HomeMy WebLinkAboutCC Reso No 2010-037RESOLUTION NO. CC-2010-037
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF LAKE ELSINORE, CALIFORNIA, CERTIFYING THE
FINAL ENVIRONMENTAL IMPACT REPORT
(SCH#2009031084) FOR THE DIAMOND SPECIFIC PLAN
AND RELATED CASES.
WHEREAS, applications have been filed with the City of Lake Elsinore by JIC-
CP Diamond Development (the "Developer") for General Plan Amendment No. 2009-01,
Zone Change No. 2009-01, East Lake Specific Plan Amendment No. 9 and Diamond
Specific Plan No. 2009-01 relating to properties located at Assessor's Parcel Nos. 363-
150-001 thru -005, -012, and -034, -035; and 363-162-024,-025,-027,-030,-039,-041,
and -044 and -037; 365-280-022; 371-030-035; 373-210-021, -030, -032, -037 thru -
039, -041, thru -043, and -045; ("the Properties"); and.
WHEREAS, the Properties are located south of Lakeshore Drive, east of the Inlet
Channel, west of Mission Trail and north of the Summerly Homes project (the "Site");
and
WHEREAS, these applications together comprise the "project" as defined by
Section 21065 of the California Environmental Quality Act (CEQA), Cal. Public
Resources Code § 21000 et seq. A project is defined as an activity which may cause
either a direct physical change in the environment, or a reasonably foreseeable indirect
physical change in the environment and which includes the issuance to a person of a
lease, permit, license, certificate, or other entitlement for use by one or more public
agencies; and
WHEREAS, the Environmental Impact Report for the project has been prepared
to evaluate environmental impacts resulting with the project; and
WHEREAS, Section 21081.6 of CEQA requires that where an EIR has been
prepared for a project for which mitigation measures are adopted, that a mitigation
monitoring or reporting program be adopted for said project, and pursuant to Section
21081.6 of CEQA, the City has prepared and updated a Mitigation Monitoring and
Reporting Program; and
WHEREAS, the Planning Commission of the City of Lake Elsinore has been
delegated with the responsibility of making recommendations to the City Council for
certifying Environmental Impact Reports, and their recommendation is for certification;
and
WHEREAS, public notice of said applications has been given, and the City
Council has considered evidence presented by the Community Development
CITY COUNCIL RESOLUTION NO. CC-2010-037
PAGE 2 of 5
Department and other interested parties at public hearings held with respect to this item
on June 22nd, 2010; and
WHEREAS, in accordance with Section 15164 of the State CEQA Guidelines,
preparation of the Final Supplemental Environmental Impact Report for the project was
selected as the most appropriate document for compliance with CEQA, utilizing criteria
set forth therein.
NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE,
CALIFORNIA, DOES HEREBY DETERMINES AS FOLLOWS:
FINDINGS OF FACT AND OVERRIDING CONSIDERATION
1. The City Council has reviewed and considered the Final EIR for the Diamond
Specific Plan and related cases and finds that it is complete, adequate in its
evaluation of all environmental effects of the proposal, contains all required
information, and has been completed in compliance with CEQA and the City's CEQA
requirements.
2. The Diamond Specific Plan and its related cases will result in significant unavoidable
air quality impacts regardless of mitigation measures. A Statement of Overriding
Considerations has been prepared in accordance with Section 15093 of the CEQA
Guidelines. The Statement of Overriding Considerations "balances" the proposed
project against its unavoidable environmental effects.
3. The EIR, which was prepared in accordance with Section 15163 of the State CEQA
Guidelines, includes the Draft SEIR, Response to Comments document, Mitigation
Monitoring and Reporting Program, Findings of Fact, and Statement of Overriding
Considerations.
4. The EIR identified several significant environmental effects resulting from
implementation of the project. Some of these significant effects can be fully
avoided/mitigated through the adoption of feasible mitigation measures. To the
extent that these findings conclude that various proposed mitigation measures
outlined in the Final EIR are feasible and have not been modified, superseded, or
withdrawn, the City hereby binds itself to implement these measures. These findings
are not merely informational, but rather constitute a binding set of obligations that
will come into effect when the City Council formally approves the project.
5. The mitigation measures and/or the standard design features and construction
measures are referenced in the Conditions of Approval and Mitigation Monitoring
and Reporting Program adopted concurrently with these Findings, and will be
implemented through the final design, construction and post-construction periods.
CITY COUNCIL RESOLUTION NO. CC-2010-037
PAGE 3 of 5
6. Two environmental effects cannot be reduced to less than significant levels by the
adoption of feasible mitigation measures or feasible environmentally superior
alternatives: 1) Implementation of the Project would result in both project-and
cumulative-level operational emissions that exceed SCAQMD thresholds. 2)
Implementation of the Project would contribute to long-term increases in greenhouse
gases (GHGs) as a result of traffic increases (mobile sources) and minor secondary
fuel combustion emissions from space heating, etc. Development occurring as a
result of the Project would also result in secondary operational increases in GHG
emissions as a result of electricity generation to meet project-related increases in
energy demand. Short-term GHG emissions will also derive from construction
activities. In summary, the Project's GHG contribution to global climate change
would be cumulatively significant.
7. In balancing the benefits of the proposed Project against its unavoidable
environmental risks, the City Council reviewed the following overriding
considerations:
Social
• The project will create a vibrant mixed use development consistent with the
City's development goals for the Ballpark District.
• The project will provide housing for the City of Lake Elsinore and Inland
Empire's growing population. The Diamond Specific Plan offers 600 additional
dwelling units above that previously allowed in the East Lake Specific Plan for
this area.
• The project will provide a variety of housing opportunities, ranging in size and
affordability to meet the housing needs of the region and are compatible with
the entertainment and activity function of the project area.
• The project will provide a variety of public places, including a public space
with a direct relationship to the lake, pedestrian friendly facilities, passive
areas, and linkages to surrounding citywide trails and open space.
• The project will expand the City's shopping entertainment and hospitality
opportunities for residents and visitors.
Economic
• Construction of the proposed project will generate its fair share of property tax
revenues to the City of Lake Elsinore annually.
• The project will provide commercial and retail activities to generate sales tax.
• Construction of the project will also generate transient occupancy tax
revenues to the City.
• The Project will be built out over several phases, providing steady
construction jobs over the construction period.
CITY COUNCIL RESOLUTION NO. CC-2010-037
PAGE 4 of 5
8. The City Council considered the information contained in the FEIR prior to certifying
the FEIR; and the FEIR reflects the City Council's independent judgment and
analysis. In its approval, the City Council has weighed the benefits of the project
against the significant adverse impacts identified in the FEIR that have not been
avoided or lessened through mitigation to a level of less than significant. The City
Council hereby determines that benefits of the project outweigh the unmitigated
adverse impacts and that the project should be approved.
PASSED, APPROVED AND ADOPTED at a regular meeting of the City Council
of the City of Lake Elsinore, California, this 22nd day of June 2010.
Melissa A. Melendez, Mayor
City of Lake Elsinore
AT/
Al
Carol Cowley
Interim City Clerk
APPROVED AS TO FORM:
&aL~2
B ara Leibold
City Attorney
CITY COUNCIL RESOLUTION NO. CC-2010-037
PAGE 5 of 5
STATE OF CALIFORNIA
COUNTY OF RIVERSIDE SS
CITY OF LAKE ELSINORE
I, CAROL COWLEY, Interim City Clerk of the City of Lake Elsinore, California,
hereby certify that Resolution No. CC-2010-037 was adopted by the City Council of the
City of Lake Elsinore at a regular meeting held on the 22nd day of June 2010, and that
the same was adopted by the following vote:
AYES: COUNCIL MEMBERS: BUCKLEY, HICKMAN, MAGEE, MAYOR
PRO TEM BHUTTA AND MAYOR MELENDEZ
NOES: NONE
ABSENT: NONE
ABSTAIN: NONE
Carol Cowley
Interim City Clerk