HomeMy WebLinkAboutCity Council Item No. 04CITY OF /ham.
LADE C LSIlYO1ZE
` DREAM EXTREME.
REPORT TO CITY COUNCIL
TO: HONORABLE MAYOR
AND MEMBERS OF THE CITY COUNCIL
FROM: ROBERT A. BRADY
CITY MANAGER
DATE: APRIL 12, 2011
SUBJECT: NOTICE OF COMPLETION FINAL CHANGE ORDER
LAKESHORE DRIVE STREET IMPROVEMENTS
FROM VISCAYA STREET TO KANSAS STREET
PROJECT NO. 4345
Background
On April 14, 2009, City Council approved the contract award for professional services to
Winzler & Kelly for the preparation of engineering plans and specifications for the
Lakeshore Drive Street Improvements from Viscaya Street to Kansas Street. Based.on,
the plans prepared by Winzler & Kelly, on September 22, 2009, City Council approved
the transfer of $530,000 from the FY2008/2009 Pavement Management Program to
fund the project construction, contingency, inspection, survey and geotechnical
services. Staff published the project for bid and of the nine (9) bids received, City
Council awarded the construction contract to the lowest bidder, Elite Bobcat Services,
Inc.
Discussion
Elite Bobcat Services, Inc. completed the contract and change order work on March 31,
2011 in conformance with the approved plans and specifications. The asphalt cap was
placed the day before the storm sequence in late December. Due to the intensity and
duration of this storm the asphalt concrete cap experienced raveling and stripping of the
fine aggregates. Due to this damage, the City rejected the asphalt concrete cap and
requested the contractor to contact Asphalt Pavement and Recycling Technologies, Inc.
(APART) to determine the exact cause of this failure and to recommend corrective
measures that would assure the long term viability of the pavement. APART
recommendation was to remove 2-1/2 inches of the failed asphalt areas and slurry seal
the project limits to replace the fines that were stripped away and to provide a neat
uniform clean appearance. The completion of slurry seal was delayed due to the
temperature requirements of when placing slurry seal.
AGENDA ITEM NO. 4
Page 1 of 8
Notice of Completion
April 12, 2011
Page 2
Fiscal Impact
The Lakeshore Drive Street Improvements from Viscaya Street to Kansas Street was
funded by the following accounts:
Measure "A
$546,406.00
Prop 42
$166,200.00
Prop 1 B
$ 80.000.00
Total Project Budget
$792,606.00
Final Project Costs:
Design Engineering/Design Management $ 74,841.00
EBS Inc $ 582,916.50
Contract Change Orders $ 31,219.07
KDM Meridian Survey $ 18,745.00
City & County Soil Engineering and Testing Corp $ 12,126.25
Inspection and Contract Administration $ 61,395.00
Total 781,242.82
Recommendations
1. Approve Change Order No. 1 and Change Order No. 2 (Final) in the total amount of
$31,219.07
2. Authorize the City Manager to execute contract Change Order No.1
3. Accept the improvements into the City maintained system
4. File the Notice of Completion with the County Recorder
5. Release all retention monies 35 days after the filing of the Notice of Completion
Prepared by: Peter Ramey 6?4-1
Project Engineer
Ken Seumalo ?K
Director of Publii"s
Approved by: Robert A. Brady
City Manager
Attachments: Vicinity Map
Change Order Not, Change Order No. 2 (Final)
Notice of completion
Page 2 of 8
<
~7
//may Xi
PROJECT AREA \ r'
ti
1
-
>1 I
y ~y ~~vr~~y
~ 0 66
330 X660 Feel
CITY OF .ice
LADE 'LSI OKE LAKESHORE DRIVE OVERLAY .
~ DREAM EXTREME
PROJECT ID NUMBER: STR-0031 Prepared By:
City Of Lake Elsinore PROJECT NUMBER: 4345 Lake Elsinore GIS
130 S. Main St.
Lake Elsinore, CA 92530
(951) 674-3124
v .lake-elsinore.org
Data Sources:
Riverside County GIS
City of Lake Elsinore GIS
Stateplane Nad83
Page 3 of 8
CITY OF LAKE ELSINORE
130 S. MAIN STREET
LAKE ELSINORE, CA 92530
(951) 674-3124
PROJECT CHANGE ORDER CHANGE ORDER # 1
DATE: April 1, 2011
THIS CHANGE ORDER IS APPLICABLE TO:
CITY PROJECT # 4345
PROJECT TITLE: Lakeshore Drive Street Improvements
From Viscaya Street to Kansas Street
Authorized by: Ken Seumalo
Director Public Works
CONTRACT AWARDED TO:
Elite Bobcat Services, Inc.
DATE AWARDED: August 24, 2010
SCHEDULED COMPLETION DATE:
March 31, 2011
TOTAL AMOUNT OF CONTRACT
PRIOR TO THIS CHANGE ORDER
$582,916.50
CONTRACTOR IS AUTHORIZED TO MAKE THE FOLLOWING CHANGES:
The bid quantities are adjusted to actual quantities as follows:
QUANTITIES
INCREASED
BID
BID
AS-BUILT
ADJUSTED
UNIT
ITEM No.
DESCRIPTION
QUANTITY
QUANTITY
QUANTITY
PRICE
EXTENSION
7
Roadway Excavation
3,400.00
3,578.00
178.00
26.00
$4,628.00
8
8" Commercial Driveway
750.00
1,142.00
392.00
5.25
$2,058.00
9
Type 6 Curb and gutter
140.00
467.50
327.50
23.50
$7,696.25
10
4" PCC Sidewalk STD DWG 214-A
1,556.00
2,575.00
1,019.00
3.00
$3,057.00
12
Cross Gutter and Sprandal
396.00
1,518.00
1,122.00
6.00
$6,732.00
14
Subgrade Reinforcing Grid
800.00
1,083.00
283.00
3.40
$962.20
17
AC Paving
3,350.00
3,479.66
129.66
64.00
$8,298.24
21
Install Survey Monument Wells
6.00
8.00
2.00
550.00
$1,100.00
23
Adjust Water Valves to Grade
15.00
19.00
4.00
250.00
$1,000.00
QUANTITIES
DECREASE
D
BID
BID
AS-BUILT
ADJUSTED
UNIT
ITEM No.
DESCRIPTION
QUANTITY
QUANTITY
QUANTITY
PRICE
EXTENSION
13
Variable Depth Cold Plane
20,500.00
20,000.00
-500.00
0.35
-$175.00
15
Class If Aggregate Base
4,500.00
3,583.76
-916.24
13.00
-$11,911.12
16
Pavement Reinforcing Fabric
7,000.00
6,500.00
-500.00
1.30
-$650.00
18
AC Drainage Swell
2,000.00
1,000.00
-1,000.00
5.50
-$5,500.00
19
6" Asphalt Dike STD DWG 207
600.00
400.00
-200.00
8.00
-$1,600.00
22
Adjust Manhole to Grade
20.00
15.00
-5.00
1,000.00
-$5,000.00
I V IAL $10,695.57
THE AMOUNT OF THE CONTRACT WILL BE (INCREASED) BY THE
SUM OF $10,695.57
Page 4 of 8
Change Order No. 1
THE CONTRACT PERIOD WILL
BE INCREASED DAYS
REVISED COMPLETION DATE
Review by: Initials
Project Engineer:
Director Public Works:
City Manager:
0 Days
March 31, 2011
CONTRACT TOTAL $593,612.07
(Incl. this Change Order)
Date Approved by:
Date
Contractor
Page 5 of 8
CITY OF LAKE ELSINORE
130 S. MAIN STREET
LAKE ELSINORE, CA 92530
(951) 674-3124
PROJECT CHANGE ORDER CHANGE ORDER # 2
DATE: April 1, 2011
THIS CHANGE ORDER IS APPLICABLE TO:
CITY PROJECT # 4345
PROJECT TITLE: Lakeshore Drive Street Improvements
From Viscaya Streeet to Kansas Street
Authorized by: Ken Seumalo
Director Public Works
CONTRACT AWARED TO:
Elite Bobcat Services, Inc.
DATE AWARED: August 24, 2010
SCHEDULED COMPLETION DATE:
March 31. 2011
TOTAL AMOUNT OF CONTRACT
PRIOR TO THIS CHANGE ORDER
$593,612.07
CONTRACTOR IS AUTHORIZED TO MAKE THE FOLLOWING CHANGES:
The bid quantities are adjusted to actual quantities as follows:
QUANTITIES INCREASED
ITEM
QUANTITY
UNIT PRICE
EXTENSION
Add additional CMS Bored
1 L.S.
$1,661.00
$1,661.00
Reimburse Contractor for Caltrans Permit
1 L.S.
$3,842.00
$3,842.00
Add Block Wall at Vicaya Street
1 L.S.
$7,050.00
$7,050.00
Over Excavation Bad Subgrade
1 L.S.
$2,916.00
$2,916.00
Relocate Signs at Catch Basin
1 L.S.
$464.00
$464.00
Install New Hand Hold Vault
1 L.S.
$1,092.00
$1,092.00
Install T-Lock Grade Rings & Weld Joints
5 Each
$1,100.00
$5,500.00
QUA
NTITIES DECREASE
D
ITEM
QUANTITY
UNIT PRICE
EXTENSION
Back Charge Soil Technican Time
1 L.S.
-$2,001.50
-$2,001.50
1 U I AL 4)LU,S23.5u
THE AMOUNT OF THE CONTRACT WILL BE (INCREASED) BY THE
SUM OF $20,523.50
Page 6 of 8
Change Order No. 2
THE CONTRACT PERIOD WILL CONTRACTTOTAL $614,135.57
BE INCREASED DAYS 0 Days (Incl. this Change Order)
REVISED COMPLETION DATE March 31, 2011
Review by:
Initials Date Approved by:
Date
Project Engineer:
Director Public Works:
City Manager:
Contractor
Page 7 of 8
RECORDING REQUESTED BY
AND WHEN RECORDED MAIL TO:
Name Virginia Bloom, City Clerk
Street 130 South Main Street
Address
city 8' Lake Elsinore CA 92530
State
Notice is hereby given that:
S
R
U
PAGE
SIZE
DA
MISC
LONG
RFD
COPY
M
426
Y
NCOR
SMF
NCHG
CTY
UNI
NOTICE OF COMPLETION
1. The undersigned is owner or corporate officer of the owner of the interest or estate stated below in the property hereinafter described:
2. The full name of the owner is City of Lake Elsinore
3. The full address of the owner is 130 South Main Street
4. T9i nature of the inter s or e t ig of the owner is in fee.
thm Citv owned F4oac~ ~tlpht-of -Way
(if ancerthenfee, stoke In Fear-and lnsen.for exemge. Lurgwsarunder conbad of purchase: or'lesseel
5. The full names and full addresses of all persons, if any, who hold title with the undersigned as joint tenants or as tenants in common are:
NAMES ADDRESSES
6. A work of improvement on the property hereinafter described was completed on 03/31/2011 . The work done was
Street improvements on Lake Shore Drive
7. The name of the contractor, if any, for such work of improvement was EBS General Engineering. Inc.
-1320 East 6th -Street. Suite 100 Corona. CA 92879
(If no oanb . nowaAOf bnprovMnentes awfiob. Insan Tone) (Dateotcont acg
8. The property on which said work of improvement was completed is in the city of Lake Elsinore ,
County of Riverside , State of California, and is described as follows: Street Improvement on Lakeshore Drive
between Kansas Street and Viscaya Street City Project Number 4345
9. The street address of said property is Not Applicable
(it no street address lees been offidally cerebral, insen'nona)
Dated:
V,..re of own., ofwttporsto officer of owrsj
Mayor Ci" yln5 rat aprkegtisinore
VERIFICATION
1, the undersigned, say: I am the Director of Public Works / City Engineer the declarant of the foregoing
(TeraIdeat of- 'Manager of- 'A Partner ol; ')cone, of; ee.)
notice of completion; I have read said notice of completion and know the contents thereof; the same is true of my own knowledge.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on , 20 11 , at Lake Elsinore , California.
(Date of signature) (Qty whehe algned)
(Pars ,net signature of the IndNidual who Is swearing that the contents of the nonce of
compi.tIo. are Page 8 of 8