HomeMy WebLinkAbout11/09/2006 CC/RDA Study Session
kOBMT I. ......GD. MAVOR WWW,LAKE-ELSINOR.E.ORG
Jwl-'TL"'I'NER.MAVORPROTEM (951)674-3124 PHONE
~~eY, cQc,N:CILMAN (951) 614-2392 FAX
, IWtVl;;~~ COt1NCILMAN LAKE El3INORE CULTURAL CENTER
G~ULL&YtCOONClLWOMAN 183 NOaTHMA~STREET
aoaERT A. fllW)V, (:ITY MANAGER LAKE ~~ CA 91530
.....****....***...*...:"..........*****..*...**.....*.*.*..*.....**.***.*...**
;, j.
TIII1RSDAY, NOVEMBER 9, 2006 - IMMEDIATELVFOLLOWING THE
' , " , , JOINT CITY COUNCIL AND
PUBLIC SAF~'tY.ADVISORY
OOMMlSSIONSTUDY SESSION
'If'you are attending this, Joint City CtJUllciVRedevelopment Agency Study
Session pleflSe puk in .the Parking Lot across the street'from the 'Cultural
, . f;enter. This will "'.,.116 in Iiltliting the impact of meetings on ihl! lJ9wntown
Busi"ess District.Tlt.ank you for your cooperation! .
. - . ( , , ," ., .
~LTOOIW.m
P~M;~~~3~, ,,' "
(Ple~ read&'oomplete a Speaker's Form at the Podium, prior to the Start,
of~(;ity Council Study Session.)
I1~CU~SJON~
A. Civic Center.
, ',:a..
,'~ .' . ,~:. ~" ~/"
'/ .
/"'""
CITY OF LAKE ELSINORE
Civic Center Study Session - November 9,2006
TABLE OF CONTENTS
Tab Page
Executive Summary Summary 1
Types of Facilities Facilities
Narrative 3
Table 1 6
Table 2 7
Potential Civic Center Sites Si tes
Narrative 8
Table 3 9
/"'"" Maps Maps
Map of All Sites
Down Town Area
Site No.1 - Main St./ Freeway
Site No.2 - Main St./Heald Ave.
Site No.3 - Main St./Franklin St.
Site No.4 - Limited Ave./Langstaff St.
Site No.5 - Limited Ave./Spring St.
Site No.6 - Lakepoint Park
Site No.7 - Diamond Dr.
Site No.8 - East Side of Freeway
Site No.9 - Chaney St./Hwy 74
Financing & Funding Financing 13
Minutes - August 17, 2006 Study Session Appendix A
Detailed Cost Analysis of Potential Civic Center Sits Appendix B
/"'""
Estimated Timeline for Project Completion Appendix C
,--..
CITY OF LAKE ELSINORE
Civic Center Study Session - November 9,2006
Executive Summary
Summary of August 17, 2006 Study Session
At the last study session on August 17,2006, City Council described the
types of facilities they would like to see in a Civic Center and the potential
locations. The minutes for the meeting are included as Appendix A.
Types of Facilities
r---
. City Hall
. Council Chambers
. Library
. Post Office
. Fire Station
. Office for Federal, State and County Agencies
. Campus Approach
. Parking Structure
Potential Locations
. Main Street
. Main Street - Close to the Freeway Entrance
· Main Street - Other Side of the Freeway
. Limited and Langstaff
. Limited and Spring
. Lakepoint Park
. Diamond Drive
· Chaney and Highway 74 area
· Downtown Area
,........-
/'""'
CITY OF LAKE ELSINORE
Civic Center Study Session - November 9, 2006
Executive Summary, (Continued)
Summary of November 9,2006 Study Session
For the November 9, 2006 study session, staff has:
/'""'
· Determined preliminary size needed for each facility, which
included meetings with the Post Master and School District
and phone discussions with Library Staff and the Fire Chief.
· Analyzed Civic Center fit for each site
. Determined an estimated total Civic Center cost including
land, building, parking, site preparation, off-site
improvements and contingency
. Analyzed the cost of a parking structure verses the on
ground parking
. Analyzed the financing and funding
The underlying assumptions used in preparing the material for the
November 9,2006 presentation are included and are presented so
that the City Council and staff can modify them as needed to
accomplish the desired objectives for a new Civic Center.
/'""'
2
CITY OF LAKE ELSINORE
Civic Center Study Session - November 9, 2006
r'
Types of Facilities
Based on the types of facilities proposed by City Council at the August 17,
2006 study session, staff has organized three versions of a "Civic Center"
that build upon each other:
A. City Hall, Council Chambers and a Library
B. Add School District Administration Building
C. Add Other Federal, State and County Offices
The separation is primarily made so that a project cost subtotal can be
calculated for the City funded facilities. Staff proposes that the School
District and any other Agency office be funded by those entities. Tables 1
and 2 on page 6 and 7 summarize the space and cost for each facility and
provide subtotals for each version. Table 2 compares the cost of "on
~ ground parking" to the cost of a parking structure.
Ci ty Hall
The development of a larger City Hall to meet the needs of a growing
community is warranted. The existing City Hall contains approximately
16,000 square feet and contains 66 employees. For the purpose of this
analysis, a 42,000 square foot City Hall is being considered. This size of
building would provide additional office space for new employees to meet
the needs of the City as it grows. Along with increased office space, the
City Hall would also have additional conference/meeting rooms, increased
on-site storage capacity for documents, plans, records, etc. and a larger
lobby and facilities to serve the public. A detailed space analysis would be
conducted as part of the design process.
A conservative estimate for cost of construction is $400/ sf. The estimate is
based on consultation with an architect who has recently bid out two other
public facilities.
~
3
CITY OF LAKE ELSINORE
Civic Center Study Session - November 9,2006
/'"'
Types of Facilities
Parking is estimated based on one space per 250 sf. of building floor area.
Based on the estimates provided by the City Engineer, an asphalt parking
lot would cost approximately $4.00/ sf. A two to three story concrete
parking structure costs approximately $12,000 per parking space. Each
story of a parking structure
Council Chambers
Staff is proposing a 3,200 sf. single story Council Chamber. Staff proposes
to keep the Cultural Center as a "Cultural Center" for public use.
Library
City staff contacted the Graham library staff and determined that 23,000 sf.
to 25,000 sf. was desired.
/'"'
Post Office
The City Manager met with the local acting Post Master. Staff was
informed that the funding for constructing a new post office is not likely
within the next few years since Federal funding is now being focused on
rebuilding the hurricane damaged New Orleans area and other areas along
the Gulf of Mexico.
Fire Station
City Staff spoke with the Fire Chief about the possibility of transplanting
Station 10 in the downtown area to the new Civic Center. The Fire Chief
mentioned that Station 10 was recently remodeled and is meeting existing
needs. He also said that if the station was moved too far from where it is
now, the move may leave pockets of the City where the response time
exceeds the minimum standard.
~
4
CITY OF LAKE ELSINORE
Civic Center Study Session - November 9,2006
/"'"'""
Types of Facilities
Other County, State, or Federal Offices
The City Manager met with the Superintendent and other School District
staff to discuss the potential of including School District administrative
office at the new Civic Center. The School District has been looking at land
to build a 45,000 sf administrative office facility. They are considering land
located along Chaney.
/"'"'""
At this time, no other Federal, State or County Agencies have been
approached other than asking the Chief of Police to review their facility
needs and consider participation. At the August 17, 2006 study session, it
was mentioned that the City Hall should provide office space for our
County Supervisor. Staff plans to contact the Supervisor's office to discuss
the subject. Staff also plans to contact County staff and request that they
consider locating part of their operations at the new Civic Center, either as
a stand-alone facility on the "Total Government Campus" or in office space
located within City Hall.
",......
5
~
CITY OF LAKE ELSINORE
Civic Center Study Session. November 9, 2006
Estimated Size Cost of a "Civic Center"
Table 1
Buildings & Features
Acres
Construction
Cost/Sf.
400
400
14
400
Total Cost
Est. No. of
People
150
200
City Hall (3 stories x 14,000 sf = 42,000)
Council Chambers
Parking Lot Construction No. Parking
Acres SqFt Cost/Sf. Total Cost S aces
City Hall 1.54 67,200 7.50 $ 504,000 168
Council Chambers 0.46 20,000 7.50 150,000 50
Total Building & Parking (Ground Parking) Foot Print
Acres
SqFt
81,200
23,200
20,000
48,300
Total Cost
$ 17,304,000
1,430,000
280,000
9,476,000
No. Parking
Spaces
150
200
City Hall (3 stories)
Council Chambers
6
Table 1
--
CITY OF LAKE ELSINORE
Civic Center Study Session - November 9, 2006
Estimated Size Cost of a "Civic Center"
Table 2
Parking Structure Construction No. Parking
Acres SqFt Cost/Sf. Total Cost S aces
City Hall 0.77 33,600 60.00 $ 2,016,000 168
Council Chambers 0.23 10,000 60.00 600,000 50
Campus Setting
0.42 18,400 1,104,000 92
Construction No. Parking
Parking Lot Less Parking Structure Acres SqFt Cost/Sf. Total Cost S
aces
City Hall 0.77 33,600 (52.50) (1,512,000)
Council Chambers 0.23 10,000 (52.50) (450,000)
Campus Setting
-----
7
Table 2
~
CITY OF LAKE ELSINORE
Civic Center Study Session - November 9,2006
Potential Civic Center Sites
City Council identified various potential locations for a Civic Center at the
August 17,2006 study session. Staff has numbered and named the sites for
reference purposes as follows:
,,-..
Site No.
1.
2.
3.
4.
5.
6.
7.
8.
9.
Site Name
Main St./Freeway
Main St./Heald Ave.
Main St./Franklin St.
Limited Ave./Langstaff St.
Limited Ave./Spring St.
Lakepoint Park
Diamond Dr.
East Side of Freeway (Porto Romano)
Chaney St./Hwy. 74 Area
Table 3 on page 10 summarizes the acreage for each site and how it
compares to the total acres required for the three versions of a "Civic
Center". The total acreage for each Civic Center Version is based on the
foot print of the building assuming a 3 story City Hall and a two story
Library. All sites but 1 and 3 are large enough sites to accommodate at
least Civic Center Version A. Site 2 and 8 are not large enough to fit the
Civic Center Versions B and C.
If a two story parking structure is used instead of on ground parking, all
sites would work except for site 1, which only has 1.01 acres available.
Table 3 also summarizes the grand total estimated Civic Center cost
including land, building, parking, site preparation, off-site improvements
and contingency. The cost of land includes the fair market value of land,
improvements, if any, relocation costs according to the U.S. Uniform
Relocation Assistance and Real Property Acquisition Policies Act and
California Government Code. See Appendix B for more details.
I""'"
8
CITY OF LAKE ELSINORE
Civic Center Study Session - November 9, 2006
~
Potential Civic Center Sites
During the previous study session, the Mayor had listed various sites in
order of preference. All of the Council members voiced a desire to see the
new Civic Center located in the Downtown area as a top priority. After
careful consideration of the sites, Staff recommends that the City Council
select the top 4 sites and eliminate the other sites.
Staff's recommendation for the top 4 sites based on fit and location are as
follows:
2. Main St./Heald Ave.
4. Limited A ve./Langstaff St.
5. Limited A ve./Spring St.
8. East Side of Freeway (Porto Romano)
~
,,-...
9
r---
CITY OF LAKE ELSINORE
Civic Center Study Session - November 9, 2006
Estimated Size Cost of a "Civic Center"
Table 3
Is There Enough Space? (Yes/No)
Civic Center Civic Center Civic Center
Sites - Land Estimated Version A Version B Version C
Acres Land Cost 3.96 Acres 5.96 Acres 6.56 Acres
1. Main St./Freeway 1.01 $ 566,280 No No No
2. Main St./Heald Ave. 3.96 3,002,840 Yes No No
3. Main St./Franklin St. 3.54 2,301,341 No No No
4. Limited Ave./Langstaff St. 8.04 909,097 Yes Yes Yes
5. Limited Ave./Spring St. 10.02 4,826,810 Yes Yes Yes
6. Lakepoint Park 11.65 1,149,984 Yes Yes Yes
7. Diamond Dr. 18.69 8,171,856 Yes Yes Yes
8. East Side of Freeway (Porto Romano) 4.10 2,722,500 Yes No No
9. Chaney St./Hwy. 74 Area Various Various Yes Yes Yes
-"'""
Site Prep, Total Est.
Total Est. Other Offsite Cost of
Sites - Total Estimated Project Cost Cost of Imprmnts & Building,
Estimated Building & 10% Parking &
Acres Land Cost Parking Contingency Land
1. Main St./Freeway 1.01 $ 566,280 $28,490,000 $ 2,960,628 $ 32,016,908
2. Main St./Heald Ave. 3.96 3,002,840 28,490,000 3,204,284 34,697,124
3. Main St./Franklin St. 3.54 2,301,341 28,490,000 3,134,134 33,925,475
4. Limited Ave./Langstaff St. 8.04 909,097 28,490,000 2,994,910 32,394,007
5. Limited Ave./Spring St. 10.02 4,826,810 28,490,000 3,386,681 36,703,491
6. Lakepoint Park 11.65 1,149,984 28,490,000 3,018,998 32,658,982
7. Diamond Dr. 18.69 8,171,856 28,490,000 3,721,186 40,383,042
8. East Side of Freeway (Porto Romano) 4.10 2,722,500 28,490,000 3,176,250 34,388,750
9. Chaney St./Hwy. 74 Area - - 28,490,000 2,904,000 -
r---
10
Table 3
CITY OF ~
LAKE ,6LSiNOR...E
~ ORE.AM EXTREME
~ PRfPAREDBY,
4Il> CI fY OF lAKE ELSINORE (,IS
AUGUST 16 2006
DA T A SOURCES
COUNTY OF RIVERSIDE GIS
LAKE ~LSJNOREGrS CITY OF LAKE ElSINORE GIS
V STATEPlANE NAD 83
CITY Of ~
LAKE 6LSiNORI:
~ DREAM EXTREME
CITY OF LAKE ELSINORE
CIVIC CENTER STUDY
DOWNTOWN AREA
PREPARED BY:
\D CiTY OF LAKE EISINOREGIS
AUGLJ ST J 6 2006
DATA SOURCES
COUNTY OF RIVERSIDE GIS
LAKEf'.LSINOREGIS CITY OF LAKE ELSINORE GIS
'"" STATEPLANE NAD 81
CITY OF ~
LAKE 6LSiNORJ:
~ DREAM EXTREME
CITY OF LAKE ELSINORE
CIVIC CENTER STUDY
SITE No.1 - MAIN ST.lFREEWAY
PREPARED BY:
\D CITY OF LAKE ELSINORE GIS
AU(,UST 16 2006
DATA SOURCES
COUNTY OF RIVERSIDE GIS
LAKEC!.LSINOREGIS CITY OF LAKE ELSINORE GIS
V STATEPLANE NAD 83
CITY OF ~
LAKE 6LSiNORI:
~ DR[AM E)(TR[ME
CITY OF LAKE ELSINORE
CIVIC CENTER STUDY
SITE No.2 - MAIN ST./HEALD AVE.
PREPARED BY'
\D CITY OF LAKE EI SINORE GIS
AUGUST 16. 2006
DATA SOURCES
COUNTY OF RIVERSIDE GIS
LAKE C!.LSINOREGIS CITY OF LAKE ELSINORE GIS
V STATE PLANE NAD 83
CITY OF ~
LAKE 6LSiNORt
V DREAM EXTREME
CITY OF LAKE ELSINORE
CIVIC CENTER STUDY
SITE NO.3 - MAIN ST./FRANKLIN ST.
PREPARED BY
\n CITY Of LAKE ELSINORE GIS
AUGUST] 6 2006
DA1A SOURCES
COUNTY Of RIVERSIDE GIS
lAKE C!.lSINOREGIS CITY Of LAKE ELSINORE GIS
\J STATEPIANE NAD 83
CITY OF ~
LAI(]: 6LSiNORt
~ DREAM EXTREME
PREPARED BY:
\D CITY Of LAKE ElSINORE GIS
AUGUST] 6 2006
DATA SOURCES
COUNTY Of RIVERSIDE GI>
SITE No.4 - LIMITED AVE./lANGSTAFF ST.LAKEOLSINOREGIS ~~:~E~~;~~fN~61~fREG[S
CITY OF LAKE ELSINORE
CIVIC CENTER STUDY
UTY OF ~.
LAKE 6LSINORJ:
~ DREAM E;XTREME
CITY OF LAKE ELSINORE
CIVIC CENTER STUDY
SITE NO.5 - LIMITED AVE.lSPRING ST.
PREPARED BY'
'" CITY OF LAKE ElSINORE GIS
AUGUST 16 2006
DATA SOURCES
COUNTY OF RIVERSIDE GIS
LAKE o::!.LSINOREGIS CITY OF LAKE ELSINORE GIS
U STATEPLANE NAD 83
CITY OF ~
LAl(f: 6LSiI10RI:
~ DREAM EXTREME
CITY OF LAKE ELSINORE
CIVIC CENTER STUDY
SITE No.6 - LAKEPOINT PARK
PREPARED BY
\9....... CITY OF. LAKE ELSINORE GIS
AUGUST 16. 2006
DATA SOURCES,
COUNTY OF RIVERSIDE GIS
LAKEfhSINOREGIS CITY OF LAKE ELSINORE GIS
"'" STATEPLANE NAD 83
~ITY OF ~
LAIQ: 6LSiNORJ:
~ DRIAM EXTREME
CITY OF LAKE ELSINORE
CIVIC CENTER STUDY
SITE No.7 - DIAMOND DR.
PRE PARED BY.
~ CITYOfLAKEEISINOREGIS
AUGUST 16 2006
DATA SOURCES
COUNTY Of RIVERSIDE GIS
LAKE ~LSINOREGIS CITY Of LAKE ELSINORE GIS
IJ STATEPLANE NAD 83
CITY OF ~
LAKE ,6,LSiNORE
~ DREAM EXTREME
CITY OF LAKE ELSINORE
CIVIC CENTER STUDY
SITE No.8 - EAST SIDE OF FREEWAY
PREPARED BY
\1\ CITY OF LAKE EISINOREG1S
AUGUST] 6 2006
DATA SOURCES
COIJNTY OF RIVERSIDE GIS
lAKE ~LS]NOREGIS CITY OF LAKE ELSINORF GIS
V STATEPLANE NAD 83
CITY OF h~
LAKE ,6,LSiNORI:
~ DREAM EXTREME
CITY OF LAKE ELSINORE
CIVIC CENTER STUDY
SITE No.9 - CHANEY ST./HWY 74
PREPARED BY.
\D CITY OF LAKE EISINOREGIS
AUGUST 16 2006
DATA SOURCES
COUNTY OF RIVERSIDE GIS
LAKE ClLSINOREGIS CITY OF LAKE ELSINORE GIS
IJ STATEPLANE NAD 83
CITY OF LAKE ELSINORE
Civic Center Study Session - November 9,2006
r-
Financing and Funding
Type of Bonds
Lease financing (either Lease Revenue Bonds or Certificates of
Participation). City leases City Hall from a financing authority. Probably
will create a new authority but could use an existing one. Lease Financing
is the only type of financing available to City without a vote. Payment of
debt service is a General Fund obligation.
Timing of Sale
r-
Bonds are not sold until construction bids are received. It is considered too
risky to sell bonds prior to that time. Project Cost Estimates are often less
than the construction bids. Since the City cannot make lease payments
until the project is complete and it takes possession of the project, it is
important to establish there is sufficient money to complete the project and
to establish a realistic timeframe for project completion. It is estimated that
the sale of bonds will occur in approximately 2 years. For the purposes of
this study, a net construction fund of $40,000,000 was assumed. See pages
13 through 15. Interest on the bonds will have to be capitalized during the
construction period. A one-year construction period is assumed. See
Appendix C for a detailed estimated project timeline.
Bond Structure and Interest Rates
The options include bond insured (Fixed Rate - AAA Rating), Variable
Rate - (letter of credit - AAA Rating) and unrated (fixed rate - no credit
enhancement). At the present time after figuring in costs, the 3 bond
structures are fairly close in terms of net interest rate and overall costs to
the city. Prior to the issuance of bonds, changes in interest rates could
dictate which structure is bested suited for the City. For the purposes of
the initial analysis, it was assumed a bond insured issue at an interest rate
of 4.5%.
/"""'
11
CITY OF LAKE ELSINORE
Civic Center Study Session - November 9,2006
/"'
Financing and Funding
A credit analysis will have to be performed to see if the City would qualify
for bond insurance or a letter of credit. This should be performed at the
end of the 2006/07 and the 2007108 fiscal years to see how General Fund
revenues are affected by the economy.
Other one time funding is available such as the Public Building Impact Fee,
potential sale or lease of existing City Hall and General Fund unallocated
revenue.
Public Building Impact Fee
The City has collected over $500,000 to-date and is projected to collect over
$3,000,000 before construction begins.
/"'
Sale or Lease of Existing City Hall
At a lease rate of $.90 cents a square foot, the City would collect
approximately $14,400 per month or $172,800 per year. As an alternative, if
the City sold the property, the sales proceeds would be approximately
$4,400,000 (16,000 sf. X $275/sf.).
It would take approximately 34 years until the accumulation of lease
revenue exceeded the value of the property assuming a 2% growth rate
applied to both the annual lease payments and to the total fair market
value.
,,-....
12
/"" SOURCES AND USES OF FUNDS
City Hall Study
Bond Insurance (AAA)
Dated Date 11/01/2008
Delivery Date 11/01/2008
Par Plus: Less:
Sources of Funds Amount Accrued Discount Total
Bond Proceeds:
Term Bond 43,560,000.00 43,560,000.00
43,560,000.00 0.00 0.00 43,560,000.00
Par Plus: Less:
Uses of Funds Amount Accrued Discount Total
Project Fund Deposits:
Construction Fund 40,000,000.00 40,000,000.00
Other Fund Deposits:
Reserve Fund 376,996.50 376,996.50
Capitalized Interest 1,960,200.00 1 ,960,200.00
2,337,196.50 2,337,196.50
Delivery Date Expenses:
/"' Cost ofIssuance 400,000.00 400,000.00
Underwriter's Discount 217,800.00 217,800.00
Bond Insurance 603,194.40 603,194.40
1,220,994.40 1,220,994.40
Other Uses of Funds:
Additional Proceeds 1,809.1 0 1,809.10
43,560,000.00 0.00 0.00 43,560,000.00
,,-.
Nov 5,2006 5:30 pm Prepared by Rod Gunn Associates
13
Page 1
/""'" BOND DEBT SERVICE
City Hall Study
Bond Insurance (AAA)
Dated Date 11/01/2008
Delivery Date 11/01/2008
Annual
Period Debt Bond Total
Ending Principal Coupon Interest Debt Service Service Balance Bond Value
11/01/2008 43,560,000 43,560,000
05/01/2009 980,100.00 980,100.00 43,560,000 43,560,000
11/01/2009 980,100.00 980,100.00 1,960,200 43,560,000 43,560,000
05/01/2010 980,100.00 980,100.00 43,560,000 43,560,000
11/01/2010 980,000 4.500% 980,100.00 1,960,100.00 2,940,200 42,580,000 42,580,000
05/01/2011 958,050.00 958,050.00 42,580,000 42,580,000
11/01/2011 1,020,000 4.500% 958,050.00 1,978,050.00 2,936,100 41,560,000 41,560,000
05/01/2012 935,100.00 935,100.00 41,560,000 41,560,000
11/01/2012 1,065,000 4.500% 935,100.00 2,000,100.00 2,935,200 40,495,000 40,495,000
05/01/2013 911,137.50 911,137.50 40,495,000 40,495,000
11/01/2013 1,115,000 4.500% 911,137.50 2,026,137.50 2,937,275 39,380,000 39,380,000
05/01/2014 886,050.00 886,050.00 39,380,000 39,380,000
11/01/2014 1,165,000 4.500% 886,050.00 2,051,050.00 2,937,100 38,215,000 38,215,000
05/01/2015 859,837.50 859,837.50 38,215,000 38,215,000
11/01/2015 1,220,000 4.500% 859,837.50 2,079,837.50 2,939,675 36,995,000 36,995,000
05/01/2016 832,387.50 832,387.50 36,995,000 . 36,995,000
11/01/2016 1,275,000 4.500% 832,387.50 2,107,387.50 2,939,775 35,720,000 35,720,000
/""'" 05/01/2017 803,700.00 803,700.00 35,720,000 35,720,000
11/01/2017 1,330,000 4.500% 803,700.00 2,133,700.00 2,937,400 34,390,000 34,390,000
05/01/2018 773,775.00 773,775.00 34,390,000 34,390,000
11/01/2018 1,390,000 4.500% 773,775.00 2,163,775.00 2,937,550 33,000,000 33,000,000
05/01/2019 742,500.00 742,500.00 33,000,000 33,000,000
11/01/2019 1,455,000 4.500% 742,500.00 2,197,500.00 2,940,000 31,545,000 31,545,000
05/01/2020 709,762.50 709,762.50 31,545,000 31,545,000
11/01/2020 1,520,000 4.500% 709,762.50 2,229,762.50 2,939,525 30,025,000 30,025,000
05/01/2021 675,562.50 675,562.50 30,025,000 30,025,000
11/01/2021 1,585,000 4.500% 675,562.50 2,260,562.50 2,936,125 28,440,000 28,440,000
05/01/2022 639,900.00 639,900.00 28,440,000 28,440,000
11/01/2022 1,660,000 4.500% 639,900.00 2,299,900.00 2,939,800 26,780,000 26,780,000
05/01/2023 602,550.00 602,550.00 26,780,000 26,780,000
11/01/2023 1,730,000 4.500% 602,550.00 2,332,550.00 2,935,100 25,050,000 25,050,000
05/01/2024 563,625.00 563,625.00 25,050,000 25,050,000
11/01/2024 1,810,000 4.500% 563,625.00 2,373,625.00 2,937,250 23,240,000 23,240,000
05/01/2025 522,900.00 522,900.00 23,240,000 23,240,000
11/01/2025 1,890,000 4.500% 522,900.00 2,412,900.00 2,935,800 21,350,000 21,350,000
05/01/2026 480,375.00 480,375.00 21,350,000 21,350,000
11/01/2026 1,975,000 4.500% 480,375.00 2,455,375.00 2,935,750 19,375,000 19,375,000
05/01/2027 435,937.50 435,937.50 19,375,000 19,375,000
11/01/2027 2,065,000 4.500% 435,937.50 2,500,937.50 2,936,875 17,310,000 17,310,000
05/01/2028 389,475.00 389,475.00 17,310,000 17,310,000
11/01/2028 2,160,000 4.500% 389,475.00 2,549,475.00 2,938,950 15,150,000 15,150,000
05/01/2029 340,875.00 340,875.00 15,150,000 15,150,000
11/01/2029 2,255,000 4.500% 340,875.00 2,595,875.00 2,936,750 12,895,000 12,895,000
05/01/2030 290,137.50 290,137.50 12,895,000 12,895,000
11/01/2030 2,355,000 4.500% 290,137.50 2,645,137.50 2,935,275 10,540,000 10,540,000
05/01/2031 237,150.00 237,150.00 10,540,000 10,540,000
11/01/2031 2,465,000 4.500% 237,150.00 2,702,150.00 2,939,300 8,075,000 8,075,000
~. 05/01/2032 181,687.50 181,687.50 8,075,000 8,075,000
11/01/2032 2,575,000 4.500% 181,687.50 2,756,687.50 2,938,375 5,500,000 5,500,000
Nov 5, 2006 5:30 pm Prepared by Rod Gunn Associates 14 Page 2
~ BOND DEBT SERVICE
City Hall Study
Bond Insurance (AAA)
Annual
Period Debt Bond Total
Ending Principal Coupon Interest Debt Service Service Balance Bond Value
05/01/2033 123,750.00 123,750.00 5,500,000 5,500,000
11/01/2033 2,690,000 4.500% 123,750.00 2,813,750.00 2,937,500 2,810,000 2,810,000
05/01/2034 63,225.00 63,225.00 2,810,000 2,810,000
11/01/2034 2,810,000 4.500% 63,225.00 2,873,225.00 2,936,450
43,560,000 31,839,300.00 75,399,300.00 75,399,300
~
~
Nov 5, 2006 5:30 pm Prepared by Rod Gunn Associates
15
Page 3
APPENDIX A
r---
MINUTES
JOINT CITY COUNCILIREDEVELOPMENT AGENCY
STUDY SESSION
CITY OF LAKE ELSINORE
183 NORTH MAIN STREET
LAKE ELSINORE, CALIFORNIA
THURSDAY, AUGUST 17,2006
********************************************************************
CALL TO ORDER
Mayor Magee called the Joint Study Session to order at 4:00 p.m.
ROLL CALL
PRESENT:
COUNCILMEMBERS: HICKMAN, KELLEY,
SCHIFFNER, MAGEE
r---
ABSENT:
COUNCILMEMBERS: BUCKLEY
Also present were: City Manager Brady, Community Development Director
Preisendanz, Lake & Aquatic Resources Director Kilroy and City Clerk Ray.
PLEDGE OF ALLEGIANCE
The Pledge of Allegiance was led by Mayor Magee.
INVOCATION - MOMENT OF SILENT PRAYER
Mayor Magee led the Joint Study Session in a moment of silent prayer.
PUBLIC COMMENTS
None.
DISCUSSION ITEM
~
Agenda Item No.
Page] of6
APPENDIX A
APPENDIX A
PAGE 2 STUDY SESSION MINUTES - AUGUST 17,2006
r-
A. Feasibility Study for a Civic Center.
City Manager Brady gave an overview of the item. He noted that staff was
looking for direction from Council. He noted that the location and what was
going to be included in the Civic Center needed to be determined.
City Manager Brady indicated that he had spoken to other cities regarding their
facilities. He noted that other cities had done a "space and needs analysis". He
noted that this was the first step of the process. He indicated that $125
thousand was set aside in the budget for the study relating to a Civic Center.
City Manager Brady noted that the current City Hall was an estimated 9,900
square feet and that it was maxed out. He noted that the Cultural Center was an
estimated 3,500 square feet. He noted Murrieta was looking at a 35,000 square
foot City Hall and Temecula was looking at a 90,000 square foot City Hall. He
noted that both City Halls were in the process of being built.
Mayor Magee suggested starting with the types of facilities that Council would
like to see included in a new Civic Center.
r-
Councilmember Kelley noted that she would like to see a library included. She
noted that she would like for the library to be in the 2,500-3,000 square foot
range. She noted that a City Hall and Council Chambers would also be great to
include. She noted that a post office was a good idea if it could be included.
Mayor Pro Tern Schiffner noted that he would like to see a library, fire station
and post office included as part of the Civic Center. He noted that he was not in
favor of building a City Hall that was too big.
Councilmember Hickman inquired what the requirements were going to be for a
new City Hall.
City Manager Brady commented that he felt the City Hall needed to be
somewhere in the range of 30,000-40,000 square feet. He noted that a study
needed to be done in terms of what the needs are.
Councilmember Hickman inquired if the library and community center should
be conjoined.
,--
Agenda Item No.
Page 2 of6
APPENDIX A
APPENDIX A
PAGE 3 STUDY SESSION MINUTES - AUGUST 17,2006
r--
City Manager Brady noted the benefits of joining the facilities. He noted that
he did not have a preference.
Councilmember Hickman noted that he would like the post office located on
Main Street. He suggested keeping some services available at the current City
Hall.
Mayor Magee noted that he was in support of a library. He noted in respect to
Mayor Pro Tern Schiffner's comment, he would go with a campus approach.
He noted that the City needed a definite answer from the post office as to
whether they were going to be a part of the new Civic Center or not. He noted
that he and Councilmember Buckley met with them 3 years ago and they
indicated that they have the money, but nothing has happened since and there
was a lack of communication.
Mayor Magee noted that in regard to Mayor Pro Tern Schiffner's comment
about including a fire station, the City needed to hear from the Fire Chief as to
whether or not the current facility can continue to be maintained or if it needed
to be included in the Civic Center.
r--
Mayor Magee noted that if Pyramid Enterprises went through, the Lake
Department would have a satellite office. He noted that he felt both the Lake
Department and Public Works needed to have a point of contact at the main
City Hall.
Mayor Magee noted that he would like to look at providing office space and
counter space for Riverside County. He commented on the City of Escondido's
City Hall and how they have one continuous counter to serve the public. He
noted that he would like to provide office space for County, State and Federal
government. He noted that he would like to take an approach to include
everything to create a "hub" so that it would be a total government campus.
Councilmember Kelley agreed with the Mayor's idea of a government campus.
She noted that a location needed to be determined. She noted that City Hall
would be a better entrance to Main Street.
Mayor Pro Tern Schiffner commented that he was in favor of building a Civic
Center on Main Street close to the freeway entrance. He noted that it would
help revitalize the downtown area. He indicated that he was very cautious of
",.--
Agenda Item No.
Page 3 of6
APPENDIX A
APPENDIX A
PAGE 4 STUDY SESSION MINUTES - AUGUST 17,2006
~
the library. He commented on his past experience with the City of Long Beach
and how eventually the library was only open 2 days a week.
Councilmember Kelley noted that it would be her anticipation that the library
on Graham would be closed down.
Councilmember Hickman noted that he was not in favor of placing a library in
the center of the Civic Center.
Councilmember Kelley commented that a bigger library was needed. She noted
that there was already $3 million set aside.
Mayor Magee commented on the possible sale of existing facilities.
~
Mayor Magee suggested several locations for a possible Civic Center site.
First, he noted Main Street as a possibility. He noted that there was a developer
that wanted to develop mixed use on the other side of the freeway on Main
Street. Second, he noted Limited and Langstaff as a possibility. He suggested
working with the County Supervisor's office to purchase the land. Third, he
noted Limited and Spring as a possibility. He noted that if DR Horton was not
going to move forward, it would be an opportunity to have a focal point at the
end of Main Street. Fourth, he noted Lakepoint Park as a possibility. He noted
that the Senior Center was already there. He noted that the City owned the
property. Fifth, he noted the Diamond Drive area as a possibility. He noted
that it would create a need for more office space. He noted that it created
energy for other entities to be drawn to that location. Last, he mentioned
Chaney and Highway 74 area. He noted that it would be his last option.
Mayor Magee noted that his suggestions were in descending order.
Councilmember Kelley inquired what would be included in the cost.
City Manager Brady noted that the cost would be driven by the facilities that
Council had requested. He noted that ideas for the facilities and location would
playa big factor in the cost.
Councilmember Kelley noted that she would like to keep the Civic Center in the
downtown area.
/"'"
Agenda Item No.
Page 4 of6
APPENDIX A
APPENDIX A
PAGE 5 STUDY SESSION MINUTES - AUGUST 17,2006
---
Mayor Pro Tern Schiffner noted that he would like consideration of a parking
structure. He noted that it would help better utilize the land and allow for more
parking. He noted that he would like to see a satellite office for the County
Supervisor in the new Civic Center.
Councilmember Hickman noted that Main Street was his first choice for a
location. He noted that it would help revitalize downtown.
Mayor Magee requested an update in the next 6 weeks.
City Manager Brady clarified Council's ideas and suggestions. He commented
on the campus style atmosphere. He noted that the downtown area was the
preferred location. He noted that the location would be based on space analysis.
He agreed with Council on having all the agencies in one localized area.
ADJOURNMENT
THE JOINT CITY COUNCILIREDEVELOPMENT AGENCY STUDY
SESSION WAS ADJOURNED AT 4:47 P.M.
~.
ROBERT E. MAGEE, MAYOR
CITY OF LAKE ELSINORE
GENIE KELLEY, CHAIRWOMAN
REDEVELOPMENT AGENCY
Respectfully su bmitted,
MICHELLE SOTO, DEPUTY CITY CLERK
I""'"'
Agenda Item No.
Page 5 of6
APPENDIX A
r-,
~
~
PAGE 6 STUDY SESSION MINUTES - AUGUST 17,2006
ATTEST:
FREDERICK RAY, CITY CLERK
Agenda Item No.
Page 6 of6
APPENDIX A
APPENDIX A
/""".
CITY OF LAKE ELSINORE
Civic Center Study Session - November 9, 2006
Cost Analysis of Potential Civic Center Sites
APPENDIX B
/"""
/"""
1
APPENDIX B
CITY OF LAKE ELSINORE
Civic Center Study Session - November 9, 2006
Cost Analysis of Potential Civic Center Sites
APPENDIX B
/"""'
/"""'
Calculated Calculated (Unrou
Recorded land land & Indepen. Relocation nded) Buildl
Site APN Value Estimate Improv. Estimate Expenses Acres Use Improv
1 377-243-001 $150,000 $277,477 0.49 COMM No
1 377-243-002 $49,014 $96,268 0.17 VACANT No
1 377-243-003 $49,014 $96,268 0.17 VACANT No
1 377-243-004 $49,014 $96,268 0.17 RES LOT No
TOTAL $297,042 $566,280 1.00 0
2 373-023-010 $340,000 $101,930 $289,180 $323,852 $1,425 0.18 SFR Yes
2 373-023-011 $3,991 $73,616 0.13 VACANT No
2 373-023-012 $3,991 $84,942 0.15 VACANT No
2 373-023-015 $41,616 $84,942 0.15 COMM No
2 373-023-024 $567,018 $466,092 $848,439 $12,675 1.07 COMM Yes
2 373-023-025 $41,616 $67,954 0.12 COMM Parking
2 373-023-026 $3,825 $11,326 0.02 COMM Parking
2 373-025-006 $0 $192,535 0.34 RDA No
2 373-025-007 $0 $96,268 0.17 RDA No
2 373-025-008 $61,200 $192,535 0.34 VACANT No
2 373-025-009 $59,460 $96,268 $230,768 $292,426 $1,425 0.17 SFR Yes
2 373-025-014 $100,000 $118,919 0.21 COMM No
2 373-025-022 $141 ,183 $96,268 0.17 RESTAURANT Parking
2 373-025-023 $141,183 $96,268 $201,817 $12,675 0.17 RESTAURANT Yes
2 373-025-024 $10,000 $16,988 0.03 COMM No
2 373-025-026 $187,272 $271,814 0.48 COMM No
TOTAL $1,702,355 $2,068,664 $2,878,310 $2,974,640 $3,002,840 3.90 4
3 374-162-039 $1,716 $62,291 0.11 RDA No
3 374-162-041 $1,141 $62,291 0.11 RDA No
3 374-162-043 $1 ,140 $56,628 0.10 RDA No
3 374-162-045 $1 ,140 $56,628 0.10 RDA No
3 374-162-047 $563 $56,628 0.10 RDA No
3 374-162-049 $563 $56,628 0.10 RDA No
3 374-162-051 $565 $62,291 0.11 RDA No
3 374-162-053 $565 $62,291 0.11 RDA No
3 374-162-055 $565 $62,291 0.11 RDA No
3 374-162-057 $565 $62,291 0.11 RDA No
3 374-162-059 $565 $67,954 0.12 RDA No
3 374-162-061 $670 $67,954 0.12 RDA No
3 374-163-001 $74,908 $96,268 0.17 COMM No
3 374-163-002 $74,908 $101,930 0.18 COMM No
3 374-163-003 $74,908 $78,408 0.18 COMM No
3 374-163-004 $233,049 $317,117 0.56 COMM No
3 374-163-005 $6,176 $107,593 0.19 VACANT No
3 374-163-006 $52,299 $107,593 $419,793 $389,832 $1 ,425 0.19 SFR Yes
3 374-163-007 $34,200 $209,524 $244,742 $12,675 0.37 COMM Yes
""'
2
APPENDIX B
CITY OF LAKE ELSINORE
Civic Center Study Session - November 9, 2006
Cost Analysis of Potential Civic Center Sites
APPENDIX B
/"'-,
~
Calculated Calculated (Unrou
Recorded Land Land & Indepen. Relocation nded) Buildl
Site APN Value Estimate Improv. Estimate Expenses Acres Use Improv
3 374-163-008 $18,581 $107,593 0.19 COMM No
3 374-163-009 $7,142 $107,593 0.19 VACANT No
TOTAL $585,929 $1,969,783 $2,317,202 $2,287,241 $2,301,341 3.52 2
4 374-252-001 $0 $0 2.69 CITY Yes
4 374-252-002 $0 $631,620 1.45 COUNTY Yes
4 374-261-018 $74,718 $0 0.53 COUNTY Yes
4 374-261-023 $302 $0 2.84 COUNTY Parking
4 374-261-029 $154,000 $277,477 0.49 STORE Yes
TOTAL $229,020 $909,097 8.00 4
5 374-263-001 $150,858 $419,047 0.74 COMM No
5 374-263-002 $101,334 $402,059 0.71 COMM No
5 374-263-003 $2,705 $11,326 0.02 COMM No
5 374-263-004 $240,811 $209,524 $386,551 $12,675 0.37 SERVICE STATION Yes
5 374-263-005 $16,463 $84,942 0.15 COMM No
5 374-263-006 $32,285 $158,558 0.28 COMM No
5 374-271-003 $91,800 $203,861 0.36 COMM No
5 374-271-004 $183,600 $407,722 0.72 COMM No
5 374-271-007 $1,252,560 $2,173,644 4.99 COMM No
5 374-271-013 $1,020 $50,965 0.09 COMM No
5 374-271-015 $1,020 $124,582 0.22 COMM No
5 374-283-001 $26,535 $84,942 $105,590 $2,150 0.15 MULTI FAMILY Yes
5 374-283-002 $12,484 $181,210 0.32 VACANT No
5 374-291-003 $13,394 $101,930 0.18 RES LOT No
5 374-291-004 $0 $0 0.73 CITY/COMM No
5 374-291-005 $0 $0 0.03 CITY/COMM No
5 374-291-007 $0 $0 0.39 CITY No
TOTAL $2,126,869 $4,614,311 $4,811,985 $4,826,810 10.45 2
6 373-300-027 $108,086 $1,149,984 2.64 SENIOR CENTERlRDA Yes
6 373-300-028 $0 $0 9.83 LAKEPOINT PARK/CITY Yes
TOTAL $108,086 $1,149,984 12.47 2
7 373-210-037 $357,000 $1,180,476 2.71 COMM No
7 373-210-038 $1,132,200 $3,807,144 8.74 COMM No
7 373-210-039 $744,600 $2,522,124 5.79 COMM No
7 373-210-043 $193,636 $662,112 1.52 COMM No
TOTAL $2,427,436 $8,171,856 18.76 0
8 377-330-005 $10,039 $2,722,500 6.25 VACANT No
TOTAL $10,039 $2,722,500 6.25 0
~
3
APPENDIX B
/'""
CITY OF lAKE ELSINORE
Civic Center Study Session - November 9, 2006
Cost Analysis of Potential Civic Center Sites
APPENDIX B
Comparable Asking Prices of land for Sale Along Main St., Spring St. and Line St.
/'""
Cost/Square
Site DescriDtion Cost Acreage Foot Lot DescriDtion Contact
Main Street & Freeway 1,100,000 0.64 39.46 Vacant Land 909-797-7171
Main Street & Freeway 1,150,000 0.69 38.26 Vacant Land 951-718-7651
Main Street and Flint 900,000 0.33 62.94 Vacant Land 951-545-0739
Main Street and Pottery 650,000 0.16 90.91 Vacant Land 951-545-0739
Main Street and Pottery 1,250,000 1.12 25.62 Vacant Land 951-894-8203
Main Street and Franklin 450,000 0.50 20.66 Vacant Land 951-894-8203
Main Street and Franklin 200,000 0.17 26.67 Vacant Land 951-894-8203
228 Spring Street 572,674 0.16 82.17 Residential w/Structure 951-244-7131
305 Line Street 850,000 0.41 47.59 Residential w/Structure 949-683-0061
206 Main Street 325,000 0.17 43.89 Residential w/Structure 760-809-7486
/'""
4
APPENDIX B
APPENDIX B
r--
CITY OF LAKE ELSINORE
Civic Center Study Session - November 9,2006
Potential Civic Center Sites
Estimated Land Cost Assumptions
The cost of land was calculated by assigning $13 per square foot for
properties below 1 acre in size and $10 per square foot for properties equal
to and above 1 acre in size. These prices represent the highest amounts
suggested after consultation with a licensed real estate appraiser. In fact,
the appraiser recommended prices of $10 and $2 for the two groups of lot
sizes, respectively. After conducting a survey of current area asking prices,
which found prices of approximately $20 to $90 per square foot, the $13
and $10 amounts appeared more prudent. While these asking prices appear
inflationary given what properties are actually selling for according to the
appraiser, selecting the highest prices provided by the appraiser should
help accommodate the dynamics of purchasing property not currently on
the for-sale market in a conservative manner.
/""'
Land and existing improvements were calculated separately and lumped
together in the "Calculated Land and Improvements" column. There were
a total of 14 properties with existing improvements. The price for the
properties with single family residences ("SFR") was estimated with an
online real estate appraisal service. All properties with existing
improvements of any kind were calculated according to prices suggested
after consultation with a licensed real estate appraiser. The prices used
were $175 per square foot for buildings over 1,000 square feet and $250 per
square foot for buildings below 1,000 square feet. For buildings where
there was no recorded square footage, cost estimates were obtained by
adding the estimated land value to an original improvement value
recorded in County records inflated by 50%. The estimates did not directly
take into account the age or condition of the properties, but the selling
prices of comparable properties in the area were relied on as a proxy.
r--
Properties already owned by the City were assumed to carry a $0 cost,
despite any present debt owed on such properties. The price of land owned
5
APPENDIX B
APPENDIX B
r-
CITY OF LAKE ELSINORE
Civic Center Study Session - November 9,2006
Potential Civic Center Sites
Estimated Land Cost Assumptions, (Continued)
by the RDA was calculated, but existing improvements were not included
in those estimates because a reliable figure for such improvements was not
available at the time of this study.
In the case of discrepancies in the acreage of the properties between
County records and GIS measurements, the study utilizes the most reliable
figure after a careful review of all sources, including the actual parcel map.
It should be noted, however, that the discrepancies were few in number
and accounted for just over an acre variance between the total acreage of all
9 sites.
r-
Private properties with improvements were assumed to be occupied.
Relocation activities must comply with California Government Code
Sections 7260-7277. For properties with occupants, including businesses
and residents, relocation and displacement costs were estimated according
to the payment schedules provided by the U.S. Uniform Relocation
Assistance and Real Property Acquisition Policies Act and California's
Government Code. For purposes of estimating moving expenses, SFRs
were assumed to contain 5 rooms of furniture and Multi-Family housing
were assumed to house 8 rooms per building. Business relocation expenses
were estimated with the aforementioned payment schedule and the
California Government Code assuming 4 rooms of furniture, $500 for
replacement search expenses (50% of the $1,000 maximum), $5,000 in
business reestablishment costs (50% of the $10,000 maximum), plus $500
per month to act as a contingency for miscellaneous encumbrances,
including debt service payments for business equipment financed by the
owner, for a period of 12 months. The 12 month period was assumed to be
the length of business displacement. Utility disconnection and connection
costs, closing costs, recording fees, differential payments for increased
rents, reimbursement for loss of business goodwill, attorneys' fees for
r-
6
APPENDIX B
APPENDIX B
".--
CITY OF LAKE ELSINORE
Civic Center Study Session - November 9,2006
Potential Civic Center Sites
Estimated Land Cost Assumptions, (Continued)
assistance in zoning issues, owner/employee salary commitments, costs
potentially due under Gov. Code Section 7263, 7264, or 7265, or the cost of
obtaining a soil analysis at a replacement site were not included in the
estimate, but are suggested for more detailed evaluations. In lieu of the
payments above, businesses may elect to discontinue their business and
receive a fixed relocation payment equal to their average annual net
earningsl, between $1,000 and $20,000, in accordance with Government
Code Section 7262. It must be noted that the length and costs of
displacement and relocation will vary with each business, residence,
location, and negotiation, but shall always be structured to provide fair and
just compensation for related relocation expenses.
~
In all, this study provides conservative estimates suitable for comparing
each of the proposed sites. Upon selection of the preferred sites,
subsequent studies will more critically analyze this data in order to provide
greater reliability in the development process.
",-.-
1 Government Code Section 7262 defines the term "average annual net earnings" as /lone-half of any net
earnings of the business or farm operation before federal, state, and local income taxes during the two
taxable years immediately preceding the taxable year in which the business or farm operation moves
from the real property being acquired, or during any other period as the public entity determines to be
more equitable for establishing earnings, and includes any compensation paid by the business or farm
operation to the owner, his or her spouse, or his or her dependents during the two-year or other period./I
7
APPENDIX B
CITY OF LAKE ELSINORE APPENDIX C
CIVIC CENTER
--
ESTIMATED TIMELlNE FOR PROJECT COMPLETION
No. Item Est. Timeline / Range
1 SITE SELECTION
a. Select a consultant 2.0 mos
b. Consultant prepares a report
- Constructability-grading, etc. 1.5 mos
- Cost of purchasing 1.0 mo
- Circulation access 0.5 mo
- Willingness of owner to sell 1.0 mo
6.0 to 12.0 mos
2 SITE ACQUISITION
a. Select realty firm 2.0 mos
b. Prepare three (3) appraisals for site 1.0 mo
c. Acquire property 2.5 mos
d. City Council approves acquisition 0.5 mo
Note: If the use of eminent domain is required, the timeframe would increase significantly. 6.0 to 18.0 mos
3 ARCHITECTURAL FIRM SELECTION
-- a. Mail out request for proposals (RFPs) to several
architectural firms / or Design Contest 2.5 mos
b. Committee selects the architect firm 0.5 mo
c. City Council approves selection 0.5 mo
d. Architectural firm prepares several conceptual building designs 2.0 mos
e. City Council selects one building design concept. 0.5 mo
f. Architect makes a 50% plan presentation to the City, and
receives comments. 3.0 mos
g. Architect completes plans, specifications and cost 3.0 mos
estimates. Plans include:
1) Building Final Plans & Specs
2) Parking Lot Design
3) Landscaping & Irrigation Plans
4) Traffic Circulation Plans
12.0 to 18.0 mos
4 CONSTRUCTION
a. Advertise Plans 30 Days 1.0 mo
b. Open bids 0.5 mo
c. City Council awards contract to low bidder 0.5 mo
d. Contractor starts construction 0.5 mo
e. Project completed 9.0 mos
-- 12.0 to 18.0 mos
Operational within 3 to 5 years - TOTAL 36.0 to 60.0 mos
APPENDIX C