9foid 9oinosea of ;enbV pue 93le-1 fe;ol
[L8E-99b $ 1 1 9segd- uol ;e ;!geg9�:{ g3898 9naE) wIDI 08Zb I £000-3>IlI
sn ;e ;S I Ie3ol P9 1ewils3 GlU 139foad :•oN;09fad :'ON (11 ;O9foad
PieH /Peieiea /pe4ejdwo3- s;39foad eamoseN of ;enbV pue a )ie-1
£�OZ /Z60Z 46noj4; 60OZ /800Z Bugsib s ;o9(ojd;u9w9noidwi le;ideo jeeA onid
09
ale(] o; uol;deoul Pafad =alld
000`05£ $
- $
- $
000`09Z $
000'09 $
000'0S $
- $
- $
s;soa;oafoJd !e ;ol
-
Jay30
000'02
0001OZ
-
oua ul ;uoa
000'00Z
000'00Z
-
;soa uol ;oru's
000'0£
000 0£
-
,pv
_
M/a
000'09
000'09
-
;!woad •AU3
000'09
000'04Z $
000'04 $
00004 $
-
u lsao
le3ol
£LOZ
-ZLOZ Ad
ZLOZ
-L LOZ Ad
LLOZ
-0 LOZ Ad
OLOZ
-60OZ Ad
60OZ
-8002 Ad
go- L£-£le
'I!eny;a6pn8
80-L£-£ ;e
saauejgwnau3
+g s;s03
IenjoV alld
s;soa 3aafoad
000'09£ $
- $
- $
000`09Z $
00010S $
000`09 $
- $
- $
6ulpund pgol
000'04£ $
000'04Z $
000'04 $
000'04 $
- $
ulwa wJo3S - L LZ
le3ol
£LOZ
-ZLOZ Ad
ZLOZ
-L LOZ Ad
LLOZ
-0 LOZ Ad
OLOZ
-60OZ Ad
60OZ
-8002 Ad
go- L£-£le
'I!eny;a6pn8
80-L£-£ ;e
saauejgwnau3
+g s;s03
IenjoV alld
aoinog6u!pund
s ;uawanoidwl 06euleap •j(i aaoysa)le-1 pue uopjoo :uo!; !jasaa
s;uawanoadwl 96euleja :edAl;oafoJd
:jagwnN;oafo.id
9000 - NWI :'ON 01 ioafoJd
uoi;duosaa Pafad
weJ6ad;uawanoidw1 le;!dea MUOZ- 60/800Z Ad
GJOUIS13 axle-; 10 AP0
8L
ale(] o; uoildeoul;oafad =alld
000'OLZ $
- $
$
- $
- $
£96`£S $
1£0'9SL $
s;s03 ;3afoad le;ol
J9410
000'51 $
000'51
AoUabUlluoo
05£'bL1 $
05E'9E
000'8£1 $
lsoO uol;onilsuoO
000'01 $
£19'2
L8E'L $
ulwpy
_ $
/Wa
008'191. $
009'e l,
000'8£ 1 $
;IwJad •nu3
059'01 $
E91'Ob $
Ogg'O L $
u 1980
le;ol
£LOZ
-ZLOZ Ad
ZLOZ
-LLOZ Ad
LLOZ
-01,0Z Ad
OLOZ
-600Z Ad
600Z
-8002 Ad
80-1£-£ le
'lleny;aBpng
80-1£-£ le
saauejgwnau3
T s;soD
lenpV Mid
s;soO ;oafojd
000'012 $
- $
$
- $
- $
£96`£S $
L£0'9SL $
Bulpund le;ol
_ $
008'191. $
009'e l,
000'8£ 1 $
V amseayy - Z l 1
OOZ'85 $
E91'Ob $
L£0'81 $
xel seO - 011
le;ol
£LOZ
-ZLOZ Ad
ZLOZ
-LLOZ Ad
LLOZ
-01,0Z Ad
OLOZ
-600Z Ad
600Z
-8002 Ad
80-1£-£ le
'lleny;aBpng
80-1£-£ le
saauejgwnau3
T s;soD
lenpV Mid
eoinos Bulpund
'jagn6 pue gjno 6ulpnloul anuQ aJo4sa)le-1 pue anu4 lnuleM uaamleq Aeenpew anuQ iaseJd a4; lonilsuooaJ
pue lalul uleip wiols a4l Olin suolloosia;ul o4;;sed paAanuoo sl aalem le4l 4ons eaae sly; ul 96eulejp anoidwl :uol; ljasaa
anuQ jasej3 :uoi;onj;suooaa AempeoU quawanoidwl 96euiejt] :edAl;aafoid
L6Zb :jagwnN;aafo1d
b000 - NWI :'ON of loafoJd
uollduosaa ;oafad
wea6ad;uawanojdwl lel!deO £1/ZLOZ-60 /8002 Aj
9Jouls13 axle -) ;o trio
pr -4
., 4
MOO
t7L
t
2
•
CSpeN eue/de/e1S
SID eiou1613 eHe7 /o 140
SI°J dlunoa BPI —Ard
:sewnoS elea
9ooz ypdy
SI`J WOUIS13 ayrl
•rte p—d-d
0
:1138wnN 133rOHd
9000 -a1s'n :a38wnN 01 133road
S1N3W3AOMdWl avow SIOH3IN
ON 007 SO 0
d3ad 133rOad
IS
610•aJoulSla- a�ej*mmm
4Zl£-VL9 496)
0£9Z6 t/0 '9J0uiS13 alel
Is uleyy *s 0£l
GJOUIS13 9)1e-1 10 A80
o-�
0- IOUIsj-V Ol°7
`d318V 103road
CgpeN oueldole7S
Sig aMM3 wlrl /o Aj
SID 4—o MI —NL
9ooe'INdv
SID wou1513 0Me7
:.tg Paied -d
s
a�.
N
!
:213ewnN 1o3mlld
S000-als'n :u3swnN al 1a3mUd
N011onsISNO0311 133HIS SI113
6jo•aloulslo- oNel"nnmm
bZl£-4L9 496)
0£9Z6 VO'aJouis13 Q)iel
Is uleyV 'S Oct
GJOUIS13 GNel 10 40
! f ,
3- IOUIS79 axn7
6,
� `d3�]V 103ro2jd k
OM
m
f9PeN a- lda7e7S
sis ai isia ayel /a Ap
slJ 4—a opr—tu
:Worms elea
90oi'II'dv
SID WOU1613 aMe7 2138WnN 103rO21d
:.fa Pajeda/d MG-NIld'n :2138WnN 01133r021d
s
M
!
i
S1N3W3AOUdWl NUVd 1"3N39
&lo•ajoulsla- aNel-mmm
tilt£ -tQ9 (t96)
0£SZ6 HO'aJouis13 aNel
•ts uleyy ,s Oct
ajoulsl3 amel Jo Ain
o4Z 0
atourstg axn7
;L�x
� d32:Jb lo3ro�ld W
raPoN au.Id o.;S
SIJ aJ-M3 aJN7 /o Alp
SID 14uno.1 api—AI l
:aa]Jnos Ma
9002 '1pdV
SID aiou/S13 avri
a6 p—d-d
a�m
N
:a3awnN 1o3road
6000 -Mad'n :a3awnN al 1o3road
ONI"d 101 JNINNVd NUVd 1NI0d3NV1
Ved -
;uioda )ie-I
it�R�R
ffiam
�1 ■1111111 119 Willfi` *.����o��` °;�``�:�`O`!
;y11111111111111111111 •.���;�,;�y```��p� .;.,�. ���
y.i1i1i11111t111t.��..' :�►
mill
MIS
fuo-aioulsla- amel•mmm
17ZL£ IL9(L96)
OE9Z6 d0 'aJou!s13 aile-1
Is u!eyy 'S Oct
aJou!S13 are-I !O Aa!O
— f laad 040' L US 09Z 0
d31Jd 133r0ad
aaourst 9-[n7
A bMJV 103ro�ld I
EBPON aualdalalS
sla a—ma a-vol /o AAD
Sl!) 14-3 aPI —A.Qi
:sawnos `m
9ooZ '11•dV
Ste a+oulsl3 aNrl :u38wnN 1o3POZId
.da p.ad -d 8000 -Nad•n :a3swnN 01133mlld
s
N
1N3W33dld3U WOOHIS311 NUVd O(IVH3VW
Y�
610 -Gio W S1a- aie!-rmmm
bZ l £-4L9 ( M)
0£SZ6 d0 'aJou!s13 GNel
Is u!ew -S Oct
GJOUIS13 oNel !O AI!O
V3UV 103r021d
aloutSIJ �x0 ,
ilks"', x
`d3UV 103rOUd r4
0
�t
if
Z
m
co
y, I
ii
xa
d3ad n3mtld
/ � 1
v3w 1o3ro2fd
6�o•a�oulsia- a�el•nnnnnn
r9peN a- #60e7s
sro —m3 eMel jo Alp
4Z l £-VL9 (M)
sIO.'4U -3 ePl—Ard
0£9Z6 VO 'aJoulsl3 9�81
9091
3S weW S 0£l
GVE7
s�°J e�oule�3 eHe,
�2138Wf1N 1�3f O21d
OIOUIS 8 e 40
13 �I ��o
:saaewd -a
Z000-NUd *n :M38wnN dl 1J3f OUd
3SVHd '-13NNVH:D 13-uno
s
NN
N
�t
if
Z
m
co
y, I
ii
xa
d3ad n3mtld
/ � 1
v3w 1o3ro2fd
b1-1
£OPEN aue!de3eiS
SIJ 9JOUIS13 aHel to A40
SIJ Ajunoo ap!sjan!a
:saajnoS ejea
:u38 W n N 133 roUd
LOOZ ' I!JdV
S!O 9Jou!s!3 aVl
9000 -Nma*n :H38wm a11O3f0Ud
:AS pajedaJd
133HIS TIIH 1SV3 IV 1N3W3AOlJdWl 39VNivua
As
a�jp.e
vu
Itp
j oe
6lo•ajoulsla -G� ej'mmm
t, l£-bL9 (L96)
0£9Z6 VO 'aJouls13 ONel
'1S uleW 'S 0£L
aJouls13 oNel 10 Apo
3W3'd. g WV3114
MdOMIS"I
10 kil )
1 V3NV 133rONd
r••
89JV l39rOad
r•
F .
06
6Uo•ajoulsla- a)lej*mm e
VX)vN aurydalgS qZ L£-VL9 496)
S /'J —M3 aMa710 AW
Sig A ` u- Dapl —AN 0£SZ6 O'aJou!s13 aNel
:saamos qua 1S U1eW 'S Oct
90°z °'ov e�
SID oulsl3 a0-yin 103f OHd GJou!S13 GMe'l JO �cl!O
Jep—,d-d £000 -NMa *n 2l3ownN al 103rONd
s
S1N3W3A02ldWl 39VNivda 133HIS Jlll"B1l
B�M
N
r , /
la j pqZ OZ 09 0 %
YIP b�J
Oyd) /
Cn
a loulsjg aaln7
k� i
'C") / l
rw&N eueldalelS
910 —IS13 Wle7 /o AW
SID A4.3 ePlsja^W
:W nos apa
good 'Im*
SI°J wOUISS 0)(e7
LAO p—dud
s
a�n
N
a.
:H38wnN 133f 021d
Z000 -NHa,n ?139wnN al 133r0Md
S1N3W3AONMI Ni"a W2IO1S 9 3nN3AV /133HIS IIIW
V311V 133rONd
In-
71><
m
m
si\ si
/1
�l
6jo•ajoulsla- 8Ael•Mmm
bzl£-17L9 (M)
0£5Z6 d0 'aJows13 ONBI
• ;s uleyy 's Oct
GJouls13 aNel 10 A3!o
�r
J+.;4
111111 111111 I � � � — MEMO 1 IIIIVI
m
z
C
m
V'
a gouts /-V ayL
R `d31Jd 103ro2id k
b£�
000`09 $
- $
- $
- $
$
000`05 $
SISOD Pa(oad lelol
_
Jau10
_
oua ulluo0
_
Iso0 uoilonilsuoo
_
ulwpy
_
AArd
_
}lwJad 'nu3
000`05 $
8LOZ
-L LOZ Ad
LLOZ
-9 LOZ A=l
9LOZ
-9 LOZ A-A
9602
-V LOZ Ad
000'05 $
u isaa
slsod ;oafoJd
000`09 $
$
- $
- $
- $
000`09 $
6ulpunj lejol
000`05 $
lelol
8LOZ
-L LOZ Ad
LLOZ
-9 LOZ A=l
9LOZ
-9 LOZ A-A
9602
-V LOZ Ad
000`05 $
VLOZ
-£ LOZ Ad
aoanog Bulpun�
apinni(I10
ap A,iAji0 papaau se Alejes oimeal juawaldwl pue ioliuolN
slooyos aol Alejes olijeJl
papun}un
C8 L/L LOZ-ti L/£ LOZ Ad)
uolldu0sa0 109foad
wea6oad Juawanadwl lellde0 £ 6/Z LOZ-60 /800Z A=l
WOMB OW110 AID
:uoljeoo-1
:u014 hosed
:edAl IoafoJd
:aagwnN }oafoad
: -ON dl }oafoad
£SPeN 8- fdaiRS
Sig amuM3 eSe7lo Ana
SID A—o aPI—Am
:Soong pep
soot 1PdV
SID WOUIBL9OW, :2138WnN 103rONd
-dg pe-d -d $000 - -qb1•n :1138mN a1133rOUd
ees
N
I d3bd io3rObd C
NOIIV- VISNI TdNJIS 3I=1:IVHI
is
6JO -9JO U IS!9 -9 >le!' NVVkM
4Z l £-tiL9 ( M)
0£9Z6 ` O'9Jou!s!A 9W-1
-Is u!epq -s 0£L
- ou!s13 9xe-710 A!0
0
i
` ERN 1O3robd
cePem 9 —idams fuo•ajoulsle- aAel-mmm
SID —4673 OWWO AND Vz L £-4L9 ( L 96)
SID 14MOOD eP"AN
:280.nos qea 0£SZ6 dp 'aJouls13 9)le-1
sooz'ldv '1S U1eW'S 0£L
SID WOUIS13 a8e7 213awnN 1o3f021d
AeP -ad-d 1000-d fl 211' :H313wnN (31133r011d a�oulsl3 a�lel 1p /�llp
AAs
NOUVIlt/1SN1 WNJIS 3I=1=IV'dl
a�pro
Nvv
f h r
a Ott 1 001 0U 0
y l i
It
It
I It
/ r
i �/ , `d32:IV 103rmld
6BPCN a— ldalgS
SID —Isla aHg7lo Aw
SID 44-3 aPlta^al
: Wwms qea
Boot 11bv
SID DJOUIS13 0X07
!AB Pandwd
:N38WnN 133rONd
S000-dal•n :N38mN al l33ro21d
NOIIVII dlSNI IVNOIS 3I=1=IVUI
SW
6io•aloulsla- exel•mmm
bZLc-7L9(L96)
0£5Z6 b'0 `aloulSl3 aNel
'IS uleyy •S 0£l
alou!S13 aXel 10 40
�4
MR
Iaaj 008 004 ooz 0
1 1 1 1 1 1 1 1 1
d3ad 133rObd
`d3bd 103roUd
CIReN amid4e;S
SIS eJOURl3 8JR7 /o AW
SID A;Unoo OP"Ard
:sownoS else
9ooZ 1PdV
SID 8ion1213 "s7 :2138wnN 133r021d
:A&Ps-dwd woo -turn :a38wnN ai 133rOHd
r NOIIV— IIVISN1-lVNJIS 3I=1:]VHI
a�.
e
)Iaed
;uioda )le-1
f%I jn�
ua aaa
a ■ aaua
V
/mill 111-1-
■q //ta +
I
` mjv 1o3mUd i
fuo•oloulsle -ONel- mm m
4Z t £-VL9 ( M)
0£9Z6 VO'aJouls13 GNBI
•;s uleyy *s Oct
GIOUIS13 aNel 10 Apo
�4
ajoulst-V aV7
VMJV 103ro�ld
tlz 6
7 1
A "B
3�O�.IIS'I�3?I�I'I
40 )UID
4(
M
000`0V $
- $
- $
- $
- $
000'OV $
sMd 4oafo id IeIol
-
aa4�0
-
oua ul;uoo
-
tsoo uoltowlsuoo
-
ulwpy
-
M/d
-
4iwJad •nu3
000`0b $
000'0V $
u lsaa
le;ol
9M-LM Ad
LM-9M Ad
9M-9M Ad
9LOZ-VLOZ Ad
VLOZ-£LOZ A:j
sPOD )oafoad
000'0ti $
- $
- $
- $
- $
000`0V $
Bulpun,q le;ol
000'01 $
000'Ot $
le;ol
9M-LM Ad
LM-9M Ad
9M-9M Ad
9LOZ-VLOZ Ad
VLOZ-£LOZ A:j
aoinoS Bulpun_q
snouen :u014e30-1
•/Gl0 ay} Inoy6noay} suoiteool snouen }e stuawnuow Ae /uns llelsul MoRciflosuad
s;uewnuoVV AeAjnS :edA.L loa foad
:aagwnN loafoad
6Z002i1S,n :'oN dl 338f0id
popunjun
(9 W WZ-V 6/£ 6 O AA)
uoitdijosaa }oafwd
weJBad tuawanoadwl letlde:D £ 6/Z OZ-60 /90OZ .l4
9Jouwsl3 aNe-1 10 40
EgpeN aueldalelS
SID BIOUPS13 94el10 Al!C)
SIC) Aluno3 ap!SJan!a
:saanoS elep
LOOZ ' I!IdV
SID aJOU!S13 84el
:AS pejedald
s
9�M
N
:m3swnN 133r02Jd
LZ00 -HISY1 213ewnN al 103rOHd
133HIS A3NVH3 013nN3AH WVH"!E) WON=l 3ARIa 3210HS:
V3NV 133rO2ld
6u0•aJ0uisla -9� ej-A&MM
tiZl£-4L9 (t96)
0£426 `d0 'aJou!s13 8)!e-1
lS U1eW 'S 0£l
GJOUIS13 GNe-l!O Al!O
3w�x.t)C3 wv3ba
Id0IJ I ,
iv
3?IJI
w30 UID
MV 1Oa(Oad
.r
i �•
A
'tip•:
c�
ti...a �.
.