Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
10-14-20 - Baker Industrial (PA 2020-103) - WO 20-013
10-14-20 - Baker Industrial (PA 2020-103) - WO 20-013 (2)
10-24-23 - Service Requirements - 23-062
AFFIDAVIT
APPROVED SCOPING AGREEMENT
Baker Industrial Project - DBESP Analysis
Baker Industrial Project - MSHCP Consistency Analysis
Baker Industrial Project - MSHCP Consistency Analysis (2)
Baker Industrial Project - MSHCP Consistency Analysis (3)
Baker Industrial Project DBESP Analysis
Baker Industrial Project DBESP Analysis (2)
Baker Industrial_ENG Comments
Baker Industrial_ENG Comments #1_230921
Baker Industrial_LEAP_Application
Baker Industrial_LEAP_Biological Technical Report
Baker PD for CEQA Consultant
Baker St Proposal
Baker St. Fuel mod letter (partial approval)
Baker St_Geotechnical Entitlement Level Evaluation
Baker Street Industrial ENG Comments #4_ 240106
Baker_Webb_Response to Comments (VMT)
BUILDING AND SAFETY DEPARTMENT
BUILDING AND SAFETY DEPARTMENT (2)
Completed_LSA_Agreement
DRC #2 ENG COMMENTS
DRC #2 FIRE COMMENTS
DRC #2 FIRE COMMENTS_FUEL MOD
DRC ENG Comments_Baker Street Industrial_201005
DRC ENG Comments_Baker Street Industrial_201005 (2)
evmwd
FINAL NOP
FIRE COMMENTS #4 (Reissued)
FIRE COMMENTS_FUEL MOD #4 (Reissued)
FIRE_PA 2020-103 Baker Ind TPM 2023-04 CUT 2023-10
Jurisdictional Delineation Report for the Baker Industrial Project Site_20240304
Jurisdictional Delineation Report for the Baker Industrial Project Site_20240304 (2)
LEAP 2023-04 MSHCP Consistency Findings_April2024
LEAP 2023-04 MSHCP Consistency Findings_April2024 - DA Responses
LEAP 2023-04 MSHCP Consistency Findings_April2024 REV 04252024
LEAP-2023-0004 - DBESP ANALYSIS
LEAP-2023-0004 - DBESP ANALYSIS (2)
LEAP-2023-04_RCA_Cover Letter_04.26.2024
PA 2020-103 (Baker St. Industrial) DRC #3 LOI
PA 2020-103 (Baker St. Industrial) DRC #4
PA 2020-103 Baker Street Industrial Park
PA 2020-103 DRC Transmittal #4
PA 2020-103 PAR HFA industrial comments
PA 2020-103.PPA 2020-09. PAR Letter
PA 2023-103 LOI #2 (Amended)
PA2020103 - ARCH & CULTURAL
PA2020103 - EBA ANALYSIS
PA2020103 - EVMWD WATER STUDY
PA2020103 - HYDRO
PA2020103 - HYDRO (2)
PA2020103 - HYDRO (3)
PA2020103 - MSHCP CONSISTENCY ANALYSIS
PA2020103 - MSHCP CONSISTENCY ANALYSIS (2)
PA2020103 - PALEO
PA2020103 - PARKING DEMAND ANALYSIS
PA2020103 - PHASE 1
PA-2020-103 DRC SUB #2
PA-2020-103 DRC SUB #3
PA2020103 LETTER #3 (08.21.24)
PA2020103 LETTER #3 (08.21.24) (2)
PA-2020-103 Letter of Incomplete #1 (No Attachment) (2)
PA-2020-103 SUB #2 COMMENT LETTER
PA2020-103_Baker_Compiled Plan Set_PC4 (City Redlines)
PA2020-103_Baker_Compiled Plan Set_PC4 (City Redlines) (2)
PA2020103_DRC_1_TRANSMITTAL
RCA_JPR_Application_LEAP_2023-04
RIVCO REVIEW
Service Requirements Letter 2024-00411-DD (EVMWD No. 4)
Service Requirements Letter 2024-00411-DD (EVMWD No. 4) (2)
WSA - Baker Street - Ltr to City
WSA - Baker Street - Ltr to City (2)