Loading...
HomeSearchMy WebLinkAbout10-14-20 - Baker Industrial (PA 2020-103) - WO 20-01310-14-20 - Baker Industrial (PA 2020-103) - WO 20-013 (2)10-24-23 - Service Requirements - 23-062AFFIDAVITAPPROVED SCOPING AGREEMENTBaker Industrial Project - DBESP AnalysisBaker Industrial Project - MSHCP Consistency AnalysisBaker Industrial Project - MSHCP Consistency Analysis (2)Baker Industrial Project - MSHCP Consistency Analysis (3)Baker Industrial Project DBESP AnalysisBaker Industrial Project DBESP Analysis (2)Baker Industrial_ENG CommentsBaker Industrial_ENG Comments #1_230921Baker Industrial_LEAP_ApplicationBaker Industrial_LEAP_Biological Technical ReportBaker PD for CEQA ConsultantBaker St ProposalBaker St. Fuel mod letter (partial approval)Baker St_Geotechnical Entitlement Level EvaluationBaker Street Industrial ENG Comments #4_ 240106Baker_Webb_Response to Comments (VMT)BUILDING AND SAFETY DEPARTMENTBUILDING AND SAFETY DEPARTMENT (2)Completed_LSA_AgreementDRC #2 ENG COMMENTSDRC #2 FIRE COMMENTSDRC #2 FIRE COMMENTS_FUEL MODDRC ENG Comments_Baker Street Industrial_201005DRC ENG Comments_Baker Street Industrial_201005 (2)evmwdFINAL NOPFIRE COMMENTS #4 (Reissued)FIRE COMMENTS_FUEL MOD #4 (Reissued)FIRE_PA 2020-103 Baker Ind TPM 2023-04 CUT 2023-10Jurisdictional Delineation Report for the Baker Industrial Project Site_20240304Jurisdictional Delineation Report for the Baker Industrial Project Site_20240304 (2)LEAP 2023-04 MSHCP Consistency Findings_April2024LEAP 2023-04 MSHCP Consistency Findings_April2024 - DA ResponsesLEAP 2023-04 MSHCP Consistency Findings_April2024 REV 04252024LEAP-2023-0004 - DBESP ANALYSISLEAP-2023-0004 - DBESP ANALYSIS (2)LEAP-2023-04_RCA_Cover Letter_04.26.2024PA 2020-103 (Baker St. Industrial) DRC #3 LOIPA 2020-103 (Baker St. Industrial) DRC #4PA 2020-103 Baker Street Industrial ParkPA 2020-103 DRC Transmittal #4PA 2020-103 PAR HFA industrial commentsPA 2020-103.PPA 2020-09. PAR LetterPA 2023-103 LOI #2 (Amended)PA2020103 - ARCH & CULTURALPA2020103 - EBA ANALYSISPA2020103 - EVMWD WATER STUDYPA2020103 - HYDROPA2020103 - HYDRO (2)PA2020103 - HYDRO (3)PA2020103 - MSHCP CONSISTENCY ANALYSISPA2020103 - MSHCP CONSISTENCY ANALYSIS (2)PA2020103 - PALEOPA2020103 - PARKING DEMAND ANALYSISPA2020103 - PHASE 1PA-2020-103 DRC SUB #2PA-2020-103 DRC SUB #3PA2020103 LETTER #3 (08.21.24)PA2020103 LETTER #3 (08.21.24) (2)PA-2020-103 Letter of Incomplete #1 (No Attachment) (2)PA-2020-103 SUB #2 COMMENT LETTERPA2020-103_Baker_Compiled Plan Set_PC4 (City Redlines)PA2020-103_Baker_Compiled Plan Set_PC4 (City Redlines) (2)PA2020103_DRC_1_TRANSMITTALRCA_JPR_Application_LEAP_2023-04RIVCO REVIEWService Requirements Letter 2024-00411-DD (EVMWD No. 4)Service Requirements Letter 2024-00411-DD (EVMWD No. 4) (2)WSA - Baker Street - Ltr to CityWSA - Baker Street - Ltr to City (2)